10 July 20021 Yohkoh Galileo: To Infinity! … and Beyond! Lockheed Martin’s Role in the Yohkoh Galileo Project 10 July 2002.

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

MOST - Moving Object Search Tool for NEOWISE and IRSA Kevin Yau 6/11/2010.
The Non-Flare Temperature and Emission Measure Observed by RHESSI J.McTiernan (SSL/UCB) J.Klimchuk (NRL)
RHESSI/GOES Observations of the Non-flaring Sun from 2002 to J. McTiernan SSL/UCB.
Important Work for Today Definition of HXT data archive Definition of WBS data archive Assign responsibilities and agree SCHEDULE Discuss new or improved.
HAWCPol / SuperHAWC Software & Operations J. Dotson July 28, 2007.
Coronal Boundaries of Active Regions Derived From Soft X-ray Images.
White-Light Flares and HESSI Prospects H. S. Hudson (UCB and SPRC) March 8, 2002.
Chapter 3: System design. System design Creating system components Three primary components – designing data structure and content – create software –
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
The Yohkoh Galileo Project --- International Coordination Meeting Nobeyama, Japan July 2002.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
May 15, 2013 Space Weather Product Team (SWPT) Making Sense of the Nonsensical.
Release & Deployment ITIL Version 3
Data Processing and User Software Ken Ebisawa (Astro-E2 GOF) presentation and demonstration.
05 December, 2002HDF & HDF-EOS Workshop VI1 SEEDS Standards Process Richard Ullman SEEDS Standards Formulation Team Lead
September 23-24, 2014Dawn Conway, AMSR-E / AMSR2 TLSCF Lead Software Engineer AMSR-E / AMSR2 Team Lead Science Computing Facility TLSCF at UAH Dr. Roy.
1SAS 03/ GSFC/SATC- NSWC-DD System and Software Reliability Dolores R. Wallace SRS Technologies Software Assurance Technology Center
DCS Overview MCS/DCS Technical Interchange Meeting August, 2000.
“Joint planning” session Preliminary instrument operation & science plans of SOT/XRT/EIS for several months after the launch. Instrument checkout and Performance.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
1 STScI Pipeline Thermal-vacuum data handling I. Neill Reid for WFC3 Instrument CALibration team ICAL.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
Simulation of stereoscopic EUVI image pairs Markus J. Aschwanden David Alexander Nariaki Nitta Thomas Metcalf Richard Nightingale James Lemen (LMSAL) 2nd.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Using potential field extrapolations of active region magnetic fields, observed by SOHO/MDI, as a representation of a real active region, we apply hydrostatic.
April , 2006 HEASARC Users Group Steve Drake RXTE Archive at HEASARC Status and Plans Steve Drake.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
Label Design Tool Management Council F2F Washington, D.C. November 29-30, 2006
This dataset contains calibrated, to 4.8-micron spectral images of comet 103/P Hartley 2 acquired by the High Resolution Infrared Spectrometer (HRII)
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
Source catalog generation Aim: Build the LAT source catalog (1, 3, 5 years) Jean Ballet, CEA SaclayGSFC, 29 June 2005 Four main functions: Find unknown.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Regional Seminar on Promotion and Utilization of Census Results and on the Revision on the United Nations Principles and Recommendations for Population.
Data Standards Development August 29, Topics 1.Current Status 2.What was delivered for Build 2c 3.How was IPDA supported 4.What mission support.
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
Worldwide Protein Data Bank Common D&A Project Sequence Processing Modular Demo May 6, 2010 Project Deliverable.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
1 Transiting Exoplanet Survey Satellite Daryl Swade Archive Team Meeting June 16, 2014.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Expert Group Meeting on the Revision of the Handbook on the Management of Population and Housing Censuses New York, 14 – 17 December 2015 Overview of the.
More Information Working Group Composition End Users Data Modelers Data Analysts Airborne Measurement Scientists Airborne Instrument Scientists Data Management.
16-17 September 2015 Dawn Conway, AMSR-E / AMSR2 TLSCF Lead Software Engineer AMSR-E / AMSR2 Team Lead Science Computing Facility TLSCF at UAH Dr. Roy.
Implementation Review1 Archive Ingest Redesign March 14, 2003.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
March 2004 At A Glance ITPS is a flexible and complete trending and plotting solution which provides user access to an entire mission full-resolution spacecraft.
HIFI Tutorial 1: Running the HIFI Pipelines and Adaptations A.P.Marston ESAC 27 June 2013.
1 Notes about eis_prep Alessandro Gardini University of Oslo Oslo, July 9th, 2009.
XRT SOT Alignment DeLuca With comments from Tarbell & Metcalf 21-Jan-2006.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Solar X-ray Imager (SXI) Current and Future Requirements 22 May 2001 Steve Hill Solar Causes and Effects... Operational Requirements Improvements for GOES-R+
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
Professional Growth and Effectiveness System Update Kentucky Board of Education August 8,
1 MURI:NADIR Progress on Area 6 solar features forecast October 2010.
International Data Centre October 2015Page 1 Progressive Commissioning Jerry Carter, Senior Scientist W. Randy Bell, Director Gerhard Graham, Coordinator.
Source catalog generation Aim: Build the LAT source catalog (1, 3, 5 years) Jean Ballet, CEA SaclaySLAC, 23 May 2005 Four main functions: Find unknown.
14 th CAA Cross-calibration Workshop CIS archiving activities York October 5-7, 2011.
Gustaaf van Moorsel September 9, 2003
PMP – PN sub 23nm Route to transfer from ‘in case of urgent need’ into planned delivery into regulations PMP-48 Presentation from Technical Secretary.
Instrument Overview Larry Springer HMI Program Manager
N. Nitta1, J.-P. Wuelser1, J. Lemen1, M. Aschwanden1, G. Attrill2
Presentation transcript:

10 July Yohkoh Galileo: To Infinity! … and Beyond! Lockheed Martin’s Role in the Yohkoh Galileo Project 10 July 2002

2 Introduction Purpose of the Yohkoh Galileo Project: “The Yohkoh Galileo project will complete higher-level data preparations and will archive the required calibration and technical information necessary for the extended use of the archive by scientists now and in the future.”

10 July Lockheed Martin Tasks Production of Level 0 data products –Retains original Yohkoh (Mons Morrison) format –Final delivery to SDAC (GSFC) Publication of Level 1 data products Publication of Level 2 data products Publication of additional (Level 2+) products Production of final calibration data products

10 July Definition of Data Products Level 0 Data (original format) Level 1 Data: –FITS format - Maintain compatibility with latest FITS header definitions –FFI set - Uncompressed, despiked, dark subtracted, leak subtracted (but not spatially coaligned) –PFI (OR) set - Uncompressed, despiked, dark subtracted, leak subtracted and assembled

10 July Definition of Data Products (continued) Level 2 Data (SXT): –Desaturated (composited) –SSC (SXT Science Composite set): Uncompressed –SSS (Full disk movie version) Replaces SFDs Logarithmic compression and intensity normalized Coaligned

10 July Definition of Data Products (continued) Level 2+ Data (SXT): –Descattering of SSC and SSS sets –Synoptic maps, coronal hole maps, active region catalog, flare catalog –Mission light curve data

10 July Notes on FITS Definition Final generation of FITS format Format to be compatible with all standard fits headers available at that time (e.g., include observer position information) –Header content under review –Separate revision control for format and content –Files will contain only one solar image per file

10 July Notes on FITS Content Content definition of the SXT FITS header: –Will be led by Freeland with input from others. –Expect first draft of header to be released August 1. –Comments will be solicited. We strongly urge the other instrument teams to adopt a similar standard. –Expect the final version of the header to be released October 1.

10 July Notes on FITS Definition Open issues concerning FITS definition: –Make use of binary extensions features or avoid? –How to include history information? (Probably standardize a format using the comment field) –How to handle uncertainties Separate archives or files (provides format longevity)? or Two images per file (minimizes overhead)?

10 July Notes on FITS Definition Data format and content should be compatible with VSO/EGSO standards SXT calibration data and certain generic data (e.g., ATT, FEM, etc) will be archived in FITS format

10 July Status of Level 0 Tasks Delivery of reformatted raw data (Level 0) to the SDAC: –On schedule for completion by July 31, 2002.

10 July Status of Level 1 Tasks: Leak subtraction software: –This is the major open calibration task. –Current algorithm (Metcalf/Acton) uses a two step correction procedure: Subtraction of interpolated leak images Removal of any residual component that remains correlated with the interpolated leak image.

10 July Status of Level 1 Tasks: Leak subtraction algorithms (continued ): –Leak subtraction is handled separately for each ‘epoch’ of the mission (each epoch is defined to be the period between two successive SXT entrance filter failures) –Within each epoch there must be a sufficient set of valid terminator (leak) images for leak image interpolation –Currently, there are two short (~2 month) epoches in 1999 for which leak image sampling was insufficient to allow leak image interpolation. The leak image algorithms for these periods have yet to be developed.

10 July Status of Level 2 Tasks: Software is ready Major outstanding task is ATT finalization

10 July Status of Level 2+ Tasks: Descatter - MSU Synoptic map - Slater –75% complete; expect 100% by 1 Oct 2002 Catalogs - In progress

10 July Status of Calibration Tasks: Final calibration tasks: –Dark Subtraction algorithms: Completed. –Composite image generation techniques: Completed (three exposure composites now incorporated). SSC/SSS generation pipeline: –In place and in use. –Currently implementing distributed processing (GLOBUS) on ISAS and LMSAL computers.

10 July SXT data production pipeline Data products beyond level 0 are in some cases interdependent. However, some of the calibration products (ATT, leak subtraction) are currently open-ended. Therefore, it is important to have data ‘pipelines’ set up for regenerating various data products multiple times over the course of the Galileo project

10 July SXT data production pipeline We propose to establish a ‘cycling’ queue for each data product (e.g., SSC set) which will run automatically as updates to software or calibration sets become available In this way we can be assured that when the project nears completion we will not be caught without adequate to complete all data products

10 July SXT data production pipeline As part of the pipeline, we are devloping a GLOBUS system on the ISAS/LMSAL/MSU? Computers, to decrease the turn around times for data product versions

10 July Additional Lockheed tasks Update SXT emissivity software to incorporate new abundance and ionization data (with application to SXT temperature and emission measure calculations: sxt_teem) GOES-12 SXI /SXT cross calibration Yohkoh scientific campaign catalog Improvement of user interface to SXT data (including full mission ‘events’ access)

10 July Additional Lockheed tasks Improvement of ATT (spacecraft pointing) database SXT uncertainties –Generate for FFI –Seek to preserve photon statistics through the calibration process Radiation Belt Monitor (RBM) Level-1 generation Combined SXT/HXT/BCS flare catalog

10 July Timeline Level 0complete by 31-Jul-02 Level 1ongoing Level 2ongoing Level 2+ongoing

10 July LMSAL team: Primary –S. Freeland, T. Metcalf, N. Nitta, G. Slater Supporting –D. Alexander, M. Aschwanden, F. Friedlaender, J. Lemen, P. Shirts Transitional –J. Bartus, H. Hudson, A. Takeda