1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.

Slides:



Advertisements
Similar presentations
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
Advertisements

Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Air Traffic Management
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
Applications from packages I to III
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Introduction to PBN Seminar ICAO PBN Implementation 1.
SESAR Single European Sky Air traffic management Research
Regional ATFM in Europe
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon)
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Airbus Status on ADS-B In / Out Update
Federal Aviation Administration AP23 briefing on D3: ASAS Concept of operations ASAS-GN Seminar 13 Nov 08, Rome By Ken Carpenter, QinetiQ.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
International Air Transport Association Transition to the new CNS/ATM ATN 2000, September 2000, London Günther Matschnigg IATA Vice President Operations.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Guidance and Control Programs at Honeywell Sanjay Parthasarathy Honeywell Aerospace Advanced Technology October 11, 2006
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology September 2003.
Digital In The Skies Simon Daykin NATS Chief Architect.
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
SIP/2012/ASBU/Nairobi-WP/19
Chris Shaw, EUROCONTROL Experimental Centre
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
ASSTAR Project Overview & User Forum Objectives
Presentation transcript:

1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002

2 Overview  Purpose of the study  Team  Approach  Conclusions of ATM application analysis  ATM application roadmap  Stakeholder input  Technical requirements  Current status

3 Purpose of the study  Study to develop a roadmap for the implementation of data link services in European Air Traffic Management (ATM)  study launched by Single European Sky unit of the Directorate General for Energy and Transport (DG TREN)  due for completion by end 2002  Develop plan for deployment of data link applications and technologies for ATM in Europe  formulating a strategy for future implementation programmes  recommending the selection of future datalink applications, based on benefits  recommending the selection of technologies, based on the ability to support the selected applications

4 Purpose of the study  Key aim is to develop a strategy that can be widely supported by all stakeholders  extensive consultation with all interested stakeholders  peer review of all deliverables by ANS Providers, airspace user associations and manufacturers  public workshops, scheduled for July 2002 and November  Interested parties who wish to participate in the peer review process or to receive information, are requested to register at the study website

5 Study team  Core team  Airbus  Helios Technology (lead)  IATA  Integra  Sofreavia  Other partners  AENA  IAA  LFV/Swedavia  Mitre  NATS  University of Leiden  Eurocontrol  review input  expert assistance  Peer Review Group  review of deliverables  participation in stakeholder workshop

6 Study Approach

7 Evolution of ATM applications

8 Identify ATM applications  Identify ATM applications  needing communication services  could be implemented within European airspace before 2015

9 ATM application assessment  Assess which ATM applications offer most benefit to stakeholders  multi-criteria analysis  benefit calculations for combinations of ATM applications  Analyse implementation constraints  multi-criteria analysis for impact on ATM infrastructure  impact on the timescales for implementation

10 Selection of ATM applications

11 Timeline and technical requirements  Select those ATM applications which provide the best balance between benefits and implementation constraints;  Propose an initial timeline for the implementation of the ATM applications;  Provide technical requirements for the data links required to support the ATM applications  in the period up to 2010  taking account of the need to prepare for a later extension of the data link infrastructure in the period 2010 – 2015;  Obtain stakeholder endorsement of the selected ATM applications, the initial timeline and the technical requirements

12 Completion of Phase 1  Results in “ATM Application Roadmap  Widespread consultation and review  peer review group  stakeholder workshop  operators, service providers, industry represented

13 Phase 2  Assessment of technologies  ability to meet technical requirements  cost assessment  industrial impact  Derivation of technology roadmap  Community actions  2 nd Stakeholder Workshop  documentation to be provided by end of October  expect workshop to be held in November

14 ATM Application Analysis

15 Traffic growth  Traffic will continue to grow and is expected to at least double by 2015

16 Operating costs and airline profits  Airlines are incurring increasing costs and decreasing profits All units in $ per hourCost per hour Ground cost of ATFM delay Cost per additional hour of flight time Flight deck crew517 Fuel and Oil543 Flight equipment insurance 20 Maintenance and overhaul 683 Flight equipment depreciation 464 Rentals439 Landing charges490 En-route charges419 Total Eur/min

17 High level benefits expected by airspace users  Airspace users need 4 main qualities of service:  Safety  Capacity  Flight efficiency  Cost-effectiveness

18 Provision of en-route capacity  Automation of current control paradigm  has short term potential but will saturate in the medium term  Delegation of responsibility to the pilot  has the potential to provide substantial increases in capacity in en-route and remote regions  Steps  development of tools  introduction of spacing  trajectory coordination  self-separation

19 En-route  Selected ATM applications for en-route region provide  initial automation of current control paradigm –2004 – 2007: downlink of aircraft data –2006 – 2010: automation of air/ground communication  early introduction of spacing applications –2006 – 2010: airborne spacing, crossing and passing  leading to widespread adoption of airborne separation and self-separation –2011 – 2015: introduction of separation –2013 – 2018: self-separation leading to free flight  supported by increased delivery of information to aircraft –route availability –wide range of uplink services

20 ATM application roadmap for en-route capacity

21 Terminal and airport region  Potential for delegation more limited in terminal areas  planned arrival time into terminal areas  assisted by ground holding  use of spacing to optimise flows on approach and departure  use of data link to provide enhanced surface surveillance and routing

22 Terminal and airport region  Selected ATM applications for busy terminal and airport regions  provide automation of current control paradigm –2004 – 2010: increased use of downlink parameters –2004 – 2007: delivery of strategic clearances –2011 – 2015: automation of tactical communication  planned arrival time into terminal area –2013 – 2018: trajectory negotiation  widespread use of RNAV routes and spacing applications –2006 –2010: spacing including enhanced visual approaches and final approach spacing –2011 – 2015: departure spacing –2013 – 2018: final approach separation  use of data link to provide enhanced surface surveillance and routing –2006 – 2015: enhanced IMC operations, fusion of radar data and ADS, delivery of routing information

23 ATM application roadmap for terminal and airport regions

24 Safety enhancing ATM applications  Selected ATM applications  providing an airborne picture  reducing misunderstanding in air/ground communications  Airport safety  2005 – 2006: Enhanced visual approaches  2006 – 2007: Surface enhanced visual acquisition  2006 – 2007: Runway and final approach occupancy awareness  Terminal area safety  2004 – 2005: Enhanced surveillance in terminal and en-route airspace, limited additional information being displayed to the controller  2005 – 2006: Enhanced visual acquisition (EVA) in terminal airspace  2006 – 2007: Runway and final approach occupancy awareness

25 Safety enhancing ATM applications  En-route and remote regions  2004 – 2005: Enhanced surveillance in terminal and en- route airspace, limited additional information being displayed to the controller  2005 – 2007: Enhanced surveillance in terminal and en- route airspace providing a wider range of DAPs  2007 – 2008: Enhanced visual acquisition (EVA) in en- route airspace  2007 – 2008: Traffic situational awareness in core and transitional en-route airspace

26 Oceanic and remote regions  Selected ATM applications for oceanic and remote regions  Focus on supporting more efficient trajectories  2008 – 2010: Airborne separation in oceanic and remote airspace  2008 – 2010: Basic surveillance infrastructure via ADS-B in remote regions  2004 onwards: ATS in oceanic/remote areas

27 ATM applications for cost effectiveness  Other selected ATM applications may provide cost effective alternatives to current infrastructure  2008 – 2010: Fusion of current radar and ADS-B surveillance in terminal and en-route airspace  2011 – 2015: ATC surveillance using ADS-B in terminal and en-route airspace  2005 – 2013: ATC surveillance using ADS-B at airports

28 Stakeholder input

29 Stakeholder input  General stakeholder support has been received for the ATM application roadmap, although a number of issues will need to be addressed in the planning and execution of the programme  implementation timescales for spacing/separation/self- separation  greater emphasis on 4D trajectory negotiation  need for mandation and associated delays  global interoperability  higher priority for strategic air/ground communication  These issues to be addressed during Phase 2

30 Relationship to JAFTI  JAFTI: Joint User Requirements Group (JURG) ADS Fast Track Initiative (JAFTI)  Extended Visual Acquisition (EVA)  Improved Approach Spacing (CDTI Enhanced Flight Rules-CEFR)  Approach Spacing – Time Based Separation  Improved Airport Surface Surveillance and Communications  Support for Improved Medium Term Conflict Detection (MTCD) and Conflict Resolution Advisor (CORA)  En-route Crossing  Improved tracks (accuracy and update rate)  Use of ADS-B for double or triple surveillance coverage  ATM application roadmap compatible with JAFTI applications  greater emphasis on use of separation by JAFTI: –to maintain approach rates during poor weather conditions; –to provide time-based separation on the approach.  needs earlier implementation of APP10c (final approach separation)

31 ADS-B applications package 1  CARE/ASAS Activity 5: proposals for a first package of GS/AS applications  Provide a good starting point for the ATM application roadmap  More rapid progress on some ATM applications must be made if the timescales for delivery of benefits are to be met  earlier use of spacing en-route  need for firm proposals for introduction of separation

32 ADS-B applications package 1  Provide a good starting point for the ATM application roadmap  More rapid progress on some ATM applications must be made if the timescales for delivery of benefits are to be met  earlier use of spacing en-route  need for firm proposals for introduction of separation

33 Technical Requirements

34 Technical requirements  ATM Application roadmap used to derive a timeline for data link applications  technical requirements to be used to assess technologies in Phase 2 of study  assessment framework developed –ability to meet requirements –costs –industrial impact –stakeholder acceptance

35 Air - ground point to point

36 Air – air point to point

37 Air – ground broadcast

38 Ground - air broadcast

39 Air-air broadcast

40 Current status

41 Current status  Phase 1 complete  Phase 2  technical assessments in progress  technical selection  community measures  production of technology roadmap  Stakeholder workshop – November 2002