1 Southeast Alaska Power Agency SEAPA’s Mission: To provide the lowest wholesale power rate consistent with sound utility planning and business practices.

Slides:



Advertisements
Similar presentations
NWHA 2014 Annual Conference February 20, 2014 Hydro on the Frontier.
Advertisements

ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sacramento Municipal Utility District Slab Creek Small Hydro Project PI: Scott.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
E: Track II Project level analyses Robert Lempert, RAND 1.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
September 2012 Energy Opportunities: Solar, Wind, Energy Efficiency.
Norwegian Water Resources and Energy Directorate
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sacramento Municipal Utility District Iowa Hill Pumped-storage Development PI:
Hydrological Information System Module 20 – Integrated Reservoir Monitoring System.
© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Management Group Water Supply Planning.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
Progress Towards a Regional Coastal Ocean Observing System for the Southeast (SEACOOS) Harvey Seim / University of North Carolina at Chapel Hill University.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
A Preliminary Analysis of the Impacts of Climate Change on the Reliability on West Side Water Supplies Richard Palmer and Margaret Hahn Department of Civil.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
Electricity Supply in Alaska Frank Abegg, PE Fairbanks, Alaska April 2006 Frank Abegg, PE Fairbanks, Alaska April 2006.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Drought and the Central Valley Project August 2014.
Hydroelectric Power
National Hydropower Association Alaska Regional Meeting August 2011, Girdwood, AK Alaska Power & Telephone Presentation on the Yukon River Hydrokinetic.
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
Introduction to Bonneville Power Administration
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
NRCS Watershed Rehabilitation
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
Designing effective national incentive and subsidy schemes in industrial policy (energy and water) Jerson Kelman Brazil Round Table Comparative Analysis.
July Middle Fork Project Additional Information Potential Project Betterments to be evaluated during Relicensing July 2006.
Future of the Columbia River Treaty A British Columbia Perspective 2014 PNWA Summer Conference Coeur d’Alene June 23, 2014 Kathy Eichenberger B.C. Ministry.
Hydrology Days 2004 Applied Stochastic Hydrology Lessons Learned from the Brazilian Electric Energy Crisis of 2001 Jerson Kelman President of ANA (Brazilian.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
2  Large Service Area ◦ Copper Basin and Valdez  Electrically isolated from neighboring utilities  50% Hydro / 50% Fossil Fuels  Current Rates ◦ 18¢/kWh.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
Idaho’s Water Energy Resources and Hydroelectric Potential Douglas G. Hall, Program Manager INL Hydropower Program August 2006.
Fire Island Wind CIRI, through its Fire Island Wind LLC subsidiary, is developing Southcentral Alaska’s first utility-scale wind project Aerial view of.
Middle Fork Project Project Description April 25, 2006.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
HYDRO POWER PLANT
1 The Replanting of Lochaber Hydro Power Station by Andrew Thick.
HYDROPOWER. Objective: The student will be become familiar with the Corps policy for hydropower development. The student will be have a basic understanding.
U.S. Forest Inventory and Analysis Program On the recommendations of the Blue Ribbon Panel on Forest Inventory FIA Progress Update.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
PICAYUNE STRAND RESTORATION PROJECT PUMP STATIONS PRELIMINARY DESIGN South Florida Water Management District Water Resources Advisory Committee April 6,
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
Middle Fork Project Potential Project Betterments October 1, 2007.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
The Lower Mon Project William A. Karaffa, P.E. Project Manager Briefing to Waterways Association of Pittsburgh April 14, 2004.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Micro-hydropower for the home, farm, or ranch: A brief overview
Non-Federal Development at Reclamation Facilities.
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
Senate Resources Committee & House Energy Committee Prepared by Alaska Energy Authority 1 /25/2011.
Erdeneburen HPP Project Implementation Unit
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
EASTERN MUNICIPAL WATER DISTRICT San Jacinto Groundwater Basin Numerical Flow Model Update Brian Powell Director of Planning March 17,
ACEC Annual Convention April 29, 2014 Washington D.C. Lowell Pimley Acting Commissioner RECLAMATION Managing Water in the West U.S. Department of the Interior.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
Paper Presented by At the Zambezi River Basin Stakeholder Conference : 22 – 23 Nov Windhoek, Namibia Eng. S. Z. Mhlanga Senior Manager (Projects.
Warren A. Witt Director of Hydro Operations Ameren Missouri
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
HYDRO ELECTRIC POWER PLANT
Natural Gas Infrastructure Assessment
NC EMC – Water Allocation Committee
SEAPA Board of Directors Meeting Wrangell, Alaska
RELIABLE, & AFFORDABLE ENERGY SOLUTIONS
Presentation transcript:

1 Southeast Alaska Power Agency SEAPA’s Mission: To provide the lowest wholesale power rate consistent with sound utility planning and business practices. We exist for the long-term benefit of our member utilities and the rate payers, providing unified regional leadership for project development and prudent management of our interconnected power system. NWHA 2014 Annual Conference – Seattle, WA Trey Acteson, CEO

Southeast Alaska 2 Regional Profile: Extends 500 miles Metlakatla to Yakutat 35,000 sq. miles Land ownership dominated by Fed 95% Mostly Inventoried Roadless 18,500 miles of shoreline 34 Communities 28 < 1000 people 12 < 100 people S.E. Population 75,000 33k Juneau 20k SEAPA Interconnected Region 9k Sitka

Who is SEAPA? Southeast Alaska Power Agency Regional Generation & Transmission Joint Action Agency SEAPA owns the Tyee and Swan Lake Hydroelectric Projects, providing wholesale power and energy to the Municipalities of Ketchikan, Wrangell and Petersburg SEAPA owns the transmission lines linking those communities together – Approximately 175 miles of transmission, including 14 miles of submarine cable Evolved from the Four Dam Power Pool SEAPA’s hydro projects were originally built by the State in early 1980’s and later purchased Provide bundled services (Scheduling, Planning, Engineering, O&M, Water Mgmt., etc.) Facilitate regional project development

SEAPA Control Area PSG KTN WRG Swan Lake Tyee Lake 25 MVA 130,000 MWh 25 MVA 77,000 MWh SEAPA Generation Meters Load/MWh PSG ,404 WRG ,509 KTN ,932 Totals: 11, ,845 MWh Note: Only 12,000 meters to spread cost of new development Petersburg Wrangell Ketchikan Tyee Swan

Regional Hydrosite Evaluation Purpose: Enhance S. E. Alaska Integrated Resource Plan (SEIRP) Catalog potential hydropower sites Establish desired data set for evaluation Conduct field studies to fill SEIRP gaps Raise base level of knowledge Create ranking criteria/methodology Establish regional database for decision makers 5

Hydrosite Evaluation – Focus Area 6

Challenges Over 60 unique sites Limited funding 1.7 million Remote logistics Weather Safety Balancing confidentiality with mission 7

Project Approach Step 1 - Select project manager (MCM) Step 2 – Define overall objectives (Calibration) – Review Preliminary Assessment (SEIRP) – Perform Gap Analysis Step 3 – Project definition – Data collection objectives Step 4 – Reconnaissance Step 5 – Analysis & Recommendations 8

Status Inspection criteria defined Project library structure created Gap analysis of SEIRP Reconnaissance plan developed Field team deployed to Annette Island in 2013 to evaluate energy and capacity content capabilities of entire island Basin hydrology assessment (inflow prediction) Flood estimation using USGS regression analysis Stream gauge installation at two sites Intake/Impoundment surveys Bathymetric survey (depth) and side band LIDAR (storage) assessment 9

Process Refinement 10 Best to deploy hydro guru on initial recon Cluster “like” sites to minimize costs Cleary define objective for each site Clearly define technical teams and equipment Explore lower-tech data collection options Ensure adequate redundancy Expect delays – Be flexible

Photo Tour Blue Lake – Sitka Whitman Lake – Ketchikan Swan Lake – Near Ketchikan 11

Blue Lake - Sitka 12 Raise dam 83’ New Powerhouse (3) 5.7MW turbines New 1 MW Fish Valve Unit Decommission (4) turbine generators New intake structure and gate house New surge chamber Penstock and tunnel upgrades Additional 34,500 MWH firm energy (27%) Cost: $142M + 15M Diesel Project

More Blue Lake 13

Whitman Lake – Ketchikan (KPU) 14 Dam constructed in ” penstocks 4.6 MW output Supplies hatchery

15 SEAPA’s Swan Lake Dam 174’ High & 430’ long at crest. Reservoir capacity 86,000 acre-feet.

16 Swan Lake Reservoir Expansion Project Cost: $13,391,869 BENEFITS: Displaces up to 800,000 gallons of diesel annually ($2.75 million) Adds 25% more active storage Maximizes use of existing infrastructure Shifts spill to winter generation Compliments other projects Adds operational flexibility Timed with load growth

Swan Lake Status FERC Board of Consultants assembled 30% Design Firm under contract Non-capacity license amendment to be filed in April 2014 Actively pursuing State grant funding Construction 2015/16 17

18 Questions?