Trash Capture Device Installations

Slides:



Advertisements
Similar presentations
Hydrology Rainfall - Runoff Modeling (II) Synthetic unit hydrographs
Advertisements

Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
1 Urban Drainage System Analysis & Design CEVE 512 Hydrologic Design Lab Spring 2011.
1 CTC 261 Hydraulics Storm Drainage Systems. 2 Objectives Know the factors associated with storm drainage systems.
CE 3372 Storm Sewer Conduit, Junctions, Inlets. Storm Sewers 0 Inlets capture stormwater 0 Junctions connect laterals to trunk lines. 0 Conduits (pipes)
Preliminary Design of Galvez Estates Subdivision.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Detention / Infiltration Structure. Figure 21–1 Point Discharge and Downstream Stability Analysis Procedure.
Stormwater Systems ARCH-433. Attendance This water closet, installed in Pullman, Washington, flushes in a counterclockwise rotation. In what direction.
Rainfall-Runoff Modeling
Problem 1- Tabulated below are total rainfall intensities during each hour of a frontal storm over a drainage basin.
Drainage System Design and Layout. Design Process Flowchart Background Information (Soils, Topo, Crops) Confirm Outlet Drainage Needed Select DC, Spacing.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
1 Time of Concentration. 2 Objectives Know how to calculate time of concentration Know how to calculate time of concentration Know why it’s important.
CE 3372 Water Systems Design
Storm Drainage Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman 2bcWaste Water Disposal and Storm Drainage Chapter 4, 7; Appendix A (Wentz)
 An adequate drainage system for the removal of surface and subsurface water is vital for the safety of aircraft and for the long service life of the.
Reading: Applied Hydrology Sections 8.1, 8.2, 8.4
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.
UNL Environmental Engineering Lesson July 2007 Marie Nielsen
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
RAIN GARDEN DESIGN CONTEST 2013 MARCH 11 TH – 27 TH.
B.S. Engineering Science, Humboldt State University, Arcata, CA MSCE, San Jose State University, San Jose, CA Ph.D., Environmental Engineering,
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Discussion of Proposed MS4 Permit Design Standards Language.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Potomac Watershed Trash Summit March 16, 2006 Washington D.C. Scott Lines City of Long Beach
Reducing Trash in Stormwater
Prepared by Musab O. JayyousiOsama H. Shaheen Dr. Mohammad N. Almasri Modeling and Management of the Stormwater of the Old City of Nablus Nablus – Palestine.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye.
STORMWATER MANAGEMENT
Curb and Gutter Under Construction Completed Gutter Curb.
Curb and Gutter Under Construction Completed
An-Najah National University Engineering College Civil Engineering Department Project title : Management of stormwater for a portion of Faisal street “Nablus”
Operation & Maintenance of Permanent Stormwater Controls Overview of Inspection Requirements Laura Prickett, AICP, CPESC EOA, Inc. Construction Inspection.
STORM WATER STORAGE AND TREATMENT
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
CE 3372 Water Systems Design Lecture 17: Storm sewers, inlets, conduits and related hydrology and hydraulics.
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
Caltrans Trash Reduction Workplan. SF Bay Trash Control Requirements Permit Driver  CT Permit Attachment V – SF Bay Region-Specific Requirements Requirements.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
HYDROGRAPH is a graph showing the rate of flow (discharge) versus time past a specific point in a river, or other channel or conduit carrying flow. It.
Modeling an Urban Development with MIKE-SWMM Presented by: Melissa Figurski.
Bob Edwards Oregon Dept. of Fish and Wildlife.  Is there an existing structure?  What is the integrity of the structure?  Is the location of the structure.
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Queenston Manor Apartments -
Sandra Blick / Meeta Trivedi Hydrology & Hydraulic Unit – NJDOT BLAES
Hydrologic Analysis (Bedient chapter 2)
SPU Modeling & Monitoring
Cristina Nelson, Term Project, CEE 6440, Fall 2007
CE 3372 Water Systems Design
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
Storm Water Storage and Treatment
Municipal Utilities Department June 24, 2008 Agenda Item 9.02
Time of Concentration.
Northern California LID Hydrology and Hydraulics
[OUR CITY NAME]’S OLD SEWERS
Love Field Modernization Program
Fixing Our City’s Old Sewers
بسم الله الرحمن الرحيم (وقل ربي زدني علما)
Presentation transcript:

Trash Capture Device Installations Municipal Maintenance Stormwater Workshop Kevin McGillicuddy, P.G. Roscoe Moss Company

Topics Large scale screen device design criteria Installation Examples Maintenance Practices

Screen Design Criteria Site Selection Provide adequate access for installation and future maintenance events

Screen Design Criteria Target Flow Calculator Peak flow (Q) determined using formula Q = C * I * A C = runoff coefficient : 0.8 I = 1 yr-1 hr rainfall intensity : 0.5 in/hr A = tributary drainage area : 150 acres Q = Target Flow = : 60.1 cu.ft/sec Bypass System Must be Designed to Transfer Flows Above Target Flow Rate

Overflow Bypass Sections

Screen Design Criteria Device Size Requires determination of diameter and length Diameter: - match outfall dimensions - flow line of treated storm event Length: - as required to treat target flow with debris in place - capacity to hold captured debris between cleaning events

Screen Configuration Options Single linear configuration Parallel multi-screen configuration

Screen Configuration Options Single linear configuration Parallel multi-screen configuration

City of Antioch Detention basin area – 6 acres Drainage area: 200 acres Target flow: 60 cfs

Treatment capacity 60 cfs up when ¼ full 30 ft – 42 in dia screen Treatment capacity 60 cfs up when ¼ full

Brentwood, CA 15 ft – 48 in screen, treatment capacity 23 Brentwood, CA 15 ft – 48 in screen, treatment capacity 23.4 cfs when ½ full

Pittsburg, CA 50 ft - 36in screen, treatment capacity 55 cfs when 1/2full

Milpitas, CA combination radial , semi-circular, and flat panels 30 ft – 42 in screen Treatment capacity 60 cfs when ½ full

Maintenance Procedures

Video

Questions ? Please Contact : Kevin McGillicuddy Roscoe Moss Company 4360 Worth Street Los Angeles, CA 90063 Tel: (323) 263-4111 www.roscoemoss.com Email:kmc@roscoemoss.com