Reducing Project Duration

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Chapter 7 Schedule Control
Project Management 6e..
Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 1 Reasons to Reduce Project Durations: 1.To realize incentive pay 2.To fit.
Project Management 6e..
Project Management for Maximum Effectiveness
Operations Management
Chapter 9: Reducing Project Duration
SCHEDULE COMPRESSION In real practice – how would you compress your Schedule?
Reducing Project Duration: Project Crashing
Estimating Project Times and Costs
Reducing Project Duration
Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening) 4/17/ :55 AM.
OPER 576 Project Management Reducing Project Duration or Project Crashing Greg Magnan, Ph.D. May 20, 2004.
Quiz#1 Chapter 5: Estimating Project Times and Cost
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Scheduling Resources Chapter 8.
7-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 7 Project Time Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Analyzing Cost-Time Trade-Offs There are always cost-time trade-offs in project management. – You can completing a project early by hiring more workers.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
Chapter 4 Defining the Project.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Scheduling Resources and Costs CHAPTER EIGHT PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
Time/Cost Trade-off Analysis
Chapter 9: Reducing Project Duration
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Estimating Project Times and Costs Chapter 5.
Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening) Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening)
Estimating projects Estimating  The process of forecasting or approximating the time and cost of completing project deliverables  The task of balancing.
Scheduling Resources and Cost
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Human Resources n How do we compete with everybody else who needs resources? n Where do we find people when we can’t hire new employees? n What does time.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Management and the Future
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved. 10/27/07 SJSU - Bus. 286 David Bentley (Gray & Larson)1 Chapter 5 – Estimating.
1 Finishing Projects Fast James R. Burns Professor of Operations Management and Information Technology Texas Tech University.
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
Chapter 7 Schedule Control. 22 Learning Objectives  Perform the steps in the project control process  Determine the effects of actual schedule performance.
5 Ir. Haery Sihombing/IP Pensyarah Pelawat Fakulti Kejuruteraan Pembuatan Universiti Teknologi Malaysia Melaka Project Management Estimating Project Times.
Organization: Structure and Culture
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
3/18/ :47 AM 1 Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening)
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
1 Finishing Projects Fast James R. Burns Professor of Operations Management and Information Technology Texas Tech University.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
University Of Palestine Faculty Of Applied Engineering & Urban Planning Civil Engineering Department PROJECT MANAGEMENT Scheduling Resources and Costs.
Time-Cost Trade-off Models
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management 6e..
Reducing Project Duration
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Project Management.
Project Management -- Scheduling Resources and Costs
Project Management -- Reducing Project Duration
Reducing Project Duration
Engineering Project Management
Project Management Operations -- Prof. Juran.
Lecture 6: Time-Cost Trade-Offs
Finishing Projects Fast
Manajemen Industri Teknologi informasi
Reducing Project Duration
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Presentation transcript:

Reducing Project Duration Chapter 9 Reducing Project Duration

Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity usually incurs additional direct costs. Cost-time solutions focus on reducing (crashing) activities on the critical path to shorten overall duration of the project. Reasons for imposed project duration dates: Customer requirements and contract commitments Time-to-market pressures Incentive contracts (bonuses for early completion) Unforeseen delays Overhead and goodwill costs Pressure to move resources to other projects

Options for Accelerating Project Completion Adding Resources Outsourcing Project Work Scheduling Overtime Establishing a Core Project Team Do It Twice—Fast and Correctly Fast-Tracking Critical-Chain Reducing Project Scope Compromise Quality

Explanation of Project Costs Project Indirect Costs Costs that cannot be associated with any particular work package or project activity. Supervision, administration, consultants, and interest Costs that vary (increase) with time. Reducing project time directly reduces indirect costs. Direct Costs Normal costs that can be assigned directly to a specific work package or project activity. Labor, materials, equipment, and subcontractors Crashing activities increases direct costs.

Reducing Project Duration to Reduce Project Cost Identifying direct costs to reduce project time Gather information about direct and indirect costs of specific project durations. Search critical activities for lowest direct-cost activities to shorten project duration. Compute total costs for specific durations and compare to benefits of reducing project time.

Project Cost—Duration Graph FIGURE 9.1

Constructing a Project Cost—Duration Graph Find total direct costs for selected project durations. Find total indirect costs for selected project durations. Sum direct and indirect costs for these selected project durations. Compare additional cost alternatives for benefits.

Constructing a Project Cost—Duration Graph Determining Activities to Shorten Shorten the activities with the smallest increase in cost per unit of time. Assumptions: The cost relationship is linear. Normal time assumes low-cost, efficient methods to complete the activity. Crash time represents a limit—the greatest time reduction possible under realistic conditions. Slope represents a constant cost per unit of time. All accelerations must occur within the normal and crash times.

Activity Graph FIGURE 9.2

Cost—Duration Trade-off Example FIGURE 9.3

Cost—Duration Trade-off Example (cont’d) FIGURE 9.3 (cont’d)

Cost—Duration Trade-off Example (cont’d) FIGURE 9.4 (cont’d)

Cost—Duration Trade-off Example (cont’d) FIGURE 9.4 (cont’d)

Cost—Duration Trade-off Example (cont’d) FIGURE 9.4 (cont’d)

Summary Costs by Duration FIGURE 9.5

Project Cost—Duration Graph FIGURE 9.6

Practical Considerations Using the Project Cost—Duration Graph Crash Times Linearity Assumption Choice of Activities to Crash Revisited Time Reduction Decisions and Sensitivity

What if Cost, Not Time is the Issue? Commonly Used Options for Cutting Costs Reduce project scope Have owner take on more responsibility Outsourcing project activities or even the entire project Brainstorming cost savings options

Key Terms Crash point Crash time Direct costs Fast-tracking Indirect costs Outsourcing Phase project delivery Project cost–duration graph