7/5/05,MEG DC,je MEG DC 1.Foils 2.Wires 3.Frames + tools 4.Preamplifier 5.Gas pressure control 6.final.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Jin Huang & Vincent Sulkosky Massachusetts Institute of Technology Boson 2010 Workshop Sept 20, JLab.
2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
GEM Detector Shoji Uno KEK. 2 Wire Chamber Detector for charged tracks Popular detector in the particle physics, like a Belle-CDC Simple structure using.
New Readout Methods for LAr detectors P. Otyugova ETH Zurich, Telichenphysik CHIPP Workshop on Neutrino physics.
Muon Tracker Overview The PHENIX Muon Arms detect vector mesons decaying into muon pairs, allow the study of the Drell-Yan process, and provide muon detection.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
Drift Chambers and Pattern recognisation  Fabrizio CeiPattern recognition ideas INFN & Pisa University  Hajime NishiguchiKapton foils for DC cathode.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
GEM progress from Chinese collaboration Yuxiang Zhao University of Science and Technology of China Aug 20,
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
NEW COMMENTS TO ILC BEAM ENERGY MEASUREMENTS BASED ON SYNCHROTRON RADIATION FROM MAGNETIC SPECTROMETER E.Syresin, B. Zalikhanov-DLNP, JINR R. Makarov-MSU.
MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
LRT2004 Sudbury, December 2004Igor G. Irastorza, CEA Saclay NOSTOS: a spherical TPC to detect low energy neutrinos Igor G. Irastorza CEA/Saclay NOSTOS.
Chevron / Zigzag Pad Designs for Gas Trackers
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Software and analysis Malte‘s Garfield isochronal Lines.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
The GEM activities at Tsinghua University Zhigang Xiao 1, Yan Huang 1, Rensheng Wang 1, Haiyan Gao 1,2 1 Department of Physics, Tsinghua University 2 Dept.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
3D Event reconstruction in ArgoNeuT Maddalena Antonello and Ornella Palamara 11 gennaio 20161M.Antonello - INFN, LNGS.
PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Calibration Malte‘s Garfield isochronal Lines and drift.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
CLAS12 Drift Chamber Prototyping
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Drift Chamber Review Jefferson Lab 6-8 March 2007 CLAS12 Drift Chamber Electronics R. Chris Cuevas Group Leader -- Fast Electronics Jefferson Lab Physics.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
Presentazione delle richieste immediate per l’upgrade di MEG (gruppo di Roma) Cecilia Voena Mar 15 th, 2013.
The new MEG tracker Marco Grassi INFN - Pisa Overview Timescale Tasks Funding.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
Overview of the MEG * CDCH * one of the following ( MEG UP MEG2 MEG + ) Marco Grassi on behalf of the CDCH Group.
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
MDT second coordinate readout: status and perspectives
Readiness of the TPC P. Colas What is left before final design?
Entrance Muon Counter (EMC)
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Dubna/JINR Status & Plans
SHiP straw tracker prototype tests
SCU Next Phase Meeting July 8, 2014.
Development of Gas Electron Multiplier Detectors for Muon Tomography
MEG DC HV supply preamplifier noise and DRS Input attenuation
m -> eg Drift Chambers
Status report MEG DC 20/6/06 Test in COBRA Hajime,Matthias,Johny Peter : beam, Wataru : COBRA Necessary Modifications in DC.
Gain measurements of Chromium GEM foils
Presentation transcript:

7/5/05,MEG DC,je MEG DC 1.Foils 2.Wires 3.Frames + tools 4.Preamplifier 5.Gas pressure control 6.final

7/5/05,MEG DC,je 1.Foils june

7/5/05,MEG DC,je 2.Wires Anodes Goodfellow, Nickel/Chromium wire (Ni80/Cr20), NI mm, temper hard 50 g (~8 mm) Potentials Leoni Temco, Beryllium Copper wire (Cu98/Be2), BSEN12166x mm, temper hard  110 g (~5.5 mm)  Good to prepare, solder and position

7/5/05,MEG DC,je 3. Frames and tools Iteration: first values for elasticity and behavior  calculate shape  order [done] Delivery of first prototypes : cathode and anodes, hood (in 2-3 weeks) Detail measurements of geometry during construction procedure to go to final values and to check tools   ( foils geometry is good, free frame precision)   frames:behavior with the different forces set during procedure  new values for elasticity and behavior  calculate shape  final order  anode : behavior of wires and with wires, prints and tools  cathode : small corrections to tool  final correction  order  hood : imprecision in tool and weight deformation precise measurement in PSI workshop of the tool  order to workshop to redrill foil reference holes   construction : training of procedure, document final procedure, organize construction route

7/5/05,MEG DC,je Anode. 1 mm Print reference point Wire points (precision) Frame edge points (DC stability) Reproducibility of wire tension

7/5/05,MEG DC,je Cathode frame Vertical displacement Horizontal displacement

7/5/05,MEG DC,je Vertical position of peaks along cathode strips on both sides.1 mm Reference bolts u1 u2 d1 d2

7/5/05,MEG DC,je Profile P1 in vertical position corrected by the profile in horizontal position P2 CF CF Profile P1 in vertical position Line C-F Coordinate system of the central plate Fit of P1-P2 adjusted to line C-F,with foil reference points

7/5/05,MEG DC,je 4. Preamplifier : modify input  survive DC HV breakdown 5V supply : supply 6 V and regulate to 5 V   less sensitive to „noice“ inducing oscillations check of possibility to play with electronic amplification factor   signal to ratio stays constant  domino range, gas amplification, preamp stability

7/5/05,MEG DC,je 50% He + 50% C 2 H 6 He 100 mbar P DC P He 4-5 mbar P He- P DC < 10  bar .2 cc, 14 cc 1400 l 16 x 1l Flush in 3 h ~ 100 cc/min Storm ~ 5 mbar/10 min = 8 cc/min 5. Gas pressure control

7/5/05,MEG DC,je Dr. Arnd Gusovius Bronkhorst (Schweiz) AG Wait until new hood frame and measure new pressure sensitivity of geometry Precision planar drift chambers and cradle for the TWIST muon decay spectrometer R.S. Henderson, Yu.I. Davydov, W. Faszer, D.D. Koetke, L.V. Miasoedovb, R. Openshaw, M.A. Quraan, J. Schaapman, V. Selivanov, G. Sheffer, T.D.S. Stanislaus, V. Torokhov Pressure control A significant challenge for the gas system design was to maintain the external cathode foils as.at as possible and with a positional stability of ±50 µm or less The DC operating total capacity of 16.5 cc/mTorr implies an average foil deflection rate of 11.6 µm/mTorr, which requires a differential pressure stability of ±4.3 mTorr to maintain foil position stability of ±50 µm.

7/5/05,MEG DC,je Robustness of method Timing information practically insensitive to „small“ changes (f.e. Domino calibration) z (  =10 mm, Charge division) and precise z (4 cathodes) Informations contained in ratio of signal integrals parameters mainly sensitive to changes modifiing the signal to noice ratio small for common shift in calibration preamp amplification ( measured for factor 2)

7/5/05,MEG DC,je gas pressure control with C-hood complete resolution test (64 channels) (Al-prototype if necessary) 300 Watt test, Al- or C-full-prototype, with beam (and magnetic field,511 KeV)

7/5/05,MEG DC,je Test Milestone AssemblyDesignManufacturing Drift Chamber Full Prototype Charge division & Cosmics Medium Prototype Full Detector (18 DC) outside inside COBRA Inside COBRA Full Size Prototype Full Prototype Charge division & Cosmics Medium Prototype Full Detector (18 DC) outside inside Inside COBRA Full Size Prototype

7/5/05,MEG DC,je anode cathode right left up + up - down + down - 16 ch. Cable To sampling Or from left OR Large R OR small R DC electronic system Preamplifier 16 x (2 x 9) x 6 = 1728 channels inverting Non inverting At interface He bag – outside Cobra

7/5/05,MEG DC,je