Approved Due Diligence Scope Property Survey Topographic Survey Geotechnical Exploration Streams and Wetlands Threatened & Endangered Species Cultural.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
WASTEWATER DISPOSAL WITH SUBSURFACE DRIP IRRIGATION Donald R. McDonald AgTech Pacific.
Land-Applied Wastewater Effluent Impacts on the Edwards Aquifer by: D. Lauren Ross, Ph. D., P. E. Glenrose Engineering, Inc glenrose.com.
A Management Plan for Swendsen Farm, Bethlehem, CT February 2004.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
Prepared by: Earth Data N.E., Inc. August 19, 2008.
Collection Systems for Community Wastewater Systems CAWPCA Spring Meeting April 26, 2013 Dave Prickett, PE.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
1 Math Questions. 2 Length x Width x Water Depth = cubic feet.
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
Smart Growth / Smart Energy Toolkit Wastewater and Higher Densities Achieving Higher Density Development In Areas Without Sewer/Water Service Smart Growth.
Sustainable Water Infrastructure Ivy Anderson Andey Nunes.
Wareham Fire District Water Department Glen Charlie Road Water Storage Tank Special District Meeting June 23, 2009.
CE 515 Railroad Engineering Environmental Regulations and Permitting Source: AREMA Ch. 11 “Transportation exists to conquer space and time -”
Well Systems. Well System Capacity Well system capacity needs to be large enough to supply daily water need in 10 to 12 hours. Some designers assume 5.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
Chris M. Kapheim General Manager May 5, AID Groundwater Map.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
How do Wetlands Factor into New Infiltration Policies?
Open Space Residential Development Bylaw Town of Rehoboth.
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Walk for a Day and the WQPL. Walk for a Day Proposed Regional Trail Hill Country Conservancy Greenways Inc. City of Austin LBJWC.
Session 131 A community profile provides a base for overlay analysis and for discussing a hazard’s impacts on a community.
MWRA Massachusetts Water Resources Authority Water Treatment History.
Flintstone-Oldtown Planning Region Comprehensive Plan Kick-Off Meeting June 23, 2010 Insert pictures.
 Goals & Objectives ◦ Goal is to set a general framework for the project  develop the expected result or outcome of the project  (e.g.) The trail design.
Butterfly Village (PLN080209) Monterey County RMA- Planning Director July 30, 2008.
LCWDBoardMtg_ pptx/1 LCWD Board Meeting January 14, Carneros Avenue, Napa Los Carneros Water District.
Phase I ESA Environmental Site Assessment. Purpose Is to provide a professional opinion on the potential for current presence of RECS at the subject property.
Bowling Green—Potomac Park Planning AreaBowling Green—Potomac Park Planning Area ◘ Comprehensive Plan Update ◘ Prepared by Ms. Tay Harris & Ms. Lynda Eisenberg.
Yakima-Tieton Irrigation District Agency Kickoff Meeting Tieton Canal Replacement Project June 16, 2015.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Module 3.0 Water Treatment & Supply. Who’s Who? n What molecule is considered absolutely essential to life (as we know it) on this planet? n What molecule.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
September 25, Who is Brushy Creek Regional Utility Authority? Local government corporation formed by Cedar Park, Leander and Round Rock to access,
Recreational Trails Program Federal Requirements.
Environmental Toolbox. Technical Module Introduction.
GREEN INFRASTRUCTURE FUNCTIONAL MASTER PLAN Prince George’s County MNCPP-C Draft: December, 2004.
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
Reservoir Development Update Region K Meeting July 11, 2012 Karen Bondy, P.E. Manager of Resource Strategy 1.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
1 CouncilUpdateJan702pet104i ppt ELLIS CREEK WATER RECYCLING FACILITY PETALUMA, CA North Bay Watershed Association Conference April 9, 2010.
Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main Rachel Rausch, EIT.
May 18, 2004 City Bond Election. MAY 2004 BOND ELECTION General Election May 18, 2004 Elections City Mayoral Election City Council Election City Bond.
LPEA BAYFIELD SUBSTATION LA PLATA COUNTY LOCATION & EXTENT REVIEW March 12, 2015.
Community Development Department Neoga Lakes Future Land Use Map (FLUM) Amendment.
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
The Dane County Regional Hydrologic Study. Conceptualized groundwater flow system for Dane County Source: Bradbury and others, 1999.
Town of Harvard Conservation Commission
Policy Principles for the Allocation of Recycled Water
Investigation of District Package Treatment Plants
Environmental Issues Mapping Field Lab
Babcock Ranch Preserve – Natural Resources
Human Activity and Ground Water
Human Activity and Ground Water
Human Activity and Ground Water
County Water Resources Programs in the Santa Margarita Basin
Presentation transcript:

Approved Due Diligence Scope Property Survey Topographic Survey Geotechnical Exploration Streams and Wetlands Threatened & Endangered Species Cultural Resources Phase I Environmental Water and Sewer Services Preliminary Site Development Scenario

Existing Conditions

Property Survey

Topographic Survey

Threatened & Endangered Species Completed by ENV-ECS Mountain Watercress ( Cardamine rotundifolia) observed at one location (Wetland Unit 18)

Threatened & Endangered Species Several birds on the Threatened and Endangered Species list have the possibility of occurrence but none observed Habitat to support Bog Turtle (Glyptemys muhlenbergii) but none observed

Stream & Wetland Map

Stream Length & Wetland Area

Streams and Wetlands 17 Streams – 10,528 feet Wetlands – 31 total of 5.43 acres

Stream & Wetland Map

Cultural Resources (Preliminary) Database search No on-site sampling No National Register of Historic Places Some provisions recorded archaeological sites within 1 mile (Linda Hall, State Archaeologist) Recommend Phase I survey at select locations

Prospective Phase I Cultural Resource Survey Areas

Subsurface Exploration Adequate for building footings 13 borings 30’ plus depth

Soil Borings

Water Supply Considerations Flow Requirements 500-5,000 GPD demand per site Fire Flow (1,250 GPM) Supply Options Connection to Town of Boone On-site groundwater

Water Supply Recommendation 2 ground water supply wells 175,000 gallon water tank (elevated or ground storage tank with fire pump)

Wastewater Treatment Considerations Flow Requirements 500 to 5,000 gpd per site Treatment Options On-site subsurface and/or spray/drip irrigation Connection to Town of Boone On-site package wastewater treatment plant with discharge to Meat Camp Creek

Site Development Guidelines Diversify development approach to maximize use of property Business and commercial / industrial site Agri-business component to utilize some of existing pasture areas Green spaces Passive recreation Trail system Capitalize on steep areas of property with long range vista through the trail system Protect / enhance streams on site Minimize regulatory impacts Cost effective development associated with topography

Conceptual Site Development Plan