Doc.: IEEE 802.11-05/937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 1 Sept 2005 Garden Grove Meeting Slides Notice: This.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0063r1 Submission January 2007 C. Wright, Azimuth Systems, Inc.Slide 1 TGT January 2007 London Meeting Slides Date: Authors:
Advertisements

Doc.: IEEE /0321r0 Submission March 2007 C. Wright, Azimuth Systems, Inc.Slide 1 TGT March 2007 Orlando Meeting Slides Date: Authors:
Doc.: IEEE /1702r0 Meeting Report September 2006 Pat R. Calhoun, CiscoSlide 1 Report of TGv – November 2006 DATE: November 2006 Author(s) NameCompanyAddressPhone .
Doc.: IEEE /1389r0 Submission Nov 2004 C. Wright, Azimuth Systems Task Group T Wireless Performance Meeting Slides Charles R. Wright
Doc.: IEEE /1025r0 Submission Sept 2004 C. Wright, Azimuth Systems Task Group T Wireless Performance Meeting Slides Charles R. Wright
Doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Francisco, California, July 18.
Doc.: IEEE /0747r0 Submission May 2006 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 TGp May Opening Presentation Notice: This document has.
Doc.: IEEE /0913r1 Submission Sep 19-23, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Orange County, California, September.
Doc.: IEEE /0054r0 Submission January 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc Agenda Notice: This document has been prepared to.
February 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0258r0 Submission 11k Brisbane 2 Agendas Notice: This document has been prepared to assist.
Doc.: IEEE /0646r0 Submission July 2005 Richard Paine, BoeingSlide 1 11k Cairns Agendas Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /1528r0 Submission 22 September 2006 Naveen Kakani, Nokia, IncSlide 1 TGn PSMP adhoc Group September Closing Report Notice: This document.
Doc.: IEEE /669r2 Submission July 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 1 San Francisco Meeting Slides Notice: This document has.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
Doc.: IEEE /0049r0 Submission January 2006 Charles R. Wright, Azimuth Systems, Inc.Slide 1 January 2006 Waikoloa Meeting Slides Notice: This document.
Siemens, Roke Manor (Recording Secretary )
Siemens, Roke Manor (Recording Secretary )
TGp Opening Date: Authors: January 2007 Month Year
11k Seattle 3 Agendas Date: Authors: September 2005
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
[ Interim Meetings 2006] Date: Authors: July 2005
11k Vancouver Ad Hoc Agenda
TGp September Opening Presentation
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
TGT January 2007 London Meeting Slides
TGT November 2005 Closing Report
ADS Study Group Agenda Date: Authors: January 2005
November 2005 Vancouver Meeting Slides
TGu Agenda Date: Authors: January 2007 January 2007
TGu Ad Hoc Agenda Date: Authors: February 2007
Reflector Tutorial Date: Authors: July 2006 Month Year
Siemens, Roke Manor (Recording Secretary )
TGs San Diego Closing Report
Wireless Next Generation (WNG) Agenda
TGn Closing Report – November 05
Procedures for TG Internal Review
March 2005 Opening Report Date: Authors: March 2005
November 2005 Vancouver Meeting Slides
TGu Ad Hoc Agenda Date: Authors: February 2007
IEEE r: Fast BSS Transition TG Agenda
November 2005 Vancouver Meeting Slides
TGT May 2006 Closing Report Date: Authors: May 2006
TGT September 2005 Closing Report
Siemens, Roke Manor (Recording Secretary )
July 2005 Opening Report Date: Authors: July 2005 July 2005
TGT January 2007 Closing Report
[place presentation subject title text here]
[ Policies and Procedure Summary]
May 2005 Opening Report Date: Authors: May 2005 May 2005
Cairns Meeting Slides and Closing Report
Report of TGv – September 2006
Siemens, Roke Manor (Recording Secretary )
TGT January 2006 Closing Report
IEEE r: Fast BSS Transition TG Agenda
IEEE r: Fast BSS Transition TG Agenda
TGu Agenda Date: Authors: March 2006 March 2006
IEEE IPR Policy Date: Authors: March 2006 March 2006
TGT November 2005 Closing Report
TGu Agenda Date: Authors: May 2006 May 2006
Stephen McCann (Chair)
TGT July 2005 Closing Report
IEEE r: Fast BSS Transition TG Agenda
WNG SC Opening Report Date: Authors: Name Company Address
Monterey Meeting Slides and Closing Report
March 2005 Mesh Agenda Authors: February 2005 Date:
TGT March 2006 Closing Report
TGT May 2006 Closing Report Date: Authors: May 2006
Monterey Meeting Slides and Closing Report
Presentation transcript:

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 1 Sept 2005 Garden Grove Meeting Slides Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 2 Charles R. Wright Welcome to TGT Evaluation of Wireless Performance

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 3 6. Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. IEEE-SA Standards Board Bylaws on Patents in Standards Approved by IEEE-SA Standards Board – December 2002, Reaffirmed May 2005

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 4 Approved by IEEE-SA Standards Board – December 2002 Inappropriate Topics for IEEE WG/TG/SG Meetings Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 5 A Friendly Reminder… The attendance server on 802wirelessworld will not be in operation this week Attendance will be recorded on a sign-in sheet Between 8 AM and 5 PM, go to the registration desk and sign the sheet and indicate how many of the meetings that day you did or will attend Do this once a day

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 6 One Other Item – Document Server There’s a local server that mirrors the documents on that’s updated every 15 minutes –ftp:// ftp:// Please use this server for downloads to conserve bandwidth on our link to the outside world For document submissions, use the web interface on as per usual

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 7 Meeting Objectives Elect a permanent secretary. Must be a voting member of Technical presentations and proposals. Suggested subjects: –Metrics and methodologies –RF testing environments –Device operating environments –Device configuration –Application performance –Definitions Review of Draft 0.3; approval of any changes

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 8 Progress Since San Francisco Editor incorporated approved proposals into the draft to create D0.3 Three of four scheduled telecons held –Update for those who were not in San Francisco –Discussion of comments to D0.3 –Discussion of how to go forward with draft, comments, additional proposals Chair was AI’d to create a “TGT Process” document for review by the group

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 9 Proposed Agenda for Garden Grove Meetings 1.Chair comments 2.Appoint secretary 3.Approval of agenda 4.Approve minutes /0736r0 – San Francisco /911r0 – 8 Sep 05 Telecon 5.Call for presentations /943r0, “Conducted power and sensitivity measurements”, Michael Foegelle, 45 min /874r0, “Methodology metrics and test cases measuring FBT performance”, Sangeetha B. 45 min /950r0, “Methodology metrics and test cases measuring BSS Transitions performance”, Chris Trecker, 30 min /944r0, “OTA TRP and TIS testing”, Michael Foegelle, 45 min /887r0, “Video Testing Strategy”, Philip Corriveau, 60 min /758r1, “ACI Test Methodology”, Dalton Victor, 45 min /951r0, “Streaming Media Performance”, Fahd Pirzada, 45 min /949r0, “Latency Sensitive Application Metrics”, Sangeetha B., 30 min 6.Process discussions 1.Discussion of TGT process document (11-05/912r0) 2.Review of published T timeline (see 7.Presentations in Item 5 as they are ready 8.Old Business 1.Review of the draft / issues list 9.New business 1.Topics arising from previous meetings 2.Future telecons

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 10 TGT Meeting Schedule for week Opening, confirm secretary, call for presentations, start presentations TGT Closing business MondayTuesdayWednesdayThursday Lunch Dinner 8:00 10:00 10:30 12:30 1:30 3:30 4:00 6:00 7:30 9:30

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 11 TGT Plan Of Record Used as input to the TG milestones table Step 1 complete after March meeting –All important pieces in place at this time TG internal review to start after March meeting –Comments resolved in May meeting –New draft created and circulated before July meeting –Additional comment resolution during July –Plan to vote on going to LB at July meeting Update the timeline for LB in July 2006 All other dates in milestones table will be updated accordingly As discussed in Monday morning meeting…

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 12 New Business Discussion of work to be done on teleconferences

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 13 Telecons between September and November meetings Motion to empower TGT to hold telecons –Time: 12 noon Eastern (US) time –Duration: 1 hour –Dates: Moved/second: Yes: No: Abstain:

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 14 Backup Information

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 15 TGT Approved Document List 11-04/1553r2, “Guidelines for TGT Formal Metric and Methodology Proposals” 11-05/912r1, “TGT Process Document”

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 16 Teleconference Info Date: Thursdays Time: 12 AM Eastern time (1600 UT) Duration: 1 hour Phone # International: Passcode: Next: TBD

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 17 Reflector reflectors: stds –Requires membership to send to it Getting on the reflectors –Send an to Harry Worstel with a cc to Al Petrick and Stuart Kerry requesting to be put on the Instructions are contained in every reflector posting for customizing your reflector experience (including unsubscribing) rules require all TG communication to be through reflector

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 18 References for Newcomers (1 of 2) Web site: – Document server: – –Sign up for an account –No need to be an member to get an account –Once logged in, “join” : Click on “ WLAN WG” on left In center window, choose to become a new member –Click again on “ WLAN WG” An additional subitem called “Documents” will be revealed – click on it –You’ve reached the document server!

Doc.: IEEE /937r0 Submission September 2005 Charles R. Wright, Azimuth Systems, Inc.Slide 19 References for Newcomers (2 of 2) Document numbering scheme –WG-YY-NNNN-RR-gggg-English-document-title.ext WG = 802 working group number, e.g. “11” as in YY = two digits of year NNNN = document number RR = document revision number gggg = group to which the document pertains –Example: wpp-telecon-agenda-19-feb-04.ppt