Cost-Benefit Analysis. 2 Cost Benefit Analysis Identify & evaluate all costs & benefits Discount Assess project(s) by calculating Benefit/Cost Ratio (B/C)

Slides:



Advertisements
Similar presentations
Chapter Outline 6.1 Why Use Net Present Value?
Advertisements

Net Present Value and Other Investment Rules Chapter 5 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 9 - Capital Budgeting Decision Criteria. Capital Budgeting: The process of planning for purchases of long- term assets.  For example: Suppose.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies,
Key Concepts and Skills
Hawawini & VialletChapter 7© 2007 Thomson South-Western Chapter 7 ALTERNATIVES TO THE NET PRESENT VALUE RULE.
© Prentice Hall, Chapter 8 Evaluating Investment Projects Shapiro and Balbirer: Modern Corporate Finance: A Multidisciplinary Approach to Value.
Capital Budgeting Techniques
1 The Basics of Capital Budgeting: Evaluating and Estimating Cash Flows Corporate Finance Dr. A. DeMaskey Should we build this plant?
B280F Introduction to Financial Management
ICS 442 Software Project Management
Chapter 9 Capital Budgeting Techniques. Copyright © 2006 Pearson Addison-Wesley. All rights reserved. 9-2 Learning Goals 1.Understand the role of capital.
Ch9. The Basic of Capital Budgeting Goal: To understand the advantage and disadvantage in different investment analyzing tools Tool: - Net Present Value.
CapitalBudgeting Payback Net present value (NPV)
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
F28SD2 Software Design Monica Farrow EM G30 Material available on Vision Cost/benefit analysis Accounting methods.
Chapter 9 Net Present Value and Other Investment Criteria
McGraw-Hill/Irwin Corporate Finance, 7/e © 2005 The McGraw-Hill Companies, Inc. All Rights Reserved. 6-0 CHAPTER 6 Some Alternative Investment Rules.
CHAPTER 10 The Basics of Capital Budgeting 1. Payback Period 2. Discounted Payback 3. Net Present Value (NPV) 4. Internal Rate of Return (IRR) 5. Modified.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. NPV, Internal Rate of Return (IRR), and the Profitability Index.
Capital Budgeting Last Update Copyright Kenneth M. Chipps Ph.D
Research question To what extent has investment assessment assisted a business to enhance its wealth.
© Harry Campbell & Richard Brown School of Economics The University of Queensland BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets.
1 Chapter 11 The Basics of Capital Budgeting: Evaluating Cash Flows.
NPV and IRR - Using the BAII Plus Professional Calculator NPV and IRR - Using the BAII Plus Professional Calculator Managerial Accounting Prepared by Diane.
Chapter 9. Investment In Long-Term Assets Chapter Objectives Difficulty in finding profitable projects Use capital budget techniques to evaluate new.
CHAPTER 12 THE CAPITAL BUDGETING DECISION Capital Expenditures Decision §CE usually require initial cash outflows in hope of future benefits or cash.
10-1 CHAPTER 10 The Basics of Capital Budgeting Should we build this plant?
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Discounted.
CAPITAL BUDGETING AND CAPITAL BUDGETING TECHNIQUES FOR ENTERPRISE Chapter 5.
FIN 40153: Advanced Corporate Finance EVALUATING AN INVESTMENT OPPORTUNITY (BASED ON RWJ CHAPTER 5)
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
Capital Budgeting Decide how to invest money so that its value is maximized.
Capital Budgeting Chapter 9 © 2003 South-Western/Thomson Learning.
Capital Budgeting Decision Tools 05/17/06. Introduction Capital Budgeting is the process of identifying, evaluating, and implementing a firm’s longer.
Capital Budgeting Decision Rules What real investments should firms make?
PROJECT EVALUATION. Introduction Evaluation  comparing a proposed project with alternatives and deciding whether to proceed with it Normally carried.
Class 4 Benefit Cost Analysis
ALI SALMAN1 LECTURE - 11 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Project Management Lecture 28 Dr. Arshad Zaheer Source: CASE material and online sources.
9 - 1 The financial (monetary) value of any asset (investment) is based on future cash flows. However, the value of a dollar to be received in the future.
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Chapter 4 The Time Value of Money
Capital Budgeting Decide how to invest resources to maximize their contribution to the organization’s objectives.
University of Sunderland CIFM02 Unit 3 COMM02 Project Evaluation Unit 3.
CHAPTER 9 Capital Investment Decision Basics
8- 1 McGraw Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved Chapter 8 Net Present Value and Other Investment Criteria.
Evaluating Financial Investment in IT Projects
Unit 4 – Capital Budgeting Decision Methods
CORNERSTONES of Managerial Accounting 5e. © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
Time Value of Money, Discounted Cash Flow Analysis (NPV) & Internal Rate of Return.
1 Capital-BudgetingTechniques Chapter 9. 2 Capital Budgeting Concepts  Capital Budgeting involves evaluation of (and decision about) projects. Which.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
BNFN 521 INVESTMENT APPRAISAL Lecture Notes Lecture Three.
Chapter 2: The basic theory of interest
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Discounted.
Capital Budgeting Decide how to invest money so that its value is maximized.
Net Present Value and Other Investment Criteria By : Else Fernanda, SE.Ak., M.Sc. ICFI.
Basics of Capital Budgeting. An Overview of Capital Budgeting.
IT Project Management MS Sumayya Ajaz Lecture 9. Programme Management Individual projects as components of a programme within the organization. Programme.
1 Economic Justification. 2 Used to evaluate project alternatives Compare projects Often a hurdle rate (eg. An IRR of > 20%) Variety of measurements:
1 Chapter 5: Essential Formulae in Project Appraisal A Coverage of the Formulae and Symbols Used to Evaluate Investment Projects.
Capital Budgeting 2 Dr. Clive Vlieland-Boddy. Investment Appraisal.
BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets Ch. 3: Decision Rules © Harry Campbell & Richard Brown School of Economics The.
10-1 CHAPTER 10 The Basics of Capital Budgeting What is capital budgeting? Analysis of potential additions to fixed assets. Long-term decisions;
Capital Budgeting Techniques FHU3213
التقييم المالي للمشروع
Capital Budgeting Decision Rules
Presentation transcript:

Cost-Benefit Analysis

2 Cost Benefit Analysis Identify & evaluate all costs & benefits Discount Assess project(s) by calculating Benefit/Cost Ratio (B/C) Net Present Value (NPV) Internal Rate of Return (IRR)

3 Evaluation Identification (what are they?) Evaluation (what are they worth?) Measurement issues: Direct & indirect (i.e. externalities) effects Tangible & intangible effects Pecuniary effects

4 Discounting Policies & projects last a long time Frequently costs & benefits occur at different times Money has a time value, i.e. ceteris paribus, current dollars are more valuable than future dollars Thus, we need to place current & future costs & benefits on an equal basis for comparison

5 Discounting, cont. This is done by “discounting,” that is by reducing future dollars to present value by applying a discount (or a negative interest) rate

Discount Rate v. Interest Rate $100,000 invested at a 3% interest rate today will be worth roughly $115,927 in five years $100,000 in anticipated benefits five years from now is worth roughly $86,260 today, when discounted by 3% 6

The Discount Rate Matters $100,000 in anticipated benefits five years from now is worth roughly $86,260 today, when discounted by 3% $100,000 in anticipated benefits five years from now is worth roughly $78,352 today, when discounted by 5% The difference grows larger as Multiple years are accounted for Benefits accrue further into the future 7

What To Use As A Discount Rate? There are various approaches to selecting one “Givens” (i.e. some authority imposes one) Bank interest rates Rates of return on certain investments (e.g. government bonds) “Social” discount rates 8

9 Net Present Value The difference between total discounted benefits and total discounted costs NPV = (PV B ‑ PV c ) NPV: decision criteria For a single project, a positive NPV indicates acceptability For multiple (competing) projects, the project(s) with the highest NPVs should receive highest priority

10 Benefit/Cost Ratio B/C = (PV B / PV C ) Benefit/Cost ratio: decision criteria For a single project, a B/C ratio which is greater than 1 indicates acceptability For multiple (competing) projects, the project(s) with the highest B/C ratios (greater than 1) should receive highest priority

Internal Rate of Return The discount rate at which the present value of benefits is equal to the present value of costs Internal Rate of Return: decision criteria For a single project, an IRR which is greater than the selected (for B/C and/or NPV analysis) discount rate indicates acceptability For multiple (competing) projects, the one with the largest IRR is the most desirable 11

12 NPV & B/C Comparison NPV measures totals, indicates the amount by which benefits exceed (or do not exceed) costs (total benefit or loss) B/C measures the ratio (or rate) by which benefits do or do not exceed costs (efficiency)

13 NPV & B/C Comparison, cont. They are clearly similar, but not identical With multiple projects, some may do better under NPV analysis, others under B/C

Internal Rate of Return It has a certain attraction, but also has some problems The argument that an IRR which is greater than the selected discount rate is desirable can be questioned - discount rates can be arbitrary! Calculation (by hand) is tedious & prone to error (but modern spreadsheets are a help) Under certain conditions there may be more than one correct solution to an IRR problem 14