An Outsider’s Perspective

Slides:



Advertisements
Similar presentations
The State of Natural Gas Pipelines in Fort Worth.
Advertisements

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
2010 PODS User Conference Houston, Texas October 28, 2010 PHMSA Update John A. Jacobi, P.E. CATS Manager, SW Region.
The Pipeline and Hazardous Materials Safety Administration (PHMSA) Spill Control Association of America 2014 Annual Meeting and Conference March 20, 2014.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Gathering Update Pipeline Safety – Getting to Zero Pipeline.
Pipeline Personnel Qualification
The Unique Alternative to the Big Four ® Gas Safety and Reliability Branch Management and Operations Review Report and Recommendations.
Interstate Natural Gas Association of America INGAA Action Plan to Build Confidence in Pipeline Safety INGAA Integrity Management Continuous Improvement.
AGA Perspectives on Current Pipeline Safety Regulations August 2014.
Congressional Reauthorization and PHMSA Rulemakings – Enough to avoid future tragedies? Carl Weimer, Executive Director Pipeline Safety Trust.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA Office of Pipeline Safety Kenneth Y. Lee Engineering & Research.
Railroad Commission of Texas Pipeline Safety Division.
Overview of Key Rule Features
Pipeline Safety Program Regulatory (DOT) Pipeline Risk Management Pipeline Safety Trust New Orleans, Louisiana November 16, 2007 John A. Jacobi, P.E. PHMSA.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA Update Kenneth Y. Lee Engineering & Research Division
FDA Recalls Risk Communication Advisory Committee David K. Elder Director, Office of Enforcement.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
Integrity Management Inspection Process Don Moore, OPS Central Region.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
Technical Advisory Committee December 2012 Fitness for Service.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Lessons Learned….. Were PG&E practices an anomaly or the tip of a bigger problem? How would we know? 2011 Pipeline Safety Trust Conference – Getting to.
U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16,
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Pipeline Safety Trust Fort Worth Natural Gas Production Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Integrity Management Continuous Improvement Fitness For Service and Management of Pre-Regulation Pipe Chad Zamarin Chief Operating Officer NiSource Midstream.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Part 190 NPRM: Administrative Procedures - 1 -
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview of Integrity Verification Process (IVP) Workshop Held.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
HCAs & Pipeline Assessment Intervals Is There a Need for Change? Richard B. Kuprewicz President, Accufacts Inc. For Pipeline Safety Trust New Orleans Conference.
Pipeline Safety: How the Mayor’s Council On Pipeline Safety Can Help Presentation to: Mayor’s Council on Pipeline Safety Conference Name: Christopher A.
WHAT DOES IT MEAN FOR YOUR MAOP? REAUTHORIZATION, SAN BRUNO, AND PHMSA’S ADVISORY BULLETIN.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Verification of Records Linda Daugherty – Dep Associate.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Transmission 2012 Annual Reports Joint Advisory Committees.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1 Mike Israni Senior Technical Advisor Manager: Standards & Committees.
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
Rulemaking Process and Cost Benefit Analysis
Office of Pipeline Safety Hazardous Liquid Pipeline Integrity Management July , 2002 Houston, Texas Welcome.
U.S. DOT Pipeline and Hazardous Materials Safety Administration Integrity Management Systems November 18, 2015 Chris McLaren - 1 -
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
High Consequence Areas & Pipeline Assessment Intervals Pipeline Safety Trust New Orleans, LA November 20, 2008 Elizabeth Komiskey, P.E. PHMSA/Office of.
Public Awareness Programs for Pipeline Operators WESTERN REGIONAL GAS CONFERENCE August 21, 2007 Presented by: Ross Reineke.
Who is INGAA? INGAA represents the majority of the interstate natural gas transmission pipeline companies operating in the U.S., as well as comparable.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Section 24 Pipeline Safety Standards Incorporated Into the Federal.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Regulatory Initiatives.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention Update and Damage Prevention Rulemaking Sam.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Gas Pipeline Safety Federal Regulatory Update Pete Chace Public Utilities Commission of Ohio Gas Pipeline Safety Program Manager.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
Pipeline Safety Trust Public Awareness Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
Stress Corrosion Cracking Technical Workshop Office of Pipeline Safety Research and Special Programs Administration SCC Workshop December 2, 2003 Houston,
Legislative & Regulatory Update on Validation of MAOPs of Transmission Pipelines January 17, 2012 Best Practices Kickoff Meeting Andrew Lu
Plastic Pipe Rule – Tracking and Traceability Proposed Requirements
AGA Positions on Current PHMSA Rulemakings
Nick Bonvoisin Secretary to the Convention on the
AGA Legal Forum - July 2017 Regulatory Concerns for LDCs
Presentation transcript:

An Outsider’s Perspective PHMSA’s Proposals: An Outsider’s Perspective Pipeliners Association of Houston November 4, 2013 john A. Jacobi, P.E., J.D.

Client Services pipeline data and USDOT and PHMSA records compliance. G2 Partners is a national leader in assisting pipeline owners and operators to responsively and efficiently improve their data and record systems, processes, and governance to satisfy pipeline safety laws and reduce incidents. pipeline systems integrity. G2 Partners’ pipeline systems integrity management practice focuses on ensuring quality of data, conducting disciplined risk-based integrity engineering, assuring regulatory compliance, and implementing overarching risk management processes and operating systems. Properly implemented, disciplined pipeline integrity programs can minimize lifecycle costs and asset downtime, increase safety performance and asset reliability, and significantly reduce the likelihood and consequences of major accidents. environmental & water resources. Over the past 25 years, G2 Partners’ team members have provided expert environmental services for thousands of environmental and water resource projects for all types of clients both in the USA and Latin America. In all cases, G2 Partners strives to provide cost-effective results for each client and their associated communities and stakeholders. transaction, M&A, & project development. The G2 Partners team provides expert technical and financial support to assist clients in evaluating the feasibility of transactions or project developments for all types of energy facilities. We cover all aspects of a project from transaction planning and development to implementation. We efficiently identify and quantify the key transaction or development issues, and apply integrated technical and business practical solutions. strategic consulting. G2 Partners is called upon to assist with the most challenging problems facing the energy industry. From dismantling and removing energy assets from the remote and fragile environments of Alaska to developing strategies for the cleanup and divestment of legacy liabilities in complex financial and legal transactions worth $ hundreds of millions.

2

General Outline New Secretary of Transportation Sequestration Gas Transmission NPRM New Central Region Director Public Awareness Results New Penalties Final Rule IVP (next page)

Integrity Verification Outline IVP Meeting Info Advisory Bulletins NTSB Recommendations Longhorn FONSI Recommended Presentations Draft IVP Chart Personal Observations Questions

New Secretary of Transportation Charlotte Mayor Anthony Foxx was sworn in as the nation’s 17th Secretary of Transportation Tuesday, July 2, 2013.

Discretionary activities and travel was limited. Sequestration PHMSA’s “essential functions” (e.g., operator inspections, accident investigations) continued. Discretionary activities and travel was limited. Inspection of state pipeline safety programs is apparently not an “essential function.”

(*Congressional Mandate **NTSB Recommendation) Gas Transmission NPRM ANPRM Published 8/25/2011 Major Topics under consideration: • Expand assessments beyond HCAs • Repair criteria * • Assessment methods * ** • Corrosion control • Expand gas gathering reporting requirements • Management of change • Seismicity requirements * • MAOP exceedance reporting * (*Congressional Mandate **NTSB Recommendation)

More Classes or No Classes!! Affects Integrity Management Class Location ANPRM Docket ID PHMSA–2013–0161 (8/1/13) Comment Period ends 11/1/13 More Classes or No Classes!! Affects Integrity Management

New RD - Central Region Dave Barrett stepped down and, effective June 21, 2013, Linda Daugherty assumed those responsibilities.

Public Awareness Results PHMSA held a Workshop June 19 -20, 2013 in Richardson TX http://primis.phmsa.dot.gov/meetings/MtgHome.mtg?mtg=90&nocache=6406 I have a whole separate presentation on PAP. Very few operators escaped unscathed.

Integrity Verification Process On August 7, 2013, PHMSA sponsored a public meeting in Arlington, Virginia to discuss a proposed “Integrity Verification Process” (IVP) to help address several mandates set forth in Section 23, Maximum Allowable Operating Pressure, of the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 as well as several NTSB Recommendations.

Meeting Web Site & Docket # http://primis.phmsa.dot.gov/meetings/MtgHome.mtg?mtg=91&nocache=9447 Docket Number: PHMSA-2013-0119 Access at www.regulations.gov

Advisory Bulletins Two Advisory Bulletins regarding MAOP/MOP verification: ADB 11-01, 1/10/11 ADB 2102-06, 5/7/12 One Advisory Bulletin relating to Integrity Management ADB 2012-10, 12/5/12

Advisory Bulletins The first two are focused on the data required to document MAOP/MOP – traceable, verifiable and complete. Nothing new – same rules as always – but not everyone has been paying attention. The third is even more telling.

location-specific data.” ADB 2012-10 “[PHMSA] inspectors will check to confirm that information and data gaps are aggressively being addressed and that assumptions are appropriately based on location-specific data.”

ADB 2012-10 “Operators should also be diligently working to eliminate information and data gaps throughout their entire integrity management program.” Translation: Operators need data on every joint of pipe and every valve, flange, fitting or other appurtenance to the pipeline that could affect integrity or affect MAOP.

NTSB Recommendations San Bruno, California – 9/9/10 – 39 recommendations PHMSA (16) PG&E (12) CPUC (5) U.S. Secretary of Transportation (4) INGAA and AGA (1) Governor of California (1)

NTSB Recommendations NTSB P-11-14 “. . . delete the grandfather clause and require that all gas transmission pipelines constructed before 1970 be subjected to a hydrostatic pressure test that incorporates a spike test.”

NTSB Recommendations NTSB P-11-15 (Seam Stability)- “. . . manufacturing- and construction-related defects can only be considered stable if a gas pipeline has been subjected to a postconstruction hydrostatic pressure test of at least 1.25 times the maximum allowable operating pressure.”

NTSB Recommendations NTSB P-11-17 (Piggability) – “Require . . . all natural gas transmission pipelines be configured so as to accommodate in-line inspection tools, with priority given to older pipelines.” 119,026 Total Miles Not Piggable ILI tools not commercially available for most very small lines (~ 22,018 miles of GT ≤ 4” Diameter) Motivate operators to upgrade lines to the maximum extent practicable

The Longhorn EA PHMSA announced the availability of the Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the Longhorn Pipeline Reversal Project (Project) January 2, 2013 (78 FR 146). The FONSI is available online at www.regulations.gov in docket number PHMSA–2012–0175.

The Longhorn EA The Material Documentation Plan (Section 9.3.3.3.1, page 9-40 to 9-44) is particularly significant in that it sets forth the procedures and assessments required by PHMSA where historic documentation is incomplete (i.e., historic information is insufficient to adequately demonstrate Maximum Operating Pressure 49 CFR §195.406)

The Longhorn EA The Longhorn EA is much more than just an Advisory Bulletin. While Longhorn is a Part 195 system, the underlying rationale can be applied to Part 192 systems. The rationale is not yet reflected in a rulemaking, but is a strong indicator.

Recommended Presentations All of the presentations are available on the web site (as is the video recording of the meeting). There are, however, four that are “must see”: Material_Strength_Decision_Chart_-_07-09-2013.pdf Blaine_Keener.pdf (Contains an analysis of the CY 2012 GT Annual Report submissions) Steve_Nanney.pdf (Explains the Material Strength Decision Chart) 2012_GT_Annual_Key_Data_Points_2013-07-15.pdf (the data analyzed by Blaine Keener)

Personal Observations The mileage reported with incomplete records was, in my opinion, remarkably low (only 5401 miles out of a total of almost 307,000). The numbers are changing because supplemental reports are being filed and it appears obvious that some operators did not report in the fashion that PHMSA expected. Very high level discussion – what is available now, what else is needed, and how can it be collected and analyzed.

Personal Observations NTSB does not like the grandfather clause and eventually it will be removed from the code (at least in its current form). PHMSA emphasized that 192.619(c) IS the grandfather clause and that all four portions of 192.619(a) must be available in order to identify the lowest of the four as the MAOP for a segment if the segment is not grandfathered.

Personal Observations The NTSB likes “Spike Tests” and it is likely that PHMSA will eventually publish criteria for such tests (probably based on TTO Number 6, Spike Hydrostatic Test Evaluation, July 2004, Baker & Kiefner) http://primis.phmsa.dot.gov/gasimp/docs/TTO06_SpikeHydrostaticTestEvaluation_FinalReport_July2004.pdf (or e-mail me if you want a copy)

Personal Observations Concern that this initiative (the Draft IVP Chart) is too complex was voiced. My guess is that PHMSA will be reluctant to break this down into multiple rulemakings. The current initiative does NOT include gas distribution, gas gathering or hazardous liquid lines. That said, if it works for gas transmission, it will almost certainly carry over in some form.

Personal Observations A risk-based approach similar to that used in Appendix B to Part 195 was mentioned as a possible approach but PHMSA did not offer any further comment (the regulatory deadlines found in Appendix B have expired but it appears that PHMSA MAY be receptive, in principle, to such an approach).

Personal Observations Smart pigging is a preferred approach to evaluating the condition of the pipeline but the issue of making existing non-piggable lines piggable is problematic. Pressure testing will likely be the ultimate trump card for pre-code lines and for lines which do not have traceable, verifiable and complete records.

Personal Observations The Docket Number is PHMSA-2013-0119 (accessible at www.regulations.gov). Comments may be submitted there and all previous submissions can be reviewed there. There was no indication as to when the comment period will end. The regulatory process is still “stuck in amber” and it may take several years before regulations become final.

Closing Comments If you do not have “bulletproof” records you need to be developing a plan to address your data gaps and ways to convince PHMSA that, whatever else the plan is, it is reasonable in light of 49 CFR Parts 190 -199.

Questions John Jacobi john.jacobi@g2partnersllc.com (713) 260-4039 (Office) (832) 712-3098 (Mobile) Thank YOU!!