Vacuum Vessel Production Readiness Review

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Progress on the Coupling Coil & Focus Coil Interface Engineering
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
-1- ICST/HIT The 23 rd MICE Collaboration Meeting Jan.13 to 17, Harbin/China MICE/MuCool Coupling Magnets Vacuum Vessel Design Guo, Xinglong.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Design of the MICE RF Cavity Module :Status of the module designModule flange sealing options Steve Virostek Lawrence Berkeley National Lab MICE
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
Mechanical Designs of The Central Detector Jinyu Fu
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
56 MHz SRF Cavity and Helium vessel Design
RFQ Subcomponents PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley National Laboratory.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
MICE LH2 Absorber Safety Mary Anne Cummings Edgar Black (IIT) Abingdon, UK Oct. 30, 2003.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
LARP Collaboration Meeting Racetrack Coil Fabrication
Cavity support scheme options Thomas Jones 25/06/15 1.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Adam Carreon July 19, 2012 Technical Division SRF Department Dressed SSR1 Cavities.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
Integration of the Spectrometer Solenoid Magnets
HFM Test Station Main Cryostat
Overview of the RFCC Module and 201-MHz Cavity Design
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
MICE Partial Return Yoke Mechanical Design
MICE Coupling Coil Update
SNS PPU Cryomodule Vacuum Vessel
SNS PPU Cryomodule Space Frame
JLAB CHL 2K COLD BOX REPLACEMENT
Presentation transcript:

Vacuum Vessel Production Readiness Review Muon Ionization Cooling Experiment (MICE) Radio Frequency/Coupling Coil Module (RFCC) Vacuum Vessel Production Readiness Review Allan DeMello Lawrence Berkeley National Lab July 29, 2009

MICE Beamline

Radio Frequency/Coupling Coil Module (RFCC)

RFCC Quarter Section View

Vacuum Vessel Exploded Major Components of the Vacuum Vessel

Overview of Fabrication Procedure Fabricate of vacuum vessel in 3 sections – two 316L stainless steel flanged sections and one 316L stainless steel central sleeve Assemble 3 vacuum vessel sections to the coupling coil (in appropriate fixturing) Verify alignment of all vacuum vessel components Weld all joints and gussets Weld on the vacuum pump manifolds and RF feedthroughs Leak check vacuum vessel

Rolled Cylinder

Fabrication of Vacuum Vessel Flanged Section

Vacuum Vessel to Coupling Coil Gussets Align gussets to coupling coil and tack weld to vacuum vessel Tack weld a stainless steel bar across the gusset pairs to help maintain their position Remove vessel section from the coupling coil and complete the welding of the gussets to the vessel

Final Machining of Vessel Section

Weld on Strut Mounting Posts

Vacuum Vessel Central Sleeve Precision machined central sleeve 5.08mm (0.200 in.) wall thickness 1384.93mm O.D. 1374.77mm I.D.

Assemble Vacuum Vessel and Weld

Weld on Manifold and Feedthroughs Vacuum Vessel and Coupling Coil Assembly

Vacuum Vessel Assembly Fixturing Scheme

Vacuum Vessel Analysis

Vacuum Vessel Analysis Calculate stress for thin walled pressure vessel Analyze vacuum vessel per 2007 ASME Boiler and Pressure Vessel Code VIII, Division 1 ANSYS analysis for vessel with external pressure ANSYS analysis for the 50-ton magnetic load ANSYS analysis for tilting to horizontal position ANSYS analysis for lifting from four points

Thin Walled Cylinder Stress - 0.200 inch

Thin Walled Cylinder Stress - 0.500 inch

ASME Boiler and Pressure Vessel Code Charts used to find Factor A and Factor B which are used in ASME Boiler and Pressure Vessel Code Calculations Outside Diameter ÷ Wall Thickness = Do/t Length ÷ Outside Diameter = L/Do Factor B Factor A Factor A

Minimum Wall Thickness (2007 ASME Boiler and Pressure Vessel Code)

Design Verification – External Pressure (2007 ASME Boiler and Pressure Vessel Code)

Design Verification – Internal Pressure (2007 ASME Boiler and Pressure Vessel Code) A burst disc will be installed on the vessel to avoid the possibility of over-pressure (25psi max)

Design Verification – External Pressure (1/3 Vessel) (2007 ASME Boiler and Pressure Vessel Code)

Design Verification – External Pressure (2007 ASME Boiler and Pressure Vessel Code)

ANSYS Analysis ANSYS Analysis

Vacuum Vessel w/o Coupling Coil

Model of Vacuum Vessel for ANSYS 14.7 psi external pressure applied to stainless steel vessel

ANSYS Results - Equivalent Stress 14.7 psi external pressure applied to stainless steel vessel 1888 psi maximum equivalent (von Mises) stress Maximum allowable stress for 316L stainless steel from ASME Boiler and Pressure Vessel Code is 16,700 psi Weld efficiency of 60% reduces the maximum allowable stress to 10,020 psi With the de-rated welds the maximum stress is 5.3 times less than the maximum allowable stress

Model - Vessel With Gussets Added 14.7 psi external pressure applied to stainless steel vessel

ANSYS Results - Equivalent Stress 14.7 psi external pressure applied to stainless steel vessel with gussets 2041 psi maximum stress Weld efficiency of 60% reduces the maximum allowable stress to 10,020 psi With the de-rated welds the maximum stress is ~5 times less than the maximum allowable stress

Bellows Bridge Bolts Bellows pulled back for module clearance Bridge bolts – exterior view Bridge bolts are needed to transmit the potential 50-ton magnetic force when the magnet quenches 36 - ten millimeter bolts will bridge the RFCC to AFC bellows Bridge bolt – section view

Model – Vessel with Bridge Bolts 36 bolts in flange Stand fixed at base pads Vessel fixed at bolt face 50-ton load applied to coupling coil

50 Ton Magnetic Force -36 Bridge Bolts A 50 ton force is applied to the coupling coil The vacuum vessel has an increased density to simulate the presence of the cavities 36 bridge bolts per side to transfer the load to the rest of the MICE beamline. von Mises max stress of 32,263 psi on bolt cross section Strain hardened 316L stainless steel bolts which have a yield strength of 100,000 psi (minimum) will be used to bridge the bellows

Tilting of Vacuum Vessel The vacuum vessel will be tilted from the vertical (operational) position to the horizontal (shipping) position. It will be tilted back again to the operational position in the U.K. RF cavities are removed for shipping

ANSYS Analysis - Tilting of Vacuum Vessel The vacuum vessel is modeled in ANSYS to simulate hanging from 2 of the pick points. The cavities are assumed to be removed. Ends of vacuum vessel are capped with 0.375 thick aluminum The force of gravity is applied 6867 psi equivalent stress is well below yield stress for 316L stainless steel of 42000 psi

Lifting of RFCC Assembly Anticipating the possibility that the complete RFCC module will be lifted using the 4 pick points provided for tilting the assembly - an ANSYS analysis of the lifted assembly was done

Lifting the RFCC Assembly – ANSYS Results The vacuum vessel is modeled in ANSYS to simulate hanging from the 4 pick points. The cavities are assumed to be in place. Ends of vacuum vessel are capped with 0.375 thick aluminum The force of gravity is applied 10161 psi equivalent stress is well below yield stress for 316L stainless steel of 42000 psi

Summary Because of the tight interface between the O.D. of the vacuum vessel and the I.D. of the coupling coil the vacuum vessel is assembled from three major parts The two flanged section are fabricated in several steps to minimize the distortion of the welding The central sleeve is precision machined to guarantee it will fit into the coupling coil I.D. Analysis verifies the ability of the vacuum vessel to withstand the vacuum loads Strain hardened 316 stainless steel bridge bolts will be needed to transfer the magnetic loads through the bellows joint Tilting and lifting are possible with this design

Thank You

Vacuum Vessel w/o Coupling Coil

Vacuum Vessel – Section View

Total Deformation

Total Deformation

50 Ton Magnetic Force – ANSYS Results

ANSYS Results – Equivalent Stress Support stand only 14.7 psi external pressure applied to stainless steel vessel with gussets Gravity 4150 psi maximum stress

Ends of vacuum vessel are capped with 0.375 thick aluminum

50 Ton Magnetic Force -18 Bridge Bolts A 50 ton force is applied to the coupling coil The vacuum vessel has an increased density to simulate the presence of the cavities 18 bridge bolts per side to transfer the load to the rest of the MICE beamline.

ANSYS Results – Equivalent Stress 14.7 psi external pressure applied to stainless steel vessel with gussets Gravity 4150 psi maximum stress (in the stand)

ANSYS Results – Equivalent Stress Vacuum vessel only 14.7 psi external pressure applied to stainless steel vessel with gussets Gravity 3361 psi maximum stress Weld efficiency of 60% reduces the maximum allowable stress to 10,020 psi With the de-rated welds the maximum stress is ~3 times less than the maximum allowable stress