Managing Risks in the Project Pipeline Minimizing the Impacts of Highway Funding Uncertainties Larry Redd, P.E. Tim McDowell, WYDOT, P.E. Larry Redd LLC.

Slides:



Advertisements
Similar presentations
00 Project Gates Briefing to the Capital Program Oversight Committee February 2011 Capital Program Management.
Advertisements

Market risk management of public debt First Annual Meeting of Latin American and Caribbean Public Debt Management Specialists Ove Sten Jensen & Morten.
UPDATED FIVE-YEAR FORECAST 1 City Council Meeting -- December 15, 2014 Presented by Brian Cochran, Finance Manager.
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
Presented by: Jerri Bohard, ODOT Transportation Development Division Administrator Paul Mather, ODOT Highway Division Administrator Travis Brouwer, ODOT.
Simplified Risk Management Planning for A Risk Management Process Overview presentation, which should take about.
Concrete Paving: Opportunities for Virginia Robert R. Long, Jr. Executive Director American Concrete Pavement Association Mid-Atlantic Chapter October.
Postsecondary Education Review Commission Impact of Shifting Enrollments on Resources in Louisiana September 29, 2009.
City of Pittsburgh 2015 Budget and Five-Year Plan September 22,
Dividend Policy and Retained Earnings (Chapter 18) Optimal Dividend Policy Conflicting Theories Other Dividend Policy Issues Residual Dividend Theory Stable.
CEVP ® Cost Estimate Validation Process TEA Conference 2004 Jay Drye, P.E. Assistant State Design Engineer Monica Bielenberg, P.E. CREM Program Manager.
Reinsurance Presentation Example 2003 CAS Research Working Party: Executive Level Decision Making using DFA Raju Bohra, FCAS, ARe.
Considering Tax-Supported Debt May 10, 2004 Presentation to City Council Roger Rosychuk Corporate Services Department.
MIT Research: Effects of Inflation and Volatility on Construction Alternatives.
Supply Chain Management Managing the between all of the parties directly and indirectly involved in the procurement of a product or raw material.
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
A Fresh Look at Your Retirement Plan by Your Name, CFP.
© 2005 Prentice Hall14-1 Stumpf and Teague Object-Oriented Systems Analysis and Design with UML.
Maximizing Business Value Through Projects: Doing less and achieving more! Thomas G. Lechler Stevens Institute of Technology Hoboken NJ.
Lecture 5 - Financial Planning and Forecasting
Economic Analysis: Applications to Work Zones March 25, 2004.
The Measurement Fundamentals of Financial Accounting Presentations for Chapter 3 by Glenn Owen.
Jobs agenda to get the economy moving Redesign public services to support the economy Revamp the tax system to incent economic growth How to turn things.
Chapter Seven Event Budgeting
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
The Role of Fiscal Institutions in Managing the Oil Revenue Boom CEPAL XIX Regional Seminar on Fiscal Policy January 2007 Rolando Ossowski Fiscal Affairs.
Budget Recommendations for Denver Public Schools Budget Year 1/29/
吳仲理 Using Lean in Application Development to achieve competitive advantage and customer delight N. Balaji Ganesh, WIPRO Technologies 20/12/2013.
Beyond the Crossroads National Conference on Transportation Infrastructure and Regulatory Policy May 27, Denver, CO Future Infrastructure Needs,
CS-411W VIII – Budgeting, Costing, and Pricing. Definitions Cost - the value of inputs that have been used to produce something. Inputs are typically.
Business Analytics with Nonlinear Programming
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 10 Project Cost Management.
Example 2.5 Decisions Involving the Time Value of Money.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Sponsor: Dr. K.C. Chang Tony Chen Ehsan Esmaeilzadeh Ali Jarvandi Ning Lin Ryan O’Neil Spring 2010.
August 15, 2005 © Campus Strategies 1 A Strategic Approach to Budgeting MSU Planning/Budgeting Retreat August 15, 2005 Larry Goldstein President, Campus.
SDC Migration Project Status Report January 2012.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
Debt Strategy Presentation to City Council May 10, 2004 Click to edit Master title style.
Toll Road Asset Management and the Linkage to Finance Transportation Innovations, Inc. 10/22/
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
CHEVRON PIPE LINE COMPANY Risk Based Prioritization Process.
Response to FFC submission for Division of Revenue 2011/12 Dept of Basic Education presentation to Select Committee on Finance 17 August 2010 Dept. of.
Superior StandardsSuccessful Students Preliminary Budget Adoption Update Thelma Meléndez de Santa Ana, Ph.D., Superintendent Stefanie P. Phillips,
APPLYING RISK MANAGEMENT STRATEGIES PRUDENTLY Paper No 192 Presented At 2011 ICHS Conference September 13, 2001 By Michael Pero, P.E. – Director of Risk.
KRG: ECONOMIC AND SOCIAL IMPACT ASSESSMENT OF THE SYRIAN CONFLICT AND ISIS CRISIS METHODS FOR DATA ANALYSIS: COMPREHENSIVE ASSESSMENT OF IMPACTS WASHINGTON,
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
Project Risk Management. Risk-Defined A situation involving exposure to danger; “The combination of the probability of an event and its consequences”
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
Metropolitan Transportation Authority November Financial Plan 2016 – 2019 Presentation to the Board November 18, 2015.
New Jersey School Boards Association – Serving Local Boards of Education Since 1914 State Budget Overview Presented by: Michael Vrancik NJSBA Director.
Winter Symposium January 20, Why are we here today? To discuss ways that we can take control of our future and make the outcomes we desire more.
Optimizing the utilization of your skilled resources How to balance demand with capacity in volatile multi–project environments Barry Muir Managing Director.
By Larry Redd, P.E. Redd Engineering Report for TCCE Annual Meeting Ken Spear, P.E. WYDOT Contracts & Estimates Engineer.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Technological University wcmasmes.ppt1 Water Conservation & Management in Asian SMEs.
1 Measuring Impact Guide This guide is an introduction to assessing the impact and spending effectiveness of your district’s initiatives and the resources.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
Copyright 2015 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Parts Management Agreements
Measuring Impact Guide
Joshua Basin Water District Revised Rate Recommendations
Copyright © 2005 Prentice Hall, Inc. All rights reserved.
Presentation transcript:

Managing Risks in the Project Pipeline Minimizing the Impacts of Highway Funding Uncertainties Larry Redd, P.E. Tim McDowell, WYDOT, P.E. Larry Redd LLC

Performance-Based Management “Maximizing Value and Cost Savings” Performance Benefits & Savings Asset Management Efforts Program Trade-Offs Project Optimization Programming Program Optimization Recommended assets, treatments, project timing, maintenance operations Best cost and benefit trade-offs between programs -- performance target-setting, optimized budgets Optimized components, scoping, timing, designs, mix, locations, groupings Minimized risks in the Project Pipeline

Uncertainties Can Ruin Your Asset Management Plans Project Programming Project Deliveries STIP— ”Project Pipeline” Best Laid Plans Optimized project selection Intended performance benefits Assumed revenue by year Unplanned Outcomes Actual Revenue? Missed deliveries Holding Costs Obsolete projects “Hurry-up” projects Low performance Pipeline Uncertainties Scope growth and project cost Labor and Materials price volatility Environmental or ROW issues Unplanned political priorities Construction cost inflation Uncertain or variable revenue Larry Redd LLC Larry Redd, P.E

Costs of “Being Too Lean”-- -Loss of Stimulus Funds, Block Grants, Special Legislative Funds -”Hurry-up” design and devel. costs -Non-optimum advanced const. Amount of Projects “On-the-Shelf” Ready to Go Holding Costs – -“PE 10 yr Limit List” $Millions at risk, and $Billions in projects may not get done -Lost permit costs -ROW and EA costs -Development costs -Obsolete projects -Redesign costs Costs “Optimum” Range Non-Optimum Project Pipeline Costs

Objectives Identify cost elements (holding and hurry-up costs) and uncertainty factors to reduce or trade off or mitigate. Identify controllable factors to optimize (examples) – –How to operate the pipeline (loading, project mix, draining, etc.) –Cost factors to reduce (holding, hurry up) –Reduce time delays in getting projects onto the shelf Bottom line – Determine how to deliver intended projects, with expected performance, on time; in the midst of uncertain and/or variable funding Not “Business as usual…” – Instead, using low impact solutions/methods to manage risks and uncertainties

Uncertainty Factors Scope growth Political priorities Material price volatility Labor costs Other construction cost escalation Legal issues Environmental or regulatory issues Right-of-way issues Funding issues

Simulation Cartoon Higher Risk if delayed. Lower Risk if delayed.

Available Funding – WYDOT Scenario

Sensitivity of Losses to Key Parameters ParameterInitial ValueSensitivity ValueReduction in Losses Design Time for 3R4Rs 5 yrs3 yrsUp to 22% or more Pipeline (Shelf) Draining Logic Proportional based on intended Mix “Keep the Critical Projects Moving” Up to 16 % or more Holding Cost factor (per year) 5% for 3R4Rs and 2% for 1R2Rs 2.5% for 3R4Rs and 1% for 1R2Rs 20 to 30% Hurry Up Inefficiency 40% inefficiency20% inefficiency25% or more Use of Projected Revenue No Projections used Projected two years out Up to 30 % or much more “Smoothness” of Funding “Bumpy” or “Blocky” funding Smoothed or flattened funding Ideally this would eliminate losses

Observations and Conclusions Latest results verify that total Project Pipeline losses can be about 3% per year or more (off-nominal cost assumptions). – A 3 percent savings is representative based on the findings of the analysis. This would amount to a total savings of $90 million,for example, for a budget of 3 billion dollars over a 10-year period. Multiple methods have been shown to be effective in cutting these losses: –Using (accurate) forward projections of available revenue, or reducing design times in the pipeline (especially for 3R4R projects) –Reducing the values of the factors of Hurry Up and Holding Costs –The “Critical Project Method” of stabilizing the flow of major projects has proven effective. Don’t delay the largest and more complex projects.

Questions?????

Larry Redd, P.E.,

Research on how highway projects are loaded into the “project pipeline” and delivered has shown that mismatches between available funding and the number of projects that are “ready to go” can result in significant financial costs to a Department Of Transportation. These costs have been defined as “Holding Costs” if there are too many projects on hand and “Hurry-Up Costs” if there are too few projects ready to go. The goal of the research was to identify significant process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles paved and minimizing financial risks to the organization. Overall, a balance between Holding Costs and Hurry-Up Costs or inefficiencies must be maintained in order to deliver the maximum amount of projects over time. In order to explore the various aspects of this problem, a simulation tool was developed to perform scenario analyses to help balance the project pipeline. Significant savings in delivering highway projects can be possible by implementing the recommendations from this research. A 3 percent savings is representative based on the findings of the analysis. This would amount to a total savings of $90 million, for example, for a budget of 3 billion dollars over a 10-year period. By minimizing the amount of projects held “on the shelf” and employing practices that minimize the risks of incurring Holding Costs due to revenue shortfalls, these savings can be maximized. Furthermore, using the Critical Project Method shifts the impact of revenue uncertainties from major rehabilitation projects to minor rehabilitation projects and provides a sound, core strategy for managing the risks in the project pipeline. After considering both the recommended Core Strategies and the System and Organizational Improvement Strategies, management can decide what processes they want to change or improve. Then, the Model, Measure, Manage approach can be used to guide the organizational change process and help the organization move towards a state of continuous improvement. Finally, plans can be outlined for additional research, which may be needed to support the new strategies and process improvements.