Presentation is loading. Please wait.

Presentation is loading. Please wait.

NWHA 2014 Annual Conference February 20, 2014 Hydro on the Frontier.

Similar presentations


Presentation on theme: "NWHA 2014 Annual Conference February 20, 2014 Hydro on the Frontier."— Presentation transcript:

1 NWHA 2014 Annual Conference February 20, 2014 Hydro on the Frontier

2

3

4 WHITMAN HYDRO PROJECT Ketchikan Public Utilities – Ketchikan, Alaska 4.6 MW powerhouse at existing dam

5

6

7 COOPER LAKE HYDRO PROJECT Chugach Electric Association – Kenai Peninsula, Alaska Stetson Creek Diversion Habitat mitigation project

8

9

10 ALLISON CREEK HYDRO PROJECT Copper Valley Electric Association – Valdez, Alaska 6.5 MW

11

12

13 TERROR LAKE HYDRO PROJECT Kodiak Electric Association – Kodiak, Alaska 3 rd Unit Installation

14 LOOKING TO THE FUTURE

15 BLUE LAKE HYDRO PROJECT City of Sitka, Alaska Dam Raise

16 SOIL DRAINAGE MAPS


Download ppt "NWHA 2014 Annual Conference February 20, 2014 Hydro on the Frontier."

Similar presentations


Ads by Google