EH1 (AD 1&2, IWS, OWS) PMT Jul. 30 – Aug. 20 RollingGain Calibration Summary Zhe Wang (BNL) and Qing He (Princeton) Aug. 22, 2011.

Slides:



Advertisements
Similar presentations
We begin by subtracting noise (run flash lamp without HV) from signal (run flash lamp with HV) In the above for the cathode, we subtract the brown noise.
Advertisements

Uncertainty Analysis Using GEM-SA. GEM-SA course - session 42 Outline Setting up the project Running a simple analysis Exercise More complex analyses.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Positron Asymmetry and Polarization from the E166 September 2005 run Gideon Alexander, Erez Reinherz-Aronis.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
Status of Oxford Setup Matthew Chalk, Erik Devetak, Johan Fopma, Brian Hawes, Ben Jeffery, Nikhil Kundu, Andrei Nomerotski University of Oxford ( 18 August.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
FMS review, Sep FPD/FMS: calibrations and offline reconstruction Measurements of inclusive  0 production Reconstruction algorithm - clustering.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
LightABLE Production Status ID Week October 2014 Tony Weidberg1.
S. White, LBS 17 May Van Der Meer Scans: Preliminary Observations.
1 System Description (2-4) Gains from single photo-electrons in vacuum at room temperature (5-8) Linearity Test at V in vacuum at room temperature.
Tests with JT0623 & JT0947 at Indiana University Nagoya PMT database test results for JT0623 at 3220V: This tube has somewhat higher than usual gain. 5×10.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Analysis of PSI beam test R.Sawada 09/Feb/2004 MEG collaboration R.Sawada 09/Feb/2004 MEG collaboration
Saturation in V-calib LED scans CALICE AHCAL – Main Meeting 2010/07/05 Jaroslav Zalesak analysis still in progress but gives global results FNAL & CERN.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
SN DAQ for IceCube Marc Hellwig Universität Mainz IceCube DAQ Meeting, Berkeley, Expected Signal Time resolution in Simulation Artificial Deadtime.
Multimedia Data Introduction to Image Processing Dr Sandra I. Woolley Electronic, Electrical.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
MPPC Measurements at LSU Brandon Hartfiel LSU Hardware Group Thomas Kutter, Jessica Brinson, Jason Goon, Jinmeng Liu, Jaroslaw Nowak Sam Reid January 2009.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Attenuation measurement with all 4 frozen-in SPATS strings Justin Vandenbroucke Freija Descamps IceCube Collaboration Meeting, Utrecht, Netherlands September.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
Ciro Bigongiari, Salvatore Mangano Results of the optical properties of sea water with the OB system.
The ZDD data structure Each ZDD channel produces a positive “waveform”, one 8-bit sample every 2 ns This waveform is then splitted in “fragments”: a sequence.
KPS Chonbuk University 2005/10/22 HYUNSU LEE Status of the KIMS dark matter search experiment with CsI(Tl) crystals Hyun Su Lee Seoul National.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
PMT Calibration R.Sawada 7/Jan/2007. Time calibration Method was talked at the previous meeting. The problems which was shown before were because I used.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
Ciro Bigongiari, Salvatore Mangano, Results of the optical properties of sea water with the OB system.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
ANL Worksop Impressions The facility is really nice, with office space (Duke has one), printer, video connection, etc… The jamboree format (and the confined.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Jin Huang M.I.T. For Transversity Analysis Meeting Sept 10, JLab.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
OD Tuning: SK-IV Roger Wendell TMC Meeting
PreShower Characterisations
Overview Modern chip designs have multiple IP components with different process, voltage, temperature sensitivities Optimizing mix to different customer.
An Automated calibration method from shower data
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
CLAS12 software workshop
ALiBaVa A brief overlook of Liverpool software changes, common issues and questions. A. Affolder, A. Greenall, I. Tsurin, G. Casse, V. Chmill, M. Wormald,
HPS Collaboration meeting, JLAB, Nov 16, 2016
Alberto A. Colavita, INFN, TS
BESIII EMC electronics
FFT analysis Goal : Energy calibration ( systematic error estimation)
EMCal Recalibration Check
Status report Minjung Kim
Problems with the Run4 Preliminary Phi->KK Analysis
A Switching Observer for Human Perceptual Estimation
A Switching Observer for Human Perceptual Estimation
Imperial laser system and analysis
Slope measurements from test-beam irradiations
Programs for the calibration of TOF measurement with the new pulser
Current status Minjung Kim
Daniel E. Winkowski, Eric I. Knudsen  Neuron 
Stability of Calibration Data
Presentation transcript:

EH1 (AD 1&2, IWS, OWS) PMT Jul. 30 – Aug. 20 RollingGain Calibration Summary Zhe Wang (BNL) and Qing He (Princeton) Aug. 22, 2011

8/22/20112 Several import aspects: 1.Peak cycle selection 2.Robustness improvement 3.Precision improvement 4.Gain drift – Coherent 5.Tdc hit rate - Coherent 6.Comparison with LED 7.Individual gain-running PMTs

8/22/20113 No dark noise component can be identified by PeakCycle. Doc6819 Addition to dark noise selection: [3,8] Other cuts: Doc6714 Peak cycle selection

8/22/20114 Robustness and Precision Very strict fitting result requirement: 1.Root fit ok 2.Chi2/ndf < <Gain<80 && 4.Lower bound<Gain<upper bound 5.Gain Err<10 6.Gain Sigma<Gain 7.sigma>1 && sigma<40 If a fit result can pass all of them, it is a failure.

8/22/20115 Fitting period control: 1.Accumulation Time > threshold (1 hour currently) 2.Average Statistic> threshold (4000 entries currently) ==> This gives about 2.5 hour per fit The statistical error for Gain is less than 1% sigma/sqrt(4000)/Gain = (10/sqrt(4000)/25)

8/22/20116 Multi trials and gauss bailout: 1.Peak Cycle removed half of 40MHz or 80MHz Noise (Doc6819) 2.Full model fit first 2.1 Fitting range auto adjustment 2.2 Lower bound: [0.3Mean, 0.5Mean], 9 trials 3.If full model fails, try gaus fit. 3.1 Fitting range is also adjustable. 3.2 Lower bound: [0.3Mean, 0.5Mean], 9 trials ==> No failure out of a million fits unless a really bad distribution A bad fit by wrong fit range

8/22/20117 Gain drift - coherent Next page, the average gain of four group PMTs from Jul. 29 – Aug. 18 will be shown. You will see some coherent behaviors over all of them. These trends also be found in each ring, each board, even in one channel as long as statistical error is small.

8/22/20118 AD1 bottom 4 rings AD1 top 4 rings AD2 bottom 4 rings AD2 top 4 rings

8/22/20119 AD1 bottom 4 rings AD1 top 4 rings AD2 bottom 4 rings AD2 top 4 rings

8/22/ Compare with one slide from Zeyuan Doc6830, page 13

8/22/ AD1 Gain drift and AD1 temperature: They are manually aligned together to guide the eyes. It is about 0.1 o C -- > 0.1 ADC increase -- > 0.4% in Gain (If ambient temperature is the dominant factor) AD1 bottom 4 rings

8/22/ AD2 bottom 4 rings How about AD2?

8/22/ The maximum variation within one day could be 0.6ADC/26ADC = 2.3% (AD2, Aug 5 – 6) The overall variation is about 1ADC/26ADC = 4% Ambient temperature has some coherent trend. Besides ambient temperature, there must be other factors for the short scale variance (<1day). (HV, FEE, etc.)

8/22/ Tdc hit rate - Coherent I used to call it dark rate. But just call it Tdc hit rate now The value calculated is TDC hit rate in TDC window [1070, 1200] with 40MHz noise removed. Include: Dark rate, Events below trigger threshold, Electronic noise (w/o 40MHz noise) and Ringing. AD 1&2 OWS IWS Study in progress … AD rate >> OWS > IWS A lot noiser in AD. More rock background in OWS. Could be just what we expected. BTW, PMT gain isn’t sensitive to this TDC rate at all.

8/22/ Comparison with LED calibration result Aug 17 1.LED runs -- AD1 run (10:27 am 3 minutes) -- AD2 run (11:03 am 3 minutes) 2.RollingGain processed these runs: (Need a hour to get enough statistic) -- From: Run (10:18 am) -- To: Run (4:31 pm) Taken the sample from the first hour 3.RollingGain output characteristic: Average statistic (1500 entries) Gain error: about 0.4ADC (I guess LED calibration result is around the same range) 4.All the fits used the full model (fit ranges, some initial parameters may not be the same)

8/22/ RollingGain LED Diff in ring and column RG – LED, Mean: Diff in B*16+CDiff in R*16+C

8/22/ RollingGain LED Diff in ring and column RG – LED, Mean: Diff in B*16+CDiff in R*16+C

8/22/ Please check the other reference document 1.AD2_R04_C14 (page 24, pink) 2. AD2_R04_C23 (page 23, cyan) 3. AD2_R07_C17 (page 30, black) 4. AD2_R08_C09 (page 31, black)

8/22/ Summary 1.A lot of studies had been carried out for RG. Improved hit selection, robustness and precision. 2.Coherent gain drift 3.Coherent Tdc hit rate drift 4.Consistent with LED calib result 5.Part of the result was committed to DB. 6.Further development is under discussion.