Spectra Energy Partners Texas Eastern Transmission, LP Ohio Pipeline Energy Network Project (OPEN) Clean Water Act Section 401 Water Quality Certification.

Slides:



Advertisements
Similar presentations
U.S. Army Corps of Engineers Regulatory Program Regulatory Program.
Advertisements

US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Coal Mining Activities Mark A. Taylor Huntington District Corps of Engineers.
401 Water Quality Certification South Carolina Department of Health and Environmental Control.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
BUILDING STRONG ® Mitigation in a Modern World or 33 CFR 332 and You Presented by Jayson M Hudson To the Texas Association of Environmental Professionals.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
Modified Charleston Method (MCM)
Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.
Deborah M. Smith United States Magistrate Judge District of Alaska LAWS AND LAW ENFORCEMENT RELATED TO FRESHWATER ECOSYSTEMS Second Asian Judges Symposium.
US Army Corps of Engineers One Corps Serving The Army and the Nation U.S. Army Corps of Engineers Regulatory Program.
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
A Public Hearing Clean Water Act Section 401 Water Quality Certification Regarding Windsor Point Part II March 9, 2010.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
1 Massachusetts Wetlands Regulations and the MCP Rachel Freed Mass. Department of Environmental Protection Wetlands and Waterways Program Northeast Regional.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
2006 Report to: Environmental Review Commission Ecosystem Enhancement Program U.S. Army Corps of Engineers Wilmington District.
US Army Corps of Engineers BUILDING STRONG ® Coordinating U.S. Army Corps of Engineers Regulatory Permits with Species Conservation Plans November 16,
US Army Corps of Engineers BUILDING STRONG ® Lee Anne Devine Chief, South Section Regulatory Branch Louisville District Coal Mining Activities and Section.
US Army Corps of Engineers BUILDING STRONG ® Regulatory Program Glen Justis Chief, Policy & Administration Regulatory Division Alaska District 2010 Building.
Wetlands Mitigation Policy Sudbury Wetlands Administration Bylaw April 27, 2015.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Lake Columbia Water Supply Reservoir Project TWCA March 4, 2010.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Staying on Top of Permits & Public Comments Public Comments Policy Track: Sunday, February 28, :30 pm.
Future Transportation Projects within the Loxahatchee River Basin Florida Department of Transportation District IV 3400 W. Commercial Blvd W. Commercial.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
Office of Coastal Management Coastal Use Permitting.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Clean Water Act Section 404 How it affects your airport during project implementation.
CORPS OF ENGINEERS SECTION 404 INDIVIDUAL PERMIT EVALUATION PROCESS July 22, 2005.
ENVIRONMENTAL OPPORTUNITIES AND CONSTRAINTS ARCHAEOLOGICAL - HISTORICAL INVESTIGATIONS PERMITTING FOR UNAVOIDABLE ENVIRONMENTAL IMPACT AREA ENDANGERED.
Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
The Clean Water Act © Dr. B. C. Paul (Jan. 2000).
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Ohio Wetland Real Estate Issues. Definition Definition Federal Regulations Federal Regulations Permits Permits Solutions Solutions Legal Statues Legal.
Natural Gas Pipeline Permitting in Pennsylvania Mr. Andrew Paterson VP of Technical and Regulatory, Marcellus Shale Coalition August 1, | MARCELLUS.
Interpretive Rule (IR) and Applicability of the Clean Water Act, Section 404(f)(1)(A) Don Baloun Minnesota State Conservationist Natural Resources Conservation.
CORPS OF ENGINEERS REGULATORY PROGRAM PUBLIC INTEREST REVIEW (33 CFR Part 320) August 12, 2005.
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
FERC Office of Energy Projects 1 Richard Hoffmann, Director Division of Gas – Environment & Engineering Office of Energy Projects Policies Affecting.
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Department of Army Permitting Process: Dredging
Delaware County Cooperative Extension May 17, 2012 Constitution Pipeline Project C onstitution Pipeline Company, LLC.
Federal Consistency Certification Sorrento To Miramar Double Track - Phase 1.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
AGENCY ROLES Level 1B: Advanced Fundamentals July 2016 LOCAL, STATE, FEDERAL 1.
Alternative Alignments Public Meeting
Coal Mining Activities
THE CORPS REGULATORY AUTHORITY
Coal Mining Activities
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Michigan Dept. of Environmental Quality Water Resources Division
SEQRA as a Tool to Review Energy Projects
Environmental Assessment PUC Application Process
Regulation Amendment AM April 3, 2018.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Level 1B: Advanced Fundamentals Effective August 2018
Belpre Construction / Post Construction
Presentation transcript:

Spectra Energy Partners Texas Eastern Transmission, LP Ohio Pipeline Energy Network Project (OPEN) Clean Water Act Section 401 Water Quality Certification Public Hearing Nov. 18, 2014

Why Hold a Public Hearing? To gather public comment relative to the proposed impacts on water quality.

Why Seek a 401 Water Quality Certification? Anyone wishing to discharge dredged or fill material into waters of the U.S. and state, must obtain a Section 404 permit from the U.S. Army Corps of Engineers (U.S. ACE) and a Section 401 Water Quality Certification from Ohio EPA.

General Project Information Applicant: Texas Eastern Transmission, LP Location: Columbiana, Carroll, Jefferson, Belmont and Monroe Counties Purpose: To construct a new 75.8-mile, 30”diameter, underground natural gas pipeline to provide transportation capacity in these counties.

Project Location

Factors Ohio EPA Considers Existing stream and wetland quality Nature and extent of the proposed impacts Indirect impacts Attempts to avoid and/or minimize impacts Justification for proposed impacts Proposed mitigation for any unavoidable impacts

Factors Ohio EPA Doesn’t Consider Local zoning Noise Traffic Popularity of the project Labor issues Private property/property value issues Materials to be transported in the pipeline

Project Alternatives Ohio EPA’s review process requires the applicant to submit three project alternatives: Preferred Alternative – impacts that occur in the right-of-way Minimal Degradation Alternative – less impact than preferred alternative Non-Degradation Alternative – no impact

Preferred Alternative 217 stream crossings (1,930 linear feet [LF] of impacts) 279 wetland crossings (18.4 acres of impacts)  Most impacts occur in temporary construction rights-of-way

Minimal Degradation Alternative Same alignment 217 stream crossings (1,930 LF of impacts) 279 wetland crossings (10.4 acres of impacts)  Reduced construction right-of-way widths

Non-Degradation Alternative Avoiding all stream and wetland impacts is not technically feasible.

Wetland Mitigation Plan 1:1 wetland restoration on-site Payment into In-lieu Fee Program for remaining mitigation

Stream Mitigation Plan 1:1 stream restoration on-site Payment into In-lieu Fee Program for remaining mitigation

What’s Next ? Written public comments are due by close of business Nov. 25, The Director makes a decision to either issue or deny Water Quality Certification after considering all submitted information. The decision and response to comments are sent to the U.S. ACE and the applicant, and made available to interested parties. The decision is appealable to the Environmental Review Appeals Commission (

Submit Comments to: or Ohio Environmental Protection Agency Division of Surface Water Attn: Permits Processing Unit P.O. Box 1049 Columbus, Ohio Deadline for comment submission is November 25, Be sure to reference Ohio EPA ID #134297

Contacts Technical issues: Todd Surrena – Northeast District Office or (330) Citizens: Kristopher Weiss – Public Interest Center or (614)