Subwatershed Outlet (B1 project area) Hydrological Monitoring Institutional strengthening The newly established Tana Basin Organisation have been trained.

Slides:



Advertisements
Similar presentations
Hydrological Services Pty Ltd
Advertisements

City of Edmonton Water Quality Monitoring Locations.
Real-time Data Collection in Flood Warning Systems
Application of the Continuous Slope-Area Method for Determining Stream Discharge and Development of Rating Curves in Ephemeral Channels Navajo Nation Hydroclimate.
Surface Water Chapter 9.
ADRICOSM-EXT PROJECT (ADRIatic sea integrated COastal areaS and river basin Management system pilot project - EXTension) WP2 – INTEGRATED CATCHMENT SIMULATOR.
Nonpoint Source Pollutant Reduction in Tensas River Watershed Using a Vegetated Filter Strip - Retention Pond System Principal Investigator: Beatrix Haggard,
STREAM SEDIMENT SAMPLING
Climate Research in Nepal Himalayas Saraju K. Baidya (Department of Hydrology & Meteorology) “Mountains, witnesses of global changes. Research in the Himalaya.
بسم الله الرحمن الرحيم قال الله تعالى : “ الله الذي خلق السموات والارض وأنزل من السمآء ماء فأخرج به من الثمرات رزقا لكم وسخر لكم الفلك لتجرى في البحر.
DESIGNING MONITORING PROGRAMS TO EVALUATE BMP EFFECTIVENESS Funded by grants from USDA- CSREES, EPA 319, NSF Nancy Mesner - Utah State University, Dept.
WORLD HYDROLOGICAL CYCLE OBSERVING SYSTEM – WHYCOS WORLD METEOROLOGICAL ORGANIZATION – HYDROLOGY AND WATER RESOURCES PROGRAMMEWHYCOS World Hydrological.
FLOODS, STREAMS AND MEANDERS. GAUGING STATION On all major streams Measures Stream Height Height vs. Discharge (volume) Flood Stage and height above Flood.
CARBON and HYDROLOGY (WP2) §The main purpose of the hydrological study is to quantify fluxes/stores of carbon (and nutrients) in water phase as it travels.
Stage – Discharge Rating Numerical relationship between water elevation (stage) and discharge at a location in a flowing system. Expressed as an equation,
 How are the data used  New data collection technologies  New ways to make the data available.
SELF-HELP MONITORING — A WISCONSIN LAKE — Mary Jane Bumby Green Lake Green Lake County Wisconsin.
Brian Haggard Arkansas Water Resources Center UA Division of Agriculture Arkansas Water Resources Center.
8. Sampling and National System for Regional Groundwater Monitoring Jiri Sima.
SRRTTF Synoptic Sampling Event August Sample scoping meeting and site reconnaissance on July , 2014 Scope revised to include vessel use,
By Siberian Tigers. How and where has the removal of the dam physically effected the structure of the Elwha river?
HydrometJanuary AMS Short Course on Instrumentation1 HydrometeorologicalMeasurements Melanie A. Wetzel Desert Research Institute University of.
Integrated Rainwater Management Strategies: Hydrology and Hydrological Modeling Birhanu Zemadim, Matthew McCartney, Bharat Sharma and Seleshi Bekele CPWF.
Watershed Monitoring and Evaluation (WME) component of the Tana Beles Integrated Water Resources Development Project (TBIWRMP) in Ethiopia Hydrological.
Sediment transport in wadi systems
Forest harvesting practices are a suite of BMPs that minimize the environmental impacts of road building, log removal, site preparation and forest management.
Hydrological Monitoring– Status June 2012 Mikaela Kruskopf, TBIWRDP WME, BoARD.
SRRTTF Synoptic Sampling Event August Sample scoping meeting and site reconnaissance on July , 2014 Scope revised to include vessel use,
Workshop on DEVELOPING REGIONAL COOPERATION FOR SHARED KARST AQUIFER MANAGEMENT IN SEE June 2008 Thessaloniki, Greece Monitoring data and existing.
Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.
Information Sharing and Riparian Discussions Almaty, Kazakhstan May 17-19, Assessment Studies for the Proposed Rogun Hydropower and Regional Reservoir.
® The sampled feature of hydrologic observation Hydrology Domain Working Group at the OGC/TC Meeting, Austin, 2012, Mar Irina Dornblut, Global Runoff.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Nicole Reid, Jane Herbert, and Dean Baas MSU Extension Land & Water Program W. K. Kellogg Biological Station Transparency tube as a surrogate for turbidity,
14/10/2015European Agency for Reconstruction1 Water & environment.
Hydrological Monitoring Microwatershed Monitoring Subwatershed Monitoring as part of overall hydrological network Lower Gumara Fogeda River Enkulal Outlet.
Basic Hydrology Water Quality: Sediment production and transport.
Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.
Roxanne Johnson Extension Water Quality Associate February 24, 2009 Tile Drainage Forum NDSU.
Bedload-transport measurements with geophones
Rebecca Schneider, Nancy Trautmann, & Linda Wagenet Cornell University Roadside Ditches: A Watershed Curriculum Module.
1 HYDROLOGY OF TIBET,CHINA 合作 求实 质量 创 新 Hydrology of Tibet, China  Hydrology administration in Tibet is undertaken in both central and local levels. There.
TRANCAT Fifth Framework Programme ENERGY, ENVIRONMENT AND SUSTAINABLE DEVELOPMENT 2nd - 3rd October 2003: SECOND TRANSCAT MEETING ARPAL Regional.
Cache River Monitoring Jennifer L. Bouldin, PhD Ecotoxicology Research Facility Arkansas State University.
FLOOD MANAGEMENT By: Joyce Mathole Directorate: Hydrological Service Department of Water Affairs and Forestry.
Price Creek Watershed Project A joint project of the Iowa & Benton County Soil and Water Conservation Districts IOWATER Meeting – November 13, 2007.
U.S. Department of the Interior U.S. Geological Survey Bee Lake Water Quality Monitor Data Summary Period of record: to 2/19/07.
Report number: Project Cost: $32,922 Project Duration: 12 months
Central Water and Power Research Station Pune
OPERATIONAL PROGRAMME ENVIRONMENT EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia,
M INISTRY OF WATER AND ENERGY M ODELING E XPERIENCE N OV, 2012.
Hydrological Monitoring of TBIWRDP programme watersheds Anteneh Kibret, TBIWRDP, BoWRD.
CWC project: next stop Tbilisi Francesca Bernardini United Nations Economic Commission for Europe.
International Workshop on Flash Flood Forecasting – Costa Rica March 2006 WORLD METEOROLOGICAL ORGANIZATION Weather, Climate and Water INTERNATIONAL WORKSHOP.
Analysis of Sediment Yield from Unpaved Roads. Phase I: Unpaved Roads Inventory Field Data Collection  subwatershed scale  ~90 miles of roads  diversity.
Annual Network Meeting:2004 Male Declaration of on Control and Prevention of Air Pollution And Its Likely Transboundary Effects for South Asia Project.
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
Water Quality Effectiveness Evaluation (2015) The WQEE protocol has been implemented in DSS since Staff have now collected data from 161 sample sites,
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Think about answering the questions: Who? What? Where? When? Why? How? Before your volunteers begin collecting data.
National Hydrology Project Framework for Monitoring and Evaluation (M&E)
Case Lamong River Flood Problem Form (A): Inundation (a) Cause (B): Direct rainfall (a) Flood discharge from upstream runoff (b) Duration (C): Rapid on-set.
Storm Water Management Plan Lawrence County, PA Katelyn Zollos CE 549.
1 Hydrological Regime of the Mekong River Hydrological Regime of the Mekong basin depends on climatic conditions of the wet and dry seasons. High water.
Department of Meteorology Maldives Implementation of Male’ Declaration on Control and Prevention of Air Pollution and its Likely Transboundary Effects.
Hydrological Information System
Floods and Flood Routing
Hydrotechnical Design Guidelines for Stream Crossings
Gabriel Mannah Kpaka Deputy Director General/Head of Operations
Presentation transcript:

Subwatershed Outlet (B1 project area) Hydrological Monitoring Institutional strengthening The newly established Tana Basin Organisation have been trained and equipped to carry out the monitoring programme. The institution will be crucial in future water resource management of the Tana Lake.

Subwatershed stations Two stations establisehd in 2012 – Baskura and Enkulal Note width of channel and height of peak flood – cableway required

Parameters recorded in 2012: Rainfall, Secchi turbidity, Stage level and >250 sediment concentration samples collected by November 2012

Subwatershed stations

JuneJulyAugustSeptember Secchi Baskura Secchi Enkulal Rain Baskura Rain Enkulal

Road Construction – Status 1.Baskura: Monitoring started June 2012, Road design completed, 3.5 km  PRIORITY! 2.Enkulal: Monitoring started June 2012, Road design completed, 4.5 km  PRIORITY! 3.Jema: Road design completed, construction started by Woreda – reconsider need for hydrological station!

Jema Outlet Wide river Unstable banks Frequent overflow  Not suitable site for hydrological station

Alternative site further downstream

Road Construction – Status 1.Baskura: Monitoring started June 2012, Road design completed, 3.5 km  PRIORITY! 2.Enkulal: Monitoring started June 2012, Road design completed, 4.5 km  PRIORITY! 3.Jema: Road design completed, construction started by Woreda – reconsider need for hydrological station! 4.Zefie: Federal Road construction plan, additionally 1.6 km required. Part of A1 hydrological network recommendation  PRIORITY! 5.Kentay: BDU/Ghent established station in 2012 – data sharing. Long road (8.1 km) would be required, not priority.

LOCATION OF SUBWATERSHED OUTLETS AND IDENTIFIED SITES

Equipment procured 1Saba double drum winch5 2Connection cable price5m Long 3Track cable 200m1 4Track cable 3000m6mm 5Crane1 6Drawing winch single1 7Single counter C Accessories6 8Suspended Sediment Sampler cable Tripod Single 11Drawing Over1 12Crane trolley5 13Roller Protection5 14Track cable fixing5 15Cable Pulley for Suspension5 16Track cable5 17Accessories for cable1 18Personal computer for field2

Way Forward Installation of staff gauges at Zefie Outlet (Feb 2012) Dialogue with BDU on Kentay outlet (site established in 2012 – data sharing to be ensured) Dialogue with B1 component on road constrution at Jema Outet – considering relocating station to more suitable location Installation of cableways when possible (extension phase)