Joint Working Group for DoD Systems Engineering Standardization

Slides:



Advertisements
Similar presentations
DT&E Cmte - Walking The Line with Title 10 1 Beth Wilson Industry Co-Chair NDIA System Engineering Division, DT&E Committee Test Architect, Raytheon Company.
Advertisements

ESOH Committee Task Plan
Program Management Office (PMO) Design
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
A Navy Business Initiative Defense Daily OA Summit 12 November 2013 Nickolas H. Guertin, PE Director for Transformation DASN RDT&E
2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Dave Roberts NDIA PMSC.
1 Why is the Core important? To set high expectations – for all students – for educators To attend to the learning needs of students To break through the.
NDIA Software Industry Experts Panel Paul R. Croll, Chair NDIA Systems Engineering Division Meeting 24 June 2008.
ISO Current status of development
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
EPLC Deliverables Sherry Brown-Scoggins & Wanda Hall
ISO 9001:2015 Revision overview December 2013
ISO 9001:2015 Revision overview - General users
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Buck Crenshaw, Program Element Manager, NASA-Wide.
1. 2 Why is the Core important? To set high expectations –for all students –for educators To attend to the learning needs of students To break through.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
Implementing ISO/IEC in your workplace (And why should technical communicators care about standards, anyway?) George Hayhoe Mercer University School.
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
Work breakdown structure
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Page 1 ISO/IEC JTC 1/SC 7/WG 7 N Summary of the Alignment of System and Software Life Cycle Process Standards The material in this briefing.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
NDIA SE Division – 2014 Plan - Summary February 12, NDIA Systems Engineering Division 2014 Plan Summary - Annual Planning Meeting December 11-12,
1 S2ESC Quality Management Planning Group John Walz Quality Management Planning Group Chair P730 Vice-Chair S2ESC ExCom 30-Jul-08 Melbourne, FL.
10-Aug-04 IEEE-SE2SC Study Group on Quality Management Systems Membership –John Walz –Scott Duncan –Other volunteers? SP-07 - Relationship to Quality Management.
Joint Meeting Report on Standards 8 July Recent Accomplishments Systems Modeling Language (SysML) specification accepted for adoption by OMG AP233.
Earned Value Management Presented By: Steve Krivokopich May , 2006.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
A Net-Centric DoD NII/CIO 1 Sample Template Community of Interest (COI) Steering Committee Kick-off Date: POC:
SC7 - IEEE CS Activity Status Report – T. Doran 6 November 2007 To: J. Walz IEEE CS SAB
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
26-Aug-04 1 Quality Management Standards for Software Sector U.S. TAG for ISO TC 176 Quality Management Washington, DC 26-Aug-04 John Walz IEEE Software.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
1 Program Management Systems Committee (PMSC) Contract / Subcontract Issues Working Group Industry Issues and Position Summary 13 August 2008.
ISO Current status of development ​ ​ ISO development process ​1​1.
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
1 ISO/PC 283/N 197 ISO Current status of development November 2015.
Electronic Enterprise Integration Committee Overview of Aerospace Industry IUID Data Exchange Guideline December 14, 2005 Bill Zirkel, Northrop Grumman.
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
1 Systems Engineering Initiatives 26 June 2007 Dr. Don Gelosh Sr. Systems Engineering Consultant OSD(AT&L)/SSE/ED.
1 Overview of SAE’s AS6500 “Manufacturing Management Program” David Karr Technical Advisor for Mfg/QA AFLCMC/EZSM
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
SE513 Software Quality Assurance Lecture12: Software Reliability and Quality Management Standards.
LOG204 (DL) Configuration Management Bruce Hatlem Logistics Functional IPT June 26, 2007.
1 The Voice of the Industrial Base 1 IBR Guide NDIA PMSC Working Group NDIA PMSC Meeting August 7, 2007 Prepared by; NDIA IBR Working Group August 2007.
NDIA - ICPM Program Planning and Scheduling Subcommittee Program Planning and Scheduling Subcommittee (PPSS) Initiative Presented by: Ms Lil Vayhinger.
Dr. Trevor Smith Chair ISO/TC 176 Quality Management & Quality Assurance Worldwide Quality Director Global Manufacturing & Logistics Eastman Kodak Company.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of:1 Mrs. Marty Evans SE Forum October 15, 2004 Institutionalizing.
1 Services Contracting in the DoD: An Empirical Analysis of the Use of a Project Management Approach Breakout Session # D14 Dr. Rene G. Rendon, CFCM,
ICOTE Meeting October, Chief Developmental Tester Project Status for ICOTE October 2014 Brendan Rhatigan – Lockheed Martin.
1 Copyright © 2014 by Lockheed Martin Corporation SE Use Cases SysML Roadmap Activity John Watson Lockheed Martin 6/17/2014.
IEEE Computer Society Category A Liaison to ISO/IEC JTC 1/SC 40: Status Report Annette Reilly IEEE Computer Society Liaison.
SAB Sponsor Progress Report
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
SQA project process standards IEEE software engineering standards
Sample Fit-Gap Kick-off
SQA project process standards IEEE software engineering standards
Implementation Strategy July 2002
Overview of SAE’s AS6500 “Manufacturing Management Program”
INCOSE – North Texas Chapter
ISO/IEC IEEE/EIA Software Life Cycle Processes Supporting Life Cycle Processes IEEE Supporting Processes.
HHS Child Welfare National IT Managers' Meeting
Submission Title: TG9ma Opening Report for July Meeting
Presentation transcript:

Joint Working Group for DoD Systems Engineering Standardization Technical Reviews & Audits Standard Presentation to NDIA SE Division 11 December 2013 Garry Roedler (WG Chair)

Agenda DoD Goals and Objectives Background – Current Situation and Approach Current Status Looking Forward

Goal of DoD Standardization Initiative “Provide DoD and DoD contractors with a structured, uniform approach” in the areas identified as gaps Improve communication Ensure common expectations Add realism to bids

Standardization Objectives Mutual-benefit stipulations: Must meet both party’s needs and objectives Potential teaming partners must have existing experience with subject matter of document and existing infrastructure for publishing standards Content of documents must be consistent with government needs Ensure right kind of standard is developed Clear statement of requirements that speaks “common language” Specific enough to support realistic bidding and resourcing Proper contractual language – SHALL and should Ensure right amount of the right standards are included Tailorable for different domains and contracting environments Consistent with DOD approach Conform to established, over-arching industry process standards

Current Situation Each standard is intended to be put on future system contracts

DOD SE/TRA Standards Process Present effort

Membership of DoD Joint SE Working Group Industry Associations Defense Aerospace Corp BAE Systems Ball Aerospace Boeing General Dynamics Harris Corp L-3 Com Leidos Lockheed Martin Northrop Grumman Raytheon SAIC United Technologies AIA IEEE-CS/SA INCOSE ISO/IEC NDIA SAE Intl Air Force (Multi-parts) Army Navy (Multi-parts) OSD – DASD (SE) DAU DCMA DSPO Leadership Team Chair, Garry Roedler, Lockheed Martin Vice-chair, Dave Davis, USAF SMC Secretary, Brian Shaw, The Aerospace Corp. Technical Editor, Bill Bearden, INCOSE (SE) Technical Editor, Mark Henley, L-3 Com (TR&A) Membership of WG Has Broad Span Will be adding members to cover academia

Review of IEEE Standards Process IEEE Process Stresses Consensus

Reviewers Focus Need to ensure: Technical accuracy Usability in defense environment Requirements are relevant and reflect good practice Requirements for deliverables are compatible with current methods, and do not drive a particular method/technique Requirements do not result in unintended consequences

Schedule Information Business rhythm/cadence TR&A and SE will have 2-week phase separation for increments Meeting Date +0 +7 +14 +21 WG Provide Inputs Editor Prepares Draft Leadership Team Initial Review Draft to WG for Review WG Review of Draft +25 +28 Submit Review Comments to Editor Editor Consolidates Comments Review Issues from Comments at Mtg

IEEE Joint SE WG Schedule/Status Integrated schedule balances efforts of both projects Draft development : on-going and on schedule Working draft: May 2014 Publication: December 2014 Each project = 7 development increments plus reviews and balloting 15288.1 (SE) 2 increments completed; 3rd increment in review. 15288.2 (TR&A) 2 increments completed; 3rd increment about to be released. 1 2 Progress: 15288.1 15288.2 Draft Development Balloting Period 1 2 Currently on track

Looking Forward 2014 Development and publication of aligned base documents ISO/IEC/IEEE 15288 (DIS 1Q14; FDIS 3Q14; Publish 4Q2014) IEEE 15288.1 (draft 2Q14; publish 4Q2014) IEEE 15288.2 (draft 2Q14; publish 4Q2014) Also, INCOSE SE Handbook (2Q2014) Communicate across other working groups to ensure consistency of terms, concepts, and other information Liaisons established with CM and Mfg Mgt Standards WGs Communication across WGs to agree on resolution of identified issues Start preparation for adoption, governance, support, use 2015 Adoption of standards (early 2015) Complete preparation for use of the standards Alignment of SE Resources

Back-up Charts

Source Products Source Products for SE Standard ISO/IEC/IEEE 15288 (CD.2), 2013 ISO/IEC/IEEE 15289, Content of life-cycle information products (documentation), 2011 SMC-S-001, Systems Engineering Requirements and Products, July 2013 DoDI 5000.02 NATO AAP-48, NATO System Life Cycle Processes, July 2012 (Addendum Standard to 15288; focused on NATO Armament Systems) Defense Acquisition Guide (DAG), Chapter 4, Systems Engineering, 2013 INCOSE SE Handbook V3.2 /V4.0 Draft SEBoK EIA 632, Engineering of a System ISO/IEC/IEEE 24748-4 NAVSEA Instruction & Policy 5000-009 for Systems Engineering Technical Reviews Source Products for TR&A Standard ISO/IEC/IEEE 15288 (CD.2), 2013 DoDI 5000.02 SMC-S-021, Technical Reviews and Audits for Systems, Equipment and Computer Software, Volume 1, September 2009 NAVSEAINST 5009.9, Naval Systems Engineering Technical Review Handbook, July 2009 NAVAIRINST 4355.19E, Systems Engineering Technical Review Process NAVAIR Systems Engineering Technical Review Process Handbook, initial release Defense Acquisition Guidebook, Chapter 4. Source Products include a combination of Industry and DoD resources

Source Products Usage Approach for Use of Source Products Use as body of knowledge for defense programs Identify relevant information that should be considered Identify differences or additional tasks that need to be considered Identify key outputs and their attributes Identify essential guidance needed to provide common understanding Assimilate key information at level that applies to most defense programs State in terms of “what”, not “how”

Review of PARs and Technical Approach Standard for Application of SE on Defense Programs Summary of PAR for Systems Engineering Identifier of Standard – IEEE Std 15288.1 Title: Standard for Application of Systems Engineering on Defense Programs Scope: System life cycle processes, activities, and tasks of ISO/IEC/IEEE 15288 for use on any defense system across the life cycle Purpose: This standard implements ISO/IEC/IEEE 15288 for use by United States Department of Defense (DoD) organizations and other defense agencies in acquiring systems or systems engineering support. Need: Provide the defense specific language and terminology for the standard to ensure the correct application of acquirer-supplier requirements for a defense prgm. Technical Approach: Addendum to ISO/IEC/IEEE 15288 and will: Not repeat processes and information in 15288 Include defense specific language and terminology Include necessary tailoring or changes to existing elements Include any additional explanation or guidance

Review of PARs and Technical Approach Standard for Application of Technical Reviews & Audits Summary of PAR for Technical Reviews & Audits Identifier of Standard – IEEE Std 15288.2 Title: Standard for Application of Technical Reviews and Audits on Defense Programs Scope: Establishes the requirements for technical reviews and audits to be performed throughout the acquisition lifecycle for the U.S. Department of Defense (DoD) and other defense agencies. Purpose: Amplify ISO/IEC/IEEE 15288 Clause 6.3.2.3.a for selection, negotiation, agreement, and performance of the necessary technical reviews and audits, while allowing tailoring flexibility for the variety of acquisition situations/ environments when the technical reviews or audits are conducted. Need: Provide the defense specific language and terminology for the standard to ensure the correct application of acquirer-supplier requirements for a defense program. Technical Approach: Standard will be in the form of a full standard that has links to ISO/IEC/IEEE 15288 and will: Elaborate on the activities and tasks related to TR&A Include defense specific language and terminology needed for the standard Include the criteria for reviews & audits Include the expected/required outcomes/ products of reviews & audits Include any additional explanation or guidance