The State Water Project, Unauthorized Encroachments and the California Water Code State of California Department of Water Resources Division of Operation.

Slides:



Advertisements
Similar presentations
Barhale Procedure for Site Establishment
Advertisements

East Carolina University Compressed Gas Safety Training Program
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
“Fires in improperly secured vacant or abandoned buildings are a constant threat to firefighters, citizens and private property alike. We believe that.
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
Texas County’s Authority for Nuisance Abatement Chapter 343, Texas Health and Safety Code.
One the things we found most troubling about the City’s Draft Environmental Impact Report (DEIR) was that there was no information included about your.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
CODE ENFORCEMENT DIVISION.  PURPOSE OF NUISANCE ORDINANCE:  It is the purpose of the nuisance ordinance to establish means whereby the City may remove.
Grinder pumps are selected, instead of gravity sewers, when you need more freedom to run sewer up hills, through isolated flat lands, or in areas with.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Notices of Violation, Orders to Cease Operation and Consent Orders.
WHO’S IN CHARGE? 70,000 MILES OF PROPOSED PIPELINES IN OHIO? AN INFORMATION SESSION Pipeline Impact on Ohio Landowners Michael M. Hollingsworth, Attorney.
Deborah Gore Division of Water Resources. G.S C (a1) Report Discharge of Untreated Wastewater to the Department Permit issued under this Part.
Conflict Management & Acequia Enforcement
The North Carolina Dam Safety Program. Our Responsibilities Administration and enforcement of the Dam Safety Law of 1967 and the supplementary Administrative.
Acquisition of partial interest EASEMENTS. Does USPAP require a definition of the rights being appraised? Std Rule 1-2(e) Identify the characteristics.
SUTTER BUTTE FLOOD CONTROL AGENCY Supplemental Presentation on Variances and Encroachments Feather River West Levee Project Project Area C May 24, 2013.
EVOLUTION OF SPACING AND POOLING IN COLORADO Denver Association of Division Order Analysts July 21, 2014 Denver, Colorado Steve Sullivan Welborn Sullivan.
Dave Samson CA Department of Water Resources Northwest Hydroelectric Association 2011 Annual Conference "Avoiding a Dam Midlife Crisis" THE CALIFORNIA.
Laboratory Accumulation of Hazardous Waste Presented By: Richard Smith Environmental Health & Safety Administrative Office Research and Extension Centers.
SEPTIC SYSTEMS AND WELLS IN SOLANO COUNTY Solano County Environmental Health Division 601 Texas Street, Fairfield CA (707)
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
Drought and the Central Valley Project August 2014.
Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
NRCS NRCS Watershed Program In Texas. Water Resources AuthoritiesAuthorities Project ActivitiesProject Activities RehabilitationRehabilitation FundingFunding.
California Geology - 4 California Water Project California has several major rivers, canals, and aqueducts.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Cedar Valley/ Northern Utah Valley July 9, Agenda   Background   Groundwater Hydrology   Current Conditions   Water Rights   Proposed.
Legal and Illegal Examples: Unified Development Code (C) Temporary Signs.
1 HOOVER SLOVACEK LLP 5051 WESTHEIMER, SUITE 1200 HOUSTON, TEXAS (713) Fax (713) DUDE WHERE’S MY CAR? CLE.
INFORMATIONAL MEETING AGGREGATE OPERATION PROPOSAL Add picture.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
Kern County Water Agency – Know & Tell Josh, Jason, & Juy.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
MS Dam Safety Program Dusty Myers, P.E. Chief, Dam Safety Division.
The Pipeline Safety Trust “Restoring Trust In Pipeline Safety” New Orleans, LA November 2-3, 2006 Nate Muehl Damage Prevention & ROW Relations Manager.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
MISSOULA SCHOOL ZONE SPEED LIMITS PUBLIC WORKS COMMITTEE NOVEMBER, 9, 2011.
Houston Area: Baltimore (81) Baltimore (81) Boston (48) Boston (48) Pittsburgh (56) Pittsburgh (56) San Francisco (47) San Francisco (47) Denver (153)
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
DRAINAGE PRESENTATION City of Fair Oaks Ranch. Use of Public Funds Tex. Const. art. III, § 52 Places a restriction on the power of the Legislature to.
NAPA COUNTY Conservation Development and Planning Department Code Compliance Flow Chart Building Code Violations 1 COMPLAINT Written complaint (form, letter,
Local Development (San Diego)  Development Services is responsible for managing the majority of the construction and development project review services.
At approximately four (4) square miles in size, Lake Hopatcong is the largest freshwater body in New Jersey.
DIVISION OF MOTORIST SERVICES BUREAU OF DEALER SERVICES
Wyoming Statutes §§ through
Feather River West Levee Project Project Area C May 24, 2013
NORTH TRUNK SEWER REPLACEMENT PROJECT
NORTH TRUNK SEWER REPLACEMENT PROJECT
Land Use and Zoning Committee Special Workshop
East Carolina University Compressed Gas Safety Training Program
NQLA 2018 Rural Roundup.
State Water Project 34 storage facilities, reservoirs and lakes
Antelope Valley-East Kern Water Agency
Urban Water Institute 24th Annual Conference Oroville Dam
Presentation transcript:

The State Water Project, Unauthorized Encroachments and the California Water Code State of California Department of Water Resources Division of Operation and Maintenance Maria Chin

The State Water Project  Planned, designed, built, operated and maintained by the California Department of Water Resources, the SWP is the largest state-built multipurpose water project in the U.S.  It is a water delivery system of 30 storage facilities, 20 pumping plants, 3 pumping-generating plants, 6 hydroelectric power plants, and approximately 700 miles of canals and pipelines.

SWP Facilities in the North Bay Area The North Bay Aqueduct  The underground pipeline extends approximately 27.6 miles from Barker Slough in the Delta to the Napa Turnout Reservoir.  This pipeline provides supplemental water supplies to Napa and Solano Counties.  Some of the communities served are Fairfield, Suisun City, Vacaville, Benicia, Vallejo, and the City of Napa.

Unauthorized Encroachments and Unlawful Acts  Unauthorized Encroachment: Any alteration, improvement, encroachment, or excavation performed within the State Water Project without prior written permission from the Department of Water Resources. Persons doing so can be found guilty of a misdemeanor.  Unlawful acts: No person may drain water; obstruct any natural watercourse; or store or distribute water for any purpose which interferes with or causes damage to the State Water Project or its operation.

Trees – prevent full access to SWP facilities and tree roots damage pipelines and casing

Roots in Pipe Bedding

Roots wrapped around the Pipeline

Stockpiled Material - overburden the pipeline

Fences and undersized gates - prevent full access to SWP facilities for security and maintenance purposes

Metal Building – structures prevent full access to SWP facilities for security and maintenance purposes, and are a threat to the public safety

School playground, cyclone fence, brick wall- inhibits maintenance and repair of SWP pipeline and is a threat to public safety.

SWP Dewatering Facilities Hydrology studies and design plans for proposed projects adjacent to the SWP should address all drainage issues including the potential flows from SWP dewatering facilities. SWP Dewatering Facilities Hydrology studies and design plans for proposed projects adjacent to the SWP should address all drainage issues including the potential flows from SWP dewatering facilities.

SWP Dewatering

Detention Basins adjacent to SWP canal facilities Hydrology studies and design plans for detention basins should address all drainage issues and direct drainage into SWP cross drainage structures when appropriate. Canal Embankment

Right of Way Fence Line Draining water onto SWP right of way damages roads and embankments is not only damaging to SWP facilities, but can also result in damage to adjoining land owners.

A clear right of way zone is an important and necessary component of SWP operation and repair. It reduces the cost of inspection and operation. It reduces the cost of inspection and operation. It allows the unencumbered use of dedicated right of way and access during operations and repairs. It allows the unencumbered use of dedicated right of way and access during operations and repairs. It protects the water quality. It protects the water quality. It provides security to personnel and facilities. It provides security to personnel and facilities. It ensures public safety by allowing the safe operation of facilities. It ensures public safety by allowing the safe operation of facilities.

SWP Pipeline Construction Work Area

Exposed Pipeline for Repair

Mile 55 Liner Repair

Water Code Statutory Authority

Section GENERAL RULE: No person shall make any alteration, improvement, encroachment, or excavation within an SWP right-of-way without written permission from DWR. GENERAL RULE: No person shall make any alteration, improvement, encroachment, or excavation within an SWP right-of-way without written permission from DWR. PENALTY: Any person who violates this section is guilty of a misdemeanor. PENALTY: Any person who violates this section is guilty of a misdemeanor.

Section : UNAUTHORIZED ENCROACHMENTS  GENERAL RULE: If any encroachment exists within DWR’s right-of-way, DWR may require its removal.  Except in cases of emergency, DWR must issue and serve a notice to the owner describing the unauthorized encroachment.

Section : UNAUTHORIZED ENCROACHMENTS If DWR removes any encroachment because the owner fails to comply with the notice for its removal, DWR may recover: If DWR removes any encroachment because the owner fails to comply with the notice for its removal, DWR may recover: The expense of the removal; The expense of the removal; Costs and expenses of suit, including attorneys fees; Costs and expenses of suit, including attorneys fees; $1000 for each day the encroachment remains after the expiration date of the notice. $1000 for each day the encroachment remains after the expiration date of the notice.

Section : UNLAWFUL ACTS Unless allowed authorized by permit or agreement, no person may: Drain water or permit water to be drained onto SWP right-of-way which results in damage to SWP; or Drain water or permit water to be drained onto SWP right-of-way which results in damage to SWP; or Obstruct any natural watercourse in a way that: Obstruct any natural watercourse in a way that: Prevents, impedes, or restricts the natural flow of waters from any portion of DWR’s right-of-way into and through the watercourse or SWP cross drainage structures unless other adequate and proper drainage is provided; Prevents, impedes, or restricts the natural flow of waters from any portion of DWR’s right-of-way into and through the watercourse or SWP cross drainage structures unless other adequate and proper drainage is provided; Causes waters to be impounded that damage SWP; or Causes waters to be impounded that damage SWP; or Causes interference with, or damages or make hazardous operation, maintenance, and rehabilitation of SWP; or Causes interference with, or damages or make hazardous operation, maintenance, and rehabilitation of SWP; or Store or distribute water for any purpose so as to permit the water to overflow onto, causing damage to, or to obstruct or damage SWP. Store or distribute water for any purpose so as to permit the water to overflow onto, causing damage to, or to obstruct or damage SWP.

Section : UNLAWFUL ACTS If the person fails to cease and discontinue the drainage or diversion or to pay for the repairs after receiving notice from DWR: DWR may make repairs and perform work; and DWR may make repairs and perform work; and May sue to recover: May sue to recover: Expenses for repairs Expenses for repairs $1000 each day the problem continued after the notice was served $1000 each day the problem continued after the notice was served Costs of suit and attorneys fees Costs of suit and attorneys fees