Performance Based Logistics: Transformation Through Partnership.

Slides:



Advertisements
Similar presentations
COMPANY ACTIVITY QUALITY ASSURANCE ENVIRONMENTAL ORGANISATION COMPANY HISTORY OUR MISSION Serving You Around the World, Around the Clock.
Advertisements

1 Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force OC-ALC/MAN.
Merit Consulting Terje Myrseth MUA – October 2008.
Bringing the Voice of the Consumer Into Your Supply Chain Jake Barr Director, Consumer Driven Supply Network Global Mfg, Planning & Logistics The Procter.
PMP LOGISTICS PVT LTD Serving You Around the World, Around the Clock.
ARINC Overview Alliance Baltimore November 16, 2007.
Overseas Private Investment Corporation: The U.S. Government’s Development Finance Institution Renewable Energy and Energy Efficiency Izmir, Istanbul,
Depot Maintenance Partnering for PBL Managers Hollis Hunter OSD Maintenance Policy (DSN 225-)
Parts Standardization and Management Committee (PSMC)
21 ST CENTURY NAVAL AVIATION LOGISTICS PRESENTATION TO: NDIA LOGISTICS CONFERENCE RADM BERT JOHNSTON VICE COMMANDER, NAVAL AIR SYSTEMS COMMAND 2 MARCH.
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
Air Force Partnering with Industry May 2004 Developing, Fielding, and Sustaining America’s Aerospace Force Air Force Materiel Command.
Birthplace, Home & Future of Aerospace 2014 SECDEF Subsystem PBL of the Year – Sniper Precision Attack Pod 1 DISTRIBUTION STATEMENT A. Approved for public.
Office of the Assistant Deputy Under Secretary of Defense
Navy Working Capital Fund and PBL Director, Supply Chain Solutions Division Presented at: PSM Workshop Ft. Belvoir 14 January 2015.
Silver Wings Aerospace The New Generation For The Next Generation Company Presentation.
DRIVING INNOVATION AND ABILITY TO COMPETE THROUGH OUTSOURCING Anthony (Tony) C. Bernardo, Alloy Polymers Inc. NPE 2003 bernardo:
INTEGRATION OF E - BUSINESS WITH ERP SYSTEM P RESENTATION ON INTEGRATION OF E - BUSINESS WITH ERP SYSTEM Presenting by Presenting by, Shruti raj Anushree.
Facilities Management Category Management Plan Synopsis Version 1.1 (March 2015)
Trends in supplier selection In the past: supplier selection should be purchasing’s domain Now: necessary to bring together organizational resources outside.
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified.
Chapter 8 Integrating the supply chain
New Opportunities for P3s on Military Installations NCPPP Conference July 2014 Barry Scribner Co-President, Public Institutions JLL.
U. S. Coast Guard Aircraft Repair and Supply Center.
EWEC Athens Opportunities in Outsourcing O&M 01 March 2006.
Naval Inventory Control Point 1 PBL Background The Support Spectrum Mini-stock point Commercial Off-the-shelf “Full Service”Contractor Logistics Support.
Industrial Engineering Roles In Industry
Collaborative Environmental Procurement Strategies May 24, 2006 Pamela Brody-Heine Eco Stewardship Strategies Zero Waste Alliance.
Naval Inventory Control Point 1 F/A-18E/F Integrated Readiness Support Teaming (FIRST) concept, an alternative support strategy emphasizing Government/Industry.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
1 Logistics Conference & Exhibition May 20, 2004.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Performance Based Logistics
ADTRAN: The Network Access Company. 2 Telecommunications u Multi-billion dollar industry u Voice and digital data transmission u Carrier and End User.
1 Twelfth PEO/SYSCOM Commanders Conference The NAVSEA Perspective On Full Service Partnering Mr. John Goodhart Assistant Deputy Commander Fleet Logistics.
2006 Veterans and Service-Disabled Small Business Conference Veterans Doing Business with the Department of Defense Doing Business With The Navy Mr. Bruce.
Make Your Mark HALO Branded Solutions We will achieve your promotional objectives! Any combination of our online... Or offline services will provide.
Lockheed Martin Aeronautics Company Sustainment Partnering: A Value Added Strategy Bill Anderson Vice President, Customer Support Lockheed Martin Aeronautics.
U.S. Army MaterielCommand Mr. Gary Motsek Deputy G3, Support Operations Mr. Gary Motsek Deputy G3, Support Operations 21 st Century Organic Industrial.
F/A-18 Awarded & Pending PBLs
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
Oklahoma Small Business Manufacturing for Aviation Conference Presentation - Subcontracting August 10, 2005 Nathaniel Stevens Sr. Systems Engineer.
Doing Business with the Naval Air Systems Command Presented to: SMART PROC 2015 Presented by: Ken Carkhuff Deputy Associate Director NAVAIR Office of Small.
© 2015 Rockwell Collins All rights reserved. Preparing for Tomorrow’s Supply Chain Methods to Reduce Aircraft Availability Risk Bob Haag, Sr. Director,
Industry Day DoD Parts Management Reengineering LMI McLean, VA May 8, 2007 Parts Standardization and Management Committee (PSMC )
Management Information Systems Islamia University of Bahawalpur Delivered by: Tasawar Javed Lecture 3b.
Pirojshaw Sarkari CEO Mahindra Logistics Ltd Cracking the code on outsourcing – Partnering.
Naval Inventory Control Point 1  Work with all stakeholders early in the PBL formulation process to develop system support strategy  Develop SOW and.
Naval Inventory Control Point 1 Performance Based Logistics: A New Business Paradigm Ready. Resourceful. Responsive! Naval Inventory Control Point CAPT.
© Copyright 2003 Frost & Sullivan. All Rights Reserved. United States Unmanned Aerial Systems Market Aerospace and Defense “The U.S. unmanned aerial systems.
Plant Maintenance Experts CPM Engineering offers diagnosis and repair of electrical and mechanical equipment. From pump, gearbox & motor repairs, machining.
Cheryl Hiles, Director of Sustainable Energy Delivery.
INTRODUCTION TO SUPPLY CHAIN MANAGEMENT. What is a Supply Chain? A supply chain consists of the flow of products and services from: Raw materials manufacturers.
1 PEO (A) AIR ASW, ASSAULT & SPECIAL MISSION PROGRAMS PEO (A) AIR ASW, ASSAULT & SPECIAL MISSION PROGRAMS PEO (U&W) UNMANNED.
1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.
DRAFT Strategic Customer Value Analysis May NAVAIR OVERVIEW INTERVIEW NAVAIR OVERVIEW INTERVIEW.
Action/Initiative Date Action Initiated: December 2003 Status: On-Going Government and Industry Forum consisting of all military services, weapons system.
12 good reasons to buy an ABB TrafoStar™ transformer
Department of Defense PBL Award Winners
Performance Based Logistics
12 good reasons to buy an ABB TrafoStar™ transformer
CTMA Investment - $90K; Industry Cost Share - $185K
Department of the Navy Performance Based Logistics
Building Competitive advantage through functional level strategies
ADTRAN: The Network Access Company
WSH Experts WSH Experts Pte Ltd established in Singapore to provide integrated services to the industry. We provide wide range of services to all the sectors.
Building Competitive advantage through functional level strategies
Doing Business With The Navy
Future Airborne Capability Environment (FACE™) Support
Building Competitive Advantage Through Functional-Level Strategies
Presentation transcript:

Performance Based Logistics: Transformation Through Partnership

We provide cost-wise readiness and dominant maritime combat power to make a great Navy / Marine Corps team better. NAVAIR MISSION STATEMENT

IMPORTANCE OF NAVAIR DEPOTS NAVAIR Depots are Key to Readiness –Ready, Controlled Source of Depot Maintenance –Minimize Equipment Out-of-Service Time –Ensure Steady Flow of Engines and Components –In-service and Emergency Repair On-Site –Quick Response Manufacturing Capabilities –Depot’s Have Capability to Repair Over 18,075 Different Components We are there for the fleet when the fleet needs us.

Depot Enterprise Products & Services AIRCRAFT REWORK F/A-18 E-2, C-2 S-3 H-60 H-53 H-1 ENGINE REWORK ENGINE REWORK LM2500 COMPONENT REPAIR CATE INSTRUMENTS COMM / IFF NAV / ELEC RADAR CSD / ROTATING ELEC TECHNOLOGY COMPOSITE REPAIR BEARINGS CALIBRATION HYDRAULICS COMMON ATE AIRCRAFT REWORK P-3 EA-6B F-14 H-60 ENGINE REWORK ENGINE REWORK J52 F404 TF34 F414 COMPONENT REPAIR ELECTRO-OPTICS ASW SYSTEMS RACKS / LAUNCHERS AIR REFUELING STORES ELECTRONIC WARFARE TECHNOLOGY EO / EW ENVIRONMENTAL AIRCRAFT REWORK AV-8B H-46 H-53 H-1 ENGINE REWORK ENGINE REWORK T58 T76 T400 COMPONENT REPAIR DYNAMIC COMPONENTS ROTOR BLADES PROPS BLADES / VANES APU / GTC PNEUMATICS NON-AVIONICS SPT EQUIP TECHNOLOGY VERTICAL FLIGHT FCIM UAV / RPV COMPOSITE REPAIR F402 T64 J79 FIXED / ROTARY WING WEST COAST ROTARY WING / VSTOL FIXED / ROTARY WING EAST COAST Cherry Point Jacksonville North Island

NAVAIR Public-Private Partnerships Agreement between Public and Private Sector –Depot Provides Articles and/or Services to Industry –Industry Leases Depot Equipment and/or Facilities

Performance Based Logistics Partnership (PBL’s) Single Supplier: –Meets Material Needs –Manages Inventory, Storage and Transportation –Increases Product Availability and Reliability –Manages Obsolescence –Enable Cost-Wise Readiness General Business Approach: –The PBL MUST Provide the Fleet With Increased Reliability and/or Availability at the Same or a Reduced Cost.

PBL Advantages Cost-Wise Readiness Helps the Fleet Improve Component Availability Improve Reliability Reduce Fleet Costs

PBL Benefits to Depot Improved Material Availability Capitalize on Depot Artisan Strengths Clear Expectations for Partners Distributes Financial Risks

PBLs and NAVAIR Jax Currently Five PBL agreements –More on the Horizon, in Negotiation GE, Raytheon, Boeing, Rockwell Collins, Lockheed Martin Covered under Contract: – Depot Skills – Products – Facilities and Equipment – Indirect Support Functions

PBL CONTRACTS at NAVAIR JACKSONVILLE Boeing –F/A-18 Integrated Readiness Support Team General Electric Aircraft Engines (GEAE) –F-404 Engine Components Raytheon Company –AN/AAS-44 Forward Looking Infra-Red (FLIR)

Boeing and U.S. Navy F/A –18E/F Integrated Readiness Support Teaming First of Kind –Includes All Three Depots –Affects Entire Aircraft Platform Est. Total Contract Value: $770 million

Partnership Provides Depot Level Repair of F/A-18 E/F Unique Components Total Anticipated Revenue for NAVAIR Depot Jacksonville is $1.5M NAVAIR Jacksonville: –Currently Repairs F/A-18 E/F Gun Drive –Will Repair SUU-79/80 Wing Pylons and the Aircraft Radome Boeing-FIRST

FIRST Fleet Benefits Unites Innovation and Responsiveness of Industry with the Expertise and Capacity of NAVAIR Depot Jacksonville Teamwork Generates Significant Operating and Support Cost Avoidance

General Electric Aircraft Engines (GEAE) F404 Engine Component PBL Partnership Provides for Repair of F404 Engine Components Used to Power the FA-18 Hornet Five Year PBL Contract Total Contract Award Valued at Approximately $510M Anticipated Revenue for NAVAIR Jax: $165M Over Five Years

GEAE – F404 Engine Components Fleet Benefits –Increased Reliability Achieved by GEAE Performance Incentives –Increased Readiness Through Parts Availability –Allows Industry to Bring Flexibility and Innovation Into the Management of the Supply Chain –Reduction in Total Ownership Cost

GEAE – F404 Engine Components Defining Features –GEAE Provides Material, Program Management, Warehousing and Information Technology –Largest Dollar Revenue Generating PBL for NAVAIR Jacksonville

Raytheon AN/AAS-44 PBL Provides Depot Level Repair of AN/AAS- 44 Forward Looking Infra-red (FLIR) System Used on the SH-60B & the HH- 60H Helicopter –Ten Year PBL, 5-year Base With a 3- and 2-year Option –Total Contract Valued at Approximately $123m –Anticipated NAVAIR Jacksonville Revenue: $11.3M Over 10 Years

Raytheon AN/AAS-44 PBL Fleet Benefits –Increased Reliability –Increased Operational Availability –Reduction in Total Ownership Cost

Raytheon AN/AAS-44 PBL First PBL for NAVAIR Jacksonville to Establish New Workload Capability Investment by Raytheon in: –Depot Support Equipment –Artisan Training Integrated Processes to Achieve Lower Cost Solutions Through Lean & R6 Sigma

Keys to Smooth Implementation Preplan, Preplan, Preplan Ensure Partners Can Integrate Create Employee Buy-In Partners Must Have Common Goal –WARFIGHTER SUCCESS!

Contact Information: Director Industrial Business Operations Office (904) , ext. 104