September 18, 2013 Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management Flood System Repair Project (FSRP) Program.

Slides:



Advertisements
Similar presentations
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
Advertisements

Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
California Child Welfare Co-Investment Partnership Children’s Conference Monterey, California May 29, 2008.
Central Valley Flood Protection Board Meeting – September 27,
Presented by: Terri Gaines DWR FESSRO February 28, 2014 Regional Permitting for the CVFPP.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
California’s Central Valley Flood System Improvement Framework California Levees Roundtable March 27, 2009 California Levees Roundtable March 27, 2009.
1 Rebuilding the System Reducing the Risk California Water Plan – Advisory Committee August 16, 2007.
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
ENVIRONMENTAL MANAGEMENT PLAN
Education on RAC and Other CE Applications of Waste Tires Prepared for the CIWMB Meeting October 4, 2007.
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office completes Letter of Findings for internal.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Ross Valley Flood Control and Watershed Program Marin County Flood Control and Water Conservation District ~ Flood Control Zone 9 ~ Marin County Department.
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
California’s Flood Future Recommendations for Managing the State’s Flood Risk National Association of Flood & Stormwater Management Agencies December 10,
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Department of Water Resources California Levee Database (CLD) An ongoing Initiative to Collect and Catalog Data for California’s Levees and Flood Control.
Central Valley Flood Protection Board Meeting – December 20,
Flood Emergency Preparedness Darren Suen, PE, MBA, PMP Chief, Flood Operations Center Hydrology and Flood Operations Division of Flood Management Preseason.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
BUILDING STRONG SM Presentation to Society of American Military Engineers Arkansas Post St. Louis District Program Overview BY Michael G. Feldmann Assistant.
Integrated Regional Watershed Management Plan Presentation – November 21, 2013 HLVRCD.
September 4, 2012 California Department of Water Resources Central Valley Floodplain Evaluation and Delineation (CVFED) Program Presented for the FMA 2-D.
Integrated Regional Water Management MAY 22, 2015 TRACIE BILLINGTON DEPARTMENT OF WATER RESOURCES 1.
2014 IRWM Drought Grants Sierra Water Workgroup Summit June Tracie L. Billington Department of Water Resources Financial Assistance Branch.
Region Acceptance Process Draft Recommendations Workshop Department of Water Resources Sept 8, Sacramento Sept 9, Los Angeles Sept 10, Fresno.
Informational Briefing on Rural Levee Repair Guidelines Central Valley Flood Protection Board Meeting January 10, 2014 Dave Wheeldon, Flood System Sustainability.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
August 28, 2015 Meeting of the Central Valley Flood Protection Board Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management.
Partnership Analysis & Enhancement Tool Kit Cindy S. Soloe Research Triangle Institute (RTI) April Y. Vance Centers for Disease Control and Prevention.
John K. Woodling CA Department of Water Resources Integrated Regional Water Management Program Update Southern California Water Dialogue May
Safety Stand Down – Together We Will Make the Difference.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
DWR Maintenance Area Response to USACE Periodic Inspections Presented by: Noel Lerner, Chief, Flood Maintenance Office Mark List, Chief, Maintenance Support.
Presentation at HSPD-12 Workshop Ms. Jeanette Thornton May 4, 2005.
Department of Water Resources FloodSAFE Environmental Stewardship and Statewide Resources Office Gail Newton, Chief, FloodSAFE Environmental Stewardship.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Terri Wegener, P.E., DWR Briefing for Central Valley Flood Protection Board.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
Department of Water Resources Delta Flood Emergency Preparedness, Response, and Recovery Program Geoff Shaw DWR/Flood Operations Branch Division of Flood.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Central Valley Flood Protection Board Meeting – Enforcement Report 1.
National Coordinating Center for the Regional Genetic Service Collaboratives ( HRSA – ) Joan A. Scott, MS CGC, Chief, Genetics Services Branch Division.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
Welcome Update on REC activities September 25, 2012.
Planning Commission Study Session: Preferred Plan July 23, 2015.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
Don Petravick November 9, /9/2009Change Advisory Board Training1.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
June 24, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council.
K1 Proposed National Levee Safety Program An Introduction for the Tribal Assistance Coordination Group May 12, 2011.
Pavlo Oborski Grants Management Branch Chief
Tom Wolf, Governor Patrick McDonnell, PA DEP Secretary
System Safety Regulation
Presentation to Sacramento Environmental Commission May 21, 2018
Management of Pollution Risks at Activity Cessation GROUP HSE RULE (CR-GR-HSE-421) EXECUTIVE SUMMARY This rule sets the HSE requirements for the management.
Presentation transcript:

September 18, 2013 Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management Flood System Repair Project (FSRP) Program Status Briefing

Introductions and Meeting Purpose FSRP Summary Prop. 1E funded, DWR-led project to provide funding and technical assistance to LMAs for critical repairs consistent with the CVFPP FSRP Progress to date Current FSRP Activities Next Steps

Repair documented critical problems: Erosion, boils, slumps, hydraulic control structures, and channels Repair deteriorated levee patrol roads to ensure effective flood fighting capability Conduct proactive repair of minor levee problems, such as erosion sites shorter than 50 feet FSRP will cost share with LMAs to: FSRP Summary - Goals and Objectives

FSRP Progress to Date Final Guidelines posted September 4 ( mgmt/fmo/fsrp/guidelines.cfm) mgmt/fmo/fsrp/guidelines.cfm Leveed areas defined and ranked based on relative flood risk (Tiers 1/2/3) Critical sites identified and vetted with LMAs FSRP Guidelines Site Selection Notices of Eligibility Project Agreements Final Design & Construction Planning, Design and Permitting Planning, Design and Permitting

Critical Site Selection LMA collaboration throughout process Current funding sufficient all critical repairs FSRP Guidelines Site Selection Notices of Eligibility Project Agreements Final Design & Construction Planning, Design and Permitting Planning, Design and Permitting San Joaquin Valley Sacramento Valley #$ Tier 166$74.25M Tier 228$31.78M Tier 315$16.91M Total109$122.94M

Repair Types and Remedies FSRP Guidelines Site Selection Notices of Eligibility Project Agreements Final Design & Construction Planning, Design and Permitting Planning, Design and Permitting

FSRP Current Activities Planning for 66 Tier 1 Critical sites Sacramento–31 sites ($47.55M) San Joaquin–35 sites ($26.70M) Notices of Eligibility to be presented at off-site briefings with LMAs LMAs are preparing estimates of crown/access road repair needs FSRP Guidelines Site Selection Notices of Eligibility Project Agreements Final Design & Construction Planning, Design and Permitting Planning, Design and Permitting

FSRP Next Steps Negotiate Project Agreements for Tier 1 repairs with willing LMAs Critical repair sites Crest/access road repairs Assist/oversee LMA planning efforts for Tier 1 repairs Final design Environmental permitting Property acquisition Assist/oversee project implementation for Tier 1 repairs Initiate process for Tier 2/3 critical sites FSRP Guidelines Site Selection Notices of Eligibility Project Agreements Final Design & Construction Planning, Design and Permitting Planning, Design and Permitting

FSRP Next Steps – Project Implementation Project Implementation Schedule 2014: Target Project Agreements Tier 1 Rural LMAs Levee Repair, Patrol Road Gravelling, Structure Rehabilitation 2015 and Beyond: Increased Number of Project Agreements Reaching into Tier 2 and 3 Repairs Continue Reconnaissance and Outreach efforts

Repair documented critical problems Repair deteriorated levee patrol roads Conduct proactive repair of minor levee problems FSRP will cost share with LMAs to: FSRP Briefing Recap and Q&A Strong coordination with LMAs to promote LMA leadership of projects Providing effective technical support to ensure LMA’s project success Minimizing DWR resource demands with a goal of:

Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management Flood System Repair Project (FSRP)

12 Leveed Area Definition FSRP Guidelines Site Selection Notices of Eligibility Project Agreements Final Design & Construction Planning, Design and Permitting Planning, Design and Permitting Sacramento Valley San Joaquin Valley