Project Management Product Breakdown Structures (PBS) and Work Breakdown Structures (WBS)

Slides:



Advertisements
Similar presentations
TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
Advertisements

TITLE OF YOUR WORK PRESENTATION FORMAT FOR TASK 19 The purpose of the structure we are proposing is to make the work you did in the workshop understandable.
Design of a WebQuest for L2 Language WebQuest Workshop Graz, 4-8 April.
How To Write a Performance Work Statement (PWS)
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Analysing Letters 1.Do the documents do the job they were intended to do? Are they informative, persuasive or information gathering? 2.Is the layout right.
© ABB AB, Corporate Research - 1 6/1/2015 abb Work Breakdown Structure Creation.
DT211 Stage 2 Software Engineering
Group 1 NEW LITERACIES LRC 320 Jason Barton Alison Mayou Danica Koestner.
Project Time Management
Software project management (intro)
SWOT ANALYSIS A short- hand summary of a Situational Analysis.
Gymnastics KS3 Targets level 3>4 My target is to…. Plan my simple sequence in more detail ensuring it has been done before the lesson on computer if possible.
Chapter 6: Activity Planning – Part 2
 DAY 5 Using Scratch to Develop Numeracy © PDST Technology in Education/Lero 2013.
National Diploma in Systems Analysis and Design Data Flow Modelling.
5.1 Principles of Project Management. So what is Project Management? Definition: Is the process of planning, organizing, and managing tasks and resources.
Data Flow Diagrams.
Week 5: Business Processes and Process Modeling MIS 2101: Management Information Systems.
9/19/20150 WRITING by Ruth Wolff. 9/19/20151 Writing, 2 parts, 1 hr 30 mins, 25 points Part 1:Transactional based on reading 120 – 150 words, 8.
Basic Principles of Achievement Testing 4. Should be designed to fit the particular uses to be made of the results. Pretest Mastery test Diagnostic test.
A Level Computing#BristolMet Session Objectives U2#S9 MUST identify operators and operands SHOULD describe different types of operator COULD Create an.
Work Breakdown Structure Presentation. Creating the Work Breakdown Structure (WBS) Project deliverable – an interim but tangible result achieved at some.
TECHNICAL WRITING October 27, Instructions and Procedures Instructions explain how to perform a task in a step-by-step manner. They vary in length,
A Business Plan What is a business plan? What is the role of a business plan? What are the types of business plans? © Karen Devine 2009.
Geog 469 GIS Workshop Project Management.
Introduction Conclusion Process Evaluation Task Teacher Page.
SWE 4743 Responsibility Driven Design with CRC cards Richard Gesick.
Abstracting.  An abstract is a concise and accurate representation of the contents of a document, in a style similar to that of the original document.
NEM201 Week 4 Project Plan Create and complete outstanding items. 01. Front Cover 02. Document details 03. Scope Document 04. Technical Design 05. Creative.
MEMORY TRAINING IN INTERPRETING NAYDA E. MEDINA D.
An Introduction to Transmission Media
Data Flow Diagrams.
Your Poster Title Goes Here
WAYNE STATE UNIVERSITY – DETROIT, MICHIGAN
Chapter 2 : Data Flow Diagram
Data Flow Diagrams.
WAYNE STATE UNIVERSITY – DETROIT, MICHIGAN
Presentation Title First Name Last Name Country of Origin
Factors that influence network choice
Transition Year Mathematics.
Your Poster Title Goes Here
Your Poster Title Goes Here
Your Poster Title Goes Here
Your Poster Title Goes Here
Your Poster Title Goes Here
Your Poster Title Goes Here
WAYNE STATE UNIVERSITY – DETROIT, MICHIGAN
WAYNE STATE UNIVERSITY – DETROIT, MICHIGAN
WAYNE STATE UNIVERSITY – DETROIT, MICHIGAN
WAYNE STATE UNIVERSITY – DETROIT, MICHIGAN
Your Poster Title Goes Here
Work Breakdown Structure Tasks and Sub-Tasks
LEVEL 1 STRESS AWARENESS
WAYNE STATE UNIVERSITY – DETROIT, MICHIGAN
WAYNE STATE UNIVERSITY – DETROIT, MICHIGAN
Your Poster Title Goes Here
WAYNE STATE UNIVERSITY – DETROIT, MICHIGAN
Your Poster Title Goes Here
Writing reports.
1.2 Rotation Symmetry and Transformations
WAYNE STATE UNIVERSITY – DETROIT, MICHIGAN
WAYNE STATE UNIVERSITY – DETROIT, MICHIGAN
WAYNE STATE UNIVERSITY – DETROIT, MICHIGAN
Transformations: Describing rotations
Your Poster Title Goes Here
Reflection, rotation and translation
Your Poster Title Goes Here
Presentation transcript:

Project Management Product Breakdown Structures (PBS) and Work Breakdown Structures (WBS)

Objectives ► Examined PBS and WBS ► Tasks and Numbering ► Create PBS and WBS

Work Breakdown Structures and Product Breakdown Structures are usually very similar in shape and content. The difference is that if the words in the boxes are nouns then it is a PBS. If the words are verbs, i.e. describing the work which has to be done, then it is a WBS.

Numerous styles can be used for either, but the one used here for the WBS is easier to fit more detail onto. Similarly different numbering styles can be used for the levels, e.g. 1000, 1100, 1110, 2000, etc.

The Product Breakdown Structure is done first, probably only to 3 or 4 levels. This helps identify what the product (or project) consists of.

The Work Breakdown Structure is then created, often to a greater level of detail to show how the work will be organised to achieve the requirements of the Product Breakdown Structure.

Activity – Create a PBS and WBS You are a Project Manager working at a local college. You are responsible for managing the transformation of standard classroom to turn it into an IT classroom for internal and external short courses. This includes (among other things) installing all cabling, networking, Smart-board and IT equipment.

In Conclusion ► Examined PBS and WBS ► Tasks and Numbering ► Activity to create PBS and WBS ► Questions?