Why does OTEG need a charging subgroup? OTEG Open Meeting 3 July 2006.

Slides:



Advertisements
Similar presentations
Transmission Charging Developments DCMF3 rd June 2010
Advertisements

Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
Offshore Transmission Giles Stevens Head of offshore electricity transmission.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association April 2002.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Electricity Interconnectors in GB
Structure of Distribution Charges A User’s perspective David Tolley Innogy & Npower.
Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
The Next Step Chandra Trikha System Planning Manager SHETL.
John Zammit-Haber National Grid
First Phase of the European Supergrid InnoQube Conference London, 20 January 2011 Ana Aguado – CEO, Friends of the Supergrid.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
Cost trends for Offshore Wind - and a look at the resources David Milborrow
G3 Update to DCMF 22nd November Significant progress made Consultation on common methodology - May Stakeholder workshop - June Summary of responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
CREATION OF AN OFFSHORE GRID INFRASTRUCTURE Presentation to BWEA Offshore Wind Conference, 4 March 2004 Richard Mellish, DTI.
ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
OTEG Adoption group 2 August Agenda 1.Adoption group 2.Importance of issue 3.Issues to be advanced 4.Alternative Solutions 5.Process 6.TO perspectives.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
Developing a cap and floor regime for the GB-Belgium Interconnector:
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
Initial view on changes to Codes OTEG, 3 rd July 2006.
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
Location, location, location FSR Executive Seminar Which network for which market design? Martin Crouch June 2014.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Structure of Charges Year-end review for DCMF 22 November 2007.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
Transmission arrangements for distributed generation DCMF 9 April 2008 Pre consultation document.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Local asset charging arrangements DCMF April 2008.
Estimation of Long Run Capacity Costs Gas TCMF 26 th April 2006.
Industry Dialogue on xoserve Services 14 th September 2007.
Tariff Structure Statements – Energex and Ergon Energy AER public forum.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
Cost reflectivity of investment proxies
Bringing Offshore Wind to New England’s Shore Restructuring Roundtable
Fair Go Rates System Dr Ron Ben-David Chairperson
Holistic view of Charging Modifications – In flight 11th June 2018
Fair Go Rates System Dr Ron Ben-David Chairperson
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
Mod 621A Supporting analysis
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Entry Capacity Substitution
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
UNC Transmission Workstream 7th December 2006
Ofgem presentation to Gas Transmission Workstream
IFRS 15 - Revenue from Contracts with Customers
IWEA Offshore Wind Conference 2019 – Developer Led ‘v’ Centralised Grid Connections 12th September 2019.
Presentation transcript:

Why does OTEG need a charging subgroup? OTEG Open Meeting 3 July 2006

Why does OTEG need a charging subgroup? What are TNUoS charges? –Price controlled revenue and TNUoS charges How are TNUoS charges currently set? –The TNUoS charging methodology Why is a charging subgroup required? –Work needed to extend the current methodology into the offshore –Proposal

Price controlled revenue and TNUoS charges Transmission Licensees NGET SHETL SPT Price controlled revenue Users of the transmission system Generation Demand TNUoS charges GBSO

Price controlled revenue An allowed revenue is set for each transmission licensee at the price control Revenue set to recover the cost of installing, operating and maintaining the transmission system The transmission licensees’ charges – equal to the allowed revenue – are paid by the GBSO The GBSO recovers the transmission licensees’ charges from users through TNUoS charges

TNUoS charges TNUoS charges should, as far as practicable, recover the allowed revenue The GBSO charges users of the transmission system –Develop and apply a use of system charging methodology –Approved by Ofgem –To be kept under continuous review Charges are for generation or demand use of system and vary by location

Current TNUoS charging methodology (1) Separate charges for generation and demand (from 27:73 split of revenue) Two elements (£/kW): –Locational charge –Non-locational charge (or residual) Locational charge from DC loadflow investment cost related pricing (DCLF ICRP) transport model

Current TNUoS charging methodology (2) DCLF ICRP transport model assesses the marginal cost of investment in the transmission system as a result of an increase in generation or demand Model takes as the starting point an onshore system comprising secure 400 kV overhead line Adjustments for 132/275 kV line, potential line upgrades, cable, “non-firm” connections…

TNUoS charges offshore: Why a charging subgroup is required (1) Indicative charges are an important element when obtaining project financing Current charging methodology is complex, and the model parameters are not suited to offshore systems. For example: –Assumes double-circuit connection (GB SQSS compliant) –No adjustments for AC or HVDC submarine cables –Cannot accommodate “modular” offshore infrastructure –Shorter asset life of offshore infrastructure will result in higher annual revenue requirement

TNUoS charges offshore: Why a charging subgroup is required (2) Changes to the charging methodology are time consuming to develop, consult on, notify and implement Will change onshore TNUoS charges (and zones?) Number of options – must be cost-reflective and non-discriminatory Charges will be required for adopted assets

Proposal Charging subgroup established –Possibly as subgroup of the Charging Issues Standing Group (CISG) –CISG already considering changes to charging methodology to accommodate “non-firm” connections, e.g. island links Date for publication of draft methodology and indicative tariffs to be added to OTEG timetable