Keeping your Automated Devices Alive

Slides:



Advertisements
Similar presentations
6/1/2014FLOCON 2009, Scottsdale, AZ. DoD Disclaimer 6/1/2014FLOCON 2009, Scottsdale, AZ This document was prepared as a service to the DoD community.
Advertisements

Distributed Load Algorithms LBNL Demand Response Automated Server 1 Siemens Smart Energy Box Internet OpenADR ClientWeather data APOGEE BASWattStopper.
National Security Technology Center (NSTC)
Laser Direct Manufacturing of Nuclear Power Components
Smart Grid Communication System (SGCS) Jeff Nichols Sr. Director IT Infrastructure San Diego Gas & Electric 1.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
WinDS-H2 Model and Analysis Walter Short, Nate Blair, Donna Heimiller, Keith Parks National Renewable Energy Laboratory May 27, 2005 Project AN4 This presentation.
Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
Emme Mayle Dr. Charles Rovey Missouri State University
Implementing American Recovery and Reinvestment Act Work Safely Sam Easterling ES&H Projects Specialist ES&H B&W Y-12.
Technical Report NREL/TP April 2007 Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Spring 2007 Composite Data.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
Our utility paradigm is changing… will YOU be ready? Paul Kalv Smart Grid Research Consortium Electric Director October 20, 2011 Chief Smart Grid Systems.
Smart Grid Primer Funded by the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Energy Bar Association – Primer for Lawyers.
Megan Houchin Safety Analysis Engineering Y-12 National Security Complex SAWG May 7 th, 2012.
North American Synchrophasor Project Initiative NASPI Work Group Meeting Oct , 2011 Joseph H. Schaefer Florida Power & Light.
City of Leesburg AMI Project Paul Kalv, Leesburg Electric Director Doug Handley, Utility Consulting Services Advanced Metering Infrastructure – AMI.
Slide 1 Upgrading the United States Transuranium and Uranium Registries’ Pathology Database Stacey L. McCord, MS USTUR Project Associate
Jeremy W. Poling B&W Y-12 L.L.C. Can’t Decide Whether to Use a DATA Step or PROC SQL? You Can Have It Both Ways with the SQL Function!
Using Shibboleth as Your WebSSO Authentication System CAMP Shibboleth: Enabling Campus and Federated Single Sign-On June 27, 2006 Brendan Bellina Identity.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
“Discovery Across Texas” New Technology Solutions for Wind Integration in ERCOT Synchrophasor Project Status Update Bill Muston Oncor Electric Delivery.
1 © Air Products and Chemicals, Inc Options for Production and Delivery of Low-Cost Hydrogen Edward C. Heydorn Business Development Manager Hydrogen.
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
1 Jon Sudduth Project Engineer, Intelligent Grid Deployment SWEDE April 26, 2011.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
Deposition Velocity Issues at Y-12 Bruce A Wilson Chief Engineer, Nuclear Facility Safety Douglas Clark Analyst B&W Technical Services Y-12 May 9, 2012.
Jeffrey C Quick, Utah Geological Survey Sara Pletcher, Project Manager National Energy Technology Laboratory.
1 Floyd Galvan October 12-13, 2011.
1 Technical Report NREL/TP March 2009 Controlled Hydrogen Fleet Infrastructure Demonstration and Validation Project Spring 2009 Composite Data.
Modeling and Validation of a Large Scale, Multiphase Carbon Capture System William A. Lane a, Kelsey R. Bilsback b, Emily M. Ryan a a Department of Mechanical.
PRES-ET A011 Lynn J. Harkey SDIT Project Engineer Uranium Processing Facility Project B&W Y-12 August 26, 2009 The Process, Methods and Tool Used.
OG&E’s Smart Study TOGETHER: Impact Assessment of Enabling Technologies and Dynamic Pricing Rates Katie Chiccarelli, Craig Williamson January 24, 2012.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
USAEE Conference 2011, CJN Oct 2011 The Role of CCS under a Clean Energy Standard 30 th USAEE/IAEE Conference Oct 10, 2011 Washington, DC Chris Nichols,
2011 Broward Municipal Green Initiatives Survey Results GHG Mitigation Energy 2/3 of Broward’s reporting municipalities have implemented incentives or.
Gas-Electric System Interface Study OPSI Annual Meeting October 8, 2013 Raleigh, North Carolina.
Y-12 Integration of Security and Safety Basis, Including Firearms Safety David Sheffey Safety Analysis, Compliance, and Oversight Manager B&W Technical.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
V Work Environment Forecast – Dec There is a COLD WIND a coming… Larry Supina Manager, Pantex Readiness Consolidated Nuclear Security, LLC
West Virginia Smart Grid Implementation Plan Steve Bossart, Dirk Baker, and Steve Pullins October 2009.
Long Term National Impacts of State- level Policies WindPower 2006 Nate Blair, Walter Short, Paul Denholm, Donna Heimiller National Renewable Energy Laboratory.
1 Technical Report NREL/TP May 2010 Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Spring 2010 Composite Data.
Primer Briefing “Brand Name or Equal” Purchase Descriptions Ask a Professor - # Date:
Leveraging: What’s New ? Been There / Done That ? Heard this All Before? Meg Power, PhD Economic Opportunity Studies Washington, DC NASCSP Fall Meeting,
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
What’s All This I Hear About Information “Architecture?” InterLab 06 Joe Chervenak & Marsha Luevane National Renewable Energy Laboratory.
Technical Report NREL/TP April 2008 Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Spring 2008 Composite Data.
Utility Engineers, PC.  Generation  Transmission  Distribution.
National Energy Technology Laboratory Driving Innovation ♦ Delivering Results Chris Nichols USAEE Conference October 2015 An analysis of the capacity factors.
John Blair Woods Manager, Program Analysis and Evaluation Safeguards, Security, & Emergency Services B&W Y-12 August 27, 2009 Integrated Safety and Security.
1 Technical Report NREL/TP June 2010 Early Fuel Cell Market Deployments: ARRA Quarter 1 of 2010 Composite Data Products Final Version February.
V UNCLASSIFIED This document has been reviewed by a Y-12 DC/UCNI-RO and has been determined to be UNCLASSIFIED and contains no UCNI. This review does not.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA - WISP Project NASPI Work Group Meeting October 12-13, 2011 Scott Lissit – Project Manager,
PJM Interconnection Smart Grid Investment Grant Update
1 Technical Report NREL/TP October 2008 Controlled Hydrogen Fleet Infrastructure Demonstration and Validation Project Fall 2008 Composite Data.
National Renewable Energy Laboratory 1 Innovation for Our Energy Future.
Evaluation of the Impact to the Safety Basis of Research Conducted in Production Facilities at the Y-12 National Security Complex Rebecca N. Bell Senior.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
1 Technical Report NREL/TP September 2009 Controlled Hydrogen Fleet Infrastructure Demonstration and Validation Project Fall 2009 Composite Data.
2015 NARUC Winter Meeting Nick Wagner – Iowa Utilities Board 1.
Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
Spring 2016 ICC Meeting – Subcommittee F Estimating the Value / Benefit of Diagnostics 1 of 3 – Perhaps? Josh Perkel and Nigel Hampton NEETRAC.
Subset Selection in Multiple Linear Regression
Smart Grid Primer Energy Bar Association – Primer for Lawyers
September Workshop and Advisory Board Meeting Presenter Affiliation
September Workshop and Advisory Board Meeting Presenter Affiliation
State Participation in Nonproliferation Regime Networks
2/3 20% 71% Half 54% Over Half 45% 14% Introduction GHG Mitigation
Presentation transcript:

Keeping your Automated Devices Alive CenterPoint Energy’s IG Deployment - Lessons Learned John Rush CenterPoint Energy Crew Leader- Intelligent Grid Deployment SWEDE Austin, TX May 1-3, 2013        

Automation History CenterPoint Energy (CNP) has had automation in place for over 40 years 1970’s - Substation relays - SCADA 1980’s - Remote Control Reclosers & Pole Top Switches - Distribution Automated Control System (DACS) 1990’s - Loop Sectionalizing - DACS 2010 – Department of Energy/CNP IG construction project begins 2010 - 18 IGSDs installed 2011 - 183 IGSDs installed; year end = 201 2012 - 183 IGSDs installed; year end = 384 DACS converted to Distribution Supervisory Control and Data Acquisition (DSCADA) 2013 - 21 IGSDs installed to date, 4/11/2013

Legacy DACS Maintenance Program Legacy DACS Maintenance Improvements DSCADA equipment monitored by Telecommunication & Control Systems Orgs SAP Notifications Intelligent Distribution Device (IDD) work orders dispatched via Mobile Data Distribution techs are DSCADA first responders System oversight and 30 day restoration metric Speaking points Legacy and IGSDs are monitored by a variety of groups; NOC, DSCADA Control, Distribution Control, IG project team The D2 FUW notifications are created by the NOC and allows for individual device tracking and restoration matrix history Work orders can be sent immediately to DSP tech (cap crew) and if necessary be referred Service centers are responsible for their devices and the reporting makes there efforts transparent

Intelligent Grid Deployment ≈ 31 Substation Upgrades ≈ 180 Distribution Circuits ≈ 600 Intelligent Grid Switching Devices (IGSD) ≈ 420K Customers Construction Schedule 14-19 installations per week 67% Complete YE 2012 100% by YE 2013 12kV & 35kV installations Site are fully commissioned upon completion of construction Minimizes out of service duration of manual switch upgrade to IGSD Allows for high volume of switch replacements in a small geographic area 7 crews working out of 6 service centers 5,000 Square Miles 2.3M Customers 16.4 GW Peak

Challenges and Opportunities New Technology Firmware Dual communication requirements Distribution SCADA (DSCADA) Multiple Vendors (5 IGSD combinations) Failures & Material Issues Volume of installations demanded higher expectations Documentation of issues into a multi-departmental log Training Distribution Operations techs required training on new installations and maintenance of devices None of the vendor’s FW was ready for dual comms Telecommunications was required to preform a site survey and assist with commissioning New control system (DSCADA) templates had to be prepared for site specific devices and comms ESM historically has utilized multiple vendors for the following advantages hold cost down improve supply restrictions Typical yearly installs ranged 20-30 devices per year, IG project installed 162 devices in a 2 month period Operation crews now needed to know how to commission and maintain the new devices, this was provided by ESM, Telecom, and Operations

QA/QC Vendors Vendor Audits Audit Reports Issue Resolution Factory visits Audit Reports CNP provided feedback Good/Best practices Gaps and improvement recommendations Issue Resolution Return Material Authorization (RMA) Reports CNP encourages transparency with ALL issues Encourage synergy between CNP and Vendors during acceptance and installation CNP sent a team (operations, engineers, electricians) to each vendor (switch & controller) After the visit CNP would document the factory visit and reply back to each vendor with our observations and recommendations Failures fully investigated and CNP reviews and accepts report prior to resuming receiving or installing devices CNP expects the vendors to be candid and timely on any issue they or other customers identify Speak to some examples of vendor support; application engineers flying in to CNP, weekly conference calls, dedicated resources

QA/QC CNP Logistics Shops New Pallet design (Facilitates Testing and Shipping) Shops Itemized checklist (Tester’s signature) Hi-Pot, Current Injection, and Relay Testing Communication & DSCADA Testing Kit (Distribution material palletized with IGSD)

QA/QC CNP (Cont.) Field Installation and Commissioning DPD crew and Telecom tech onsite DPD crew and Distribution Controller partner to commission IGSD IGSD Commissioning Document QC Each site is independently inspected IGSD QC report Issue Log & Documentation All issues are documented into a central issue log Risk Management provides oversight

IGSD Test Farm IGSD Test Farm

Availability Report 4-11-13

Operational Opportunities Improved System Reliability Critical Infrastructure is only out of service for short periods of time Existing Manual Switch replaced by IGSD within 2 days Existing IGSDs are out of service less than 14 days Efficiencies Gained IGSDs are fully tested prior to installation IGSDs are communicating upon construction completion (87%) Kits require less hot shot deliveries Early issue/problem detection Defined, Repeatable, and Scalable Processes

DOE Acknowledgement and Disclaimer 4/15/2017 DOE Acknowledgement and Disclaimer Per the DOE Grant Agreement,: “If you publish or otherwise make publicly available the results of the work conducted under the award, an acknowledgment of Federal Support and a disclaimer must appear in the publication of any material, whether copyrighted or not, based on or developed under this project, as follows:” Acknowledgment: “This material is based upon work supported by the Department of Energy under Award Number [DE-OE0000210]” Disclaimer: “This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Referenced herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinion of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.” 12 CenterPoint Energy Proprietary and Confidential Information