94 th EN BN CONUS Construction Riverbend, Phase IIIA Laredo, TX 24 January 2010 – 10 March 2010.

Slides:



Advertisements
Similar presentations
Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March 30, 2011 Managing PCB Contaminated.
Advertisements

Car Wash Friday, 8 April 2009 Location: Auto Zone and McDonalds in JC (Washington St. and 6th St) Come support the company by getting your vehicle washed!!
Who to Protect our Borders Henri Boshoff 1. Scope Border Control a reality check. What happened in the past Changing the Guard Changing the Guard again.
Company Level Evacuation and Recovery Team (CLEAR)
Implementing Contractor Assurance System (CAS) for Property Management—A Cultural Change Colleen Griffith-Regal Lead Property Policy Analyst National Nuclear.
WELCOME TO INNG EMERGENCY OPERATIONS LIAISON OFFICER OVERVIEW
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Training Briefing Slide Format
Civilians on the Battlefield (COBs) CPT (P) Woodruff 2 Mar 06.
Contractor Safety Management
FRG: Deployment Tasks| 1 FRG’s Tasks in the Deployment Cycle Third Edition, 2006.
DEVELOP A COHESIVE SIZE ORGANIZATION. PURPOSE To provide information on how to develop a platoon-size organazation by establishing and executing a plan.
STRONG SOLDIERS, STRONG TEAMS! UNCLASSIFIED As of 15 SEP 11SbS 12 IPC Out Brief UNCLASSIFIED 1 Syndicate leaders – Mr. Close / 1LT Brale (Latvia) / LT.
Unit Training Briefing (Template)
Training Management Directorate (TMD)
Doctrine 2015 Information Briefing
Selecting and fighting
BUILD WITH US. ™ Contractors
ODOT Rail Division 1.Regulate all Highway/Railroad Crossings 2.What is a “Crossing Order”? 3.When is an Order required?
LAB 11 Attack OIC: C/CPT Spier AOIC: C/CPT Jackson.
1 st Battalion, 3 rd Air Defense Artillery Operation Iraqi Freedom Lessons Learned Air and Missile Defense Commander’s Conference United States Air Defense.
Kansas City District June 2009 Military Construction Briefing and Site Tour CPT Jeff Shultz Fort Leonard Wood Resident Office, Kansas City District, USACE.
Vgt1 DUTY A DUTY IS THE LEGAL OR MORAL OBLIGATION TO PERFORM A REQUIREMENT ARISING FROM THE POSITION AN INDIVIDUAL HOLDS.
United States Coast Guard Port Security Assessment Program Evaluability Assessment LaKeshia Allen Alexandra Sommers May 2, 2005.
Marine Air Ground Task Force Training Command Marine Corps Air Ground Combat Center 1 MCAGCC Future Plans and Development.
Using Public Health Missions to Prepare for Disaster Response Texas State Guard – Medical Reserve Corps LTC Frank Stead.
Software Engineering Project Assignment 7 Group 3 IT-201.
Juan Salgado Professor, Legal Studies Dept. CIDE, Mexico City September, 2009 Needs assessment for bottom- up police reform in Mexico.
Immigration : US and Mexico. US / Mexican Border Border stretches from San Diego, CA/Tijuana, MX to Brownsville, TX. The border is 1,969 miles long.
TRAINING.
Customs and Border Protection (CBP) Uses of Criminal History Valerie Isbell Executive Director Passenger Systems Program Office Office of Information.
Commanding the Confined Space Rescue. ICS Incident Priorities Life safety Responder safety is number one priority General public Be part of the solution,
LULA GREEN ROAD UNION, SOUTH CAROLINA Jerry A. Brannon, Sr.,PE Union County Engineer.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force UNCLASSIFIED 1 Air Force Total Force: Regular, Guard, Reserve, Auxiliary.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
UNCLASSIFIED 1 AS OF: 7 June 2012 UNCLASSIFIED “Strength Through Partnership” MG Piggee COL Sirel UNCLASSIFIED US National.
1 NOAA Center for Weather and Climate Prediction (NCWCP) June 17, 2005 Briefing for Dr. David A. Sampson Deputy Secretary of Commerce.
California Integrated Waste Management Board Tire Flow Study Along the California-Mexico Border Region Special Waste Committee Meeting California Integrated.
Federal Acquisition Service U.S. General Services Administration GSA Assisted Acquisition Services Peter Han General Services Administration March 16,
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Reconnaissance and Surveillance Leader Course STABILITY AND SUPPORT OPERATIONS (SASO)
Professional Development G-7 Enlisted Training
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
Plan Unit Defense SFC Rosario REFERENCES FM 3-4 FM 7-10 ARTEP MTP
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
US Politics The Presidency. Overview Qualifications Functions of the President Organization of the Presidency.
UNCLASSIFIED Liberty Brigade Civil Information Management Status Update 1.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
APFT OIC- C/CAPTAIN MESSER. Situation: Enemy: None Friendly: Ute Warrior Battalion Conduct APFT Terrain: Liberty Park OIC: C/Captain Messer APFT Command.
Department of Preventive Health Services Department of Preventive Health Services Medical Zoology Branch.
2011 Senior Leaders Seminar CARAT Cooperation Afloat Readiness and Training 30 March 2011 Bangkok, Thailand CDR Troy Amundson COMLOG WESTPAC CTF 73 CARAT.
U.S. ARMY ENGINEERS Achieving A Vision A Profession in Military Engineering in the Corps of Engineers U.S. ARMY ENGINEERS Achieving A Vision A Profession.
Ad Hoc Fort Ward Management Plan Implementation Monitoring Group Meeting January 21, 2016.
Houston Area: Baltimore (81) Baltimore (81) Boston (48) Boston (48) Pittsburgh (56) Pittsburgh (56) San Francisco (47) San Francisco (47) Denver (153)
ODOT Railroad Access & Safety
Architecture, Interior and Project management consultant
Michigan National Guard CBRN Response Exercise NORTHERN EXPOSURE 17 Overview June 2017.
SQUAD REACT TO CONTACT OIC- C/CAPTAIN MESSER.
Two way tables CoachRailCarAirTotals Jan Feb Mar Total
MAIN 220 Equipment Installation
Alternate Scenario 5 Armored Brigade Combat Team (ABCT) (Kuba River Defense; O/O Attack to PL Chicago) Each unit brings a specific capability to the overall.
Brigade S-1 Operations Course Personnel Readiness Management (PRM)
Fred Carlton Field Turf Renovation
DOT Panel Discussion Quality Acceptance Programs & Inspection Guidelines
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Far Experimental Hall Hutches Civil Construction
Al Buxton– Department of Ohio National Security Chair
National Training Center
Executive Project Kickoff
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

94 th EN BN CONUS Construction Riverbend, Phase IIIA Laredo, TX 24 January 2010 – 10 March 2010

Overview Mission: 94 th EN BN deploys a horizontal construction platoon (+) to Laredo, TX O/A 29JAN10 IOT improve a 0.88 mile length of road with cut/fill operations, caliche, and proper drainage; and redeploys to Fort Leonard Wood, MO O/A 07MAR10 IOT support the Department of Homeland Security’s mission on the US-Mexico Border. Scope of Work: 0.88 mile of 24’ wide, all-weather patrol road 3 concrete low-water crossings 250 feet of guard rail, 19 road signs, 40 linear feet of pipe gate, post and cable barricades Over 1000 linear feet of drainage ditches METL trained: 1.Deploy personnel by air, quartering party operations. 2.Road construction: Clearing, grubbing, cut/fill, spreading material, shaping material, compaction. 3.Reporting procedures, construction progress tracking.

AO Orientation

Concept of the Operation Phase I - Planning JTF-N Contacted 94 th EN BN, with proposed construction project BDE Approval S3 & S4 Site Recon Unit accepts mission Plans & SOW complete, Company tasked Platoon begins planning Platoon OIC & NCOIC Recon Platoon conducts PRECON Unit briefs plan to JTF-N

Concept of the Operation Phase II - Execution Clearing & grubbingCutting, filling & shaping sub-baseSub-base compactionDrainage ditch filter fabric & rip-rap

Concept of the Operation Phase II - Execution Spreading & shaping of baseConcrete low water crossing installation Final walkthrough & customer acceptance AAR & media coverage

Progress Tracking

BEFORE (29 JAN 10) AFTER (07 MAR 10)

Counterinsurgency Training Key Leader Engagement/Negotiation –USBP, USACE, LCC, Civilian Engineers, Concerned citizens (environmentalists), Contractors, media –Battle Space Owners, Civilian Construction companies, HN Military Engineers, HN Government, Contractors, USACE Cultural Understanding –USBP-LS/LCC relationship, Drug Cartel in Mexico, Drug/Human trafficking – HN Military/Civilian relationships, Insurgent groups, International terrorism EOF/ROE –SRUF – Posse Comitatus –ROE – HN Laws Every Soldier a Sensor and Ambassador

Questions?