1 Conclusions Green Buildings. 2 Vancouver Building By-law Building Code Development in Canada 2010 NBC 2012 BCBC BC Variations += 2012 BCBC 2012 VBBL.

Slides:



Advertisements
Similar presentations
Affordable Green Basics and Selected Lessons Learned Christine Bruncati, R.A. New Jersey Institute of Technology Center for Architecture and Building Science.
Advertisements

Green Building Ordinance Transportation and Environment Committee
Sustainability and Energy ServicesSustainability and Energy Services.
Marion Fraser Fraser & Company.  National Code  Provincial Regulation  Municipal Enforcement  Improved codes important but not sufficient  do not.
Manitoba Energy Code for Buildings 2013
ENERGY STAR In the World of Green. ENERGY STAR FOR HOMES GROWTH THE ROAD TO ONE MILLION HOMES Number Labeled Homes Year ,000.
May 27 th 2011 IRC - Codes Report Energy Efficiency in Housing and Small Buildings.
Energy Rating Index Performance Path Speaker Name Speaker Affiliation.
Energy Rating Index Performance Path Speaker Name Speaker Affiliation.
May 7, 2015 CEC IEPR Lead Commissioner Workshop Benchmarking Developing an Energy & Water Efficiency Program for LA’s Existing Buildings.
SAINT PAUL SUSTAINABLE BUILDING POLICY Saint Paul Sustainable Building Policy Training Module Nine Coordination with the Project Processing Flow.
Photo: Jonathan Hillyer, 2009 Sustainable Future for Georgia Georgia Initiative for Community Housing September 16th Columbus, GA.
Planning Department – Building and Safety Adoption of the 2010 California Code of Regulations Presented By: Building and Safety & Fire Prevention.
The Green Building Act of 2006: Transforming the Market DC Department of Housing and Community Development Prepared by the DC Department of Housing and.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Massachusetts “Stretch” Energy Code Marc Breslow Executive Office of Energy & Environmental Affairs.
CATEE CONFERENCE SAN ANTONIO, TX December 18, 2013.
EDMONTON’S GREEN BUILDING PLAN Supporting. 2 Vision Corporate Directional Plans Resource Plans Corporate Outcomes Targets & Measures Programs & Services.
Working Toward a Sustainable Manhattan Beach July 20, 2011 Livable Communities Working Group.
What is 2030 Now? Major vehicle of SIPA’s marketing strategy –Build category brand awareness –Overcome barriers and compel action.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
Energy-Efficient Retrofits for Houses
C A L I F O R N I A E N E R G Y C O M M I S S I O N California Energy Policy: Zero Net Energy Homes in 2020 Martha Brook, P.E. High Performance Buildings.
BSA K-12 Educational Facilities Committee Jack McCarthy Executive Director Steven Grossman Chairman, State Treasurer Massachusetts School Building Authority.
Experiences in carbon accounting for thermal performance improvements in low-income dwelling structures Steve Thorne founder and director SouthSouthNorth.
City Council October 21, 2013 Strategic Planning Retreat Next Steps.
EcoENERGY Retrofit – Homes October 2010 For CHBA - CRC Conrad Baumgartner Office of Energy Efficiency Housing Division Natural Resources Canada.
11 Next Generation R-2000 Standard Presented to: Technical Research Committee February 23 rd, 2011.
2003 National Workshop on State Building Energy Codes Texas Energy Codes: SECO and the Legislature Working Together Felix A. Lopez, P.E. Senior Engineer.
Quantifying the integration of LEED ratings to Military High Performance Sustainable Buildings CATEE 2013 MAJ Autumn Leveridge, U.S. Army CPT Brian Schonefeld,
Planning and Community Development Department Housing Element City Council February 03, 2014.
Building Incentive and Rebate Program Chris Prosser Chief Administrative Officer District of Invermere.
Sustainable Building and Housing
THERMAL BRIDGING. R25 does not equal R20+5ci Why? Thermal bridging! The added R5ci reduces heat loss through both the wall cavity and the framing members.
10. DENSITY  In addition to building design, there are other elements that can impact the passive potential of a site. Density, measured in Vancouver.
1 VBBL and improved envelopes 1&2 Family Homes in Vancouver 2014 VBBL New + Existing Homes Chris Higgins City of Vancouver.
Earth Advantage Institute October 2, 2009 Ann Griffin, Earth Advantage Community Program Manager.
Greg Shinaut Black Hills Energy City of Lincoln – Green Practices Consultant.
Finance and Costing Challenges for Green Buildings in the North
Idaho and Montana Residential Single Family New Construction Measures Mohit Singh-Chhabra Regional Technical Forum October 20 th, 2015.
Marketing Member Benefits, Publications, Discounts.
Energy Analysis The energy model was defined as: EMBODIED ENERGY + OPERATIONAL ENERGY.
Oregon’s ‘Optional’ Reach Code Gabrielle Schiffer State of Oregon Building Codes Division January 10, 2013.
Fire Sprinkler System Presentation By Harold Stewart City Manager November 17, 2014.
NORTHWEST ENERGY EFFICIENCY ALLIANCE Affordable Performance Home Initial thoughts…… November 2011.
Green Communities Grant Program Town of Lincoln March 8, 2010 icfi.com © 2006 ICF International. All rights reserved.
City of Burlingame Housing Element Update Community Workshop # 2 | May 20, 2014.
Green Building Certification Systems for Existing Buildings John Park, PE, CEM, CSDP Dept of Veterans Affairs June, 2009.
ITEM 6.a AT GREEN BUILDING ORDINANCE City Council – August 25, 2009.
New BC Framework for Enhancing Learning Rocky Mountain District Framework for Enhancing Learning.
Overview of the District’s Green Building Program David Epley Green Building and Sustainability Program Manager
Interest Free Energy Efficiency Loan Program Proposal for Improvements August 15, 2016.
Stretch Code for Ayer Spring, Today’s Topics Why Ayer should be a “Green Community” What is the stretch code? Discussion and Q&A 2 Ayer Conservation.
City of San Mateo 2016 Reach Code
Green Building Programs
Building Environmental Systems
East Hampshire District Council Energy Alton
Standard 189.1: A Pathway to Achieving Emissions Reductions Goals
Part 3 Buildings Engagement
Green Building and Sustainable Architecture
Wildfire Development Permit UPdate
Green Building and Sustainable Architecture
Month Day, 2018 Name Title Community.
Mayor’s Task Force On Adoption of 2006 I-Codes
City of Ventura Green Building Standards
Green Building and Sustainable Architecture
The Green Communities Division Partnering with Massachusetts
Brendan McEwen Sustainability Manager
DOER recommendations for BBRS
2019 GREEN BUILDING PROJECT AWARDS:
Presentation transcript:

1 Conclusions Green Buildings

2 Vancouver Building By-law Building Code Development in Canada 2010 NBC 2012 BCBC BC Variations += 2012 BCBC 2012 VBBL Vancouver Variations +=

3 Vancouver Building By-law Development Process Development timeline Model Code Review New Initiatives Public Consultation (Jan-Apr 2012) Council Adoption (Sep 2012) Effective Date (Mar 2013) Consultation Review & Amendment Revisions (May 2012)

4 Vancouver Building By-law Public & Industry Consultation Directly consulting with: APEGBC and AIBC Greater Vancouver Home Builders Association Urban Development Institute COV Seniors Advocacy Group COV Accessibility Advocacy Group Still to come: COV City Management Team Council Workshop

5 Environmental Protection: Large Buildings/ Commercial ASHRAE No envelope upgrades Cost of High-rise = $22K Vancouver Building By-law: Council Directives

6 Environmental Protection: 1 & 2 Family Dwellings “Part 9” Green Homes Program Small Multi-Unit Residential “Part 9” Subset of Green Homes Program Vancouver Building By-law: Council Directives

7 Proposed Changes for Homes Key Updates: Maximum 3.5 ACH High Efficiency heating R22 Effective Walls Attic R50 Energy Star Windows (R4) Water Heating > 82% Electric Vehicle Charging Comfort & Durability

8 Split Insulation R-values: Screws through Insulation List of 5 acceptable wall assemblies: E.g., “Split Insulation” With 1.5” mineral wool

9 “Double Stud”

10 Split Insulation R-values: Screws through Insulation Exterior Insulation R-value added to exterior of sheathing Effective Wall R-value Accounting for Thermal Bridging & Fasteners 2x4 stud 16” o.c. with R-14 batts 2x6 stud 16” o.c. with R-22 batts 1.5” Mineral Wool (R-6) ” XPS (R-7.5) ” Mineral Wool (R- 12) ” XPS (R-12.5) 23.7

11 Resources

12 Principles for Existing Building Policy Progressive upgrade requirements –Rapid paybacks (2-3 years) Gather data –Build database of Energy Utilization Intensities Align renovations to existing programs VBBL– Existing Buildings

13 Permit Applications Construction –Renovations, Additions Non Construction –Change of Use, Occupancy VBBL– Existing Buildings

14 Permit Applications Existing Triggers –Life Safety, Accessibility, Structural New Trigger –Environmental Protection: Disclosure of Energy Use (Portfolio Manager) Energy Assessment (or BOMA Equivalent) Menu of Construction Options VBBL– Existing Buildings

15 Requirements based on type of upgrade VBBL– Existing Buildings

16 Vancouver Building By-law: Next Steps Spring 2012 –Complete Industry & Public Consultations –Finalize By-law language based on consultations Fall 2012 –Internal staff training –Industry workshops (including CP Update Workshop) Spring 2013 –Ongoing training/support to staff and industry during adoption period and beyond

17 Forward Your Comments

18 LEED Rezoning Policy 22,000 Buildings Developed and reviewed by industry 3 rd party Verified

19 6

20 LEED Projects by City SeattlePortlandVancouver (metro) 176 CoV

Pre LEED Policy 35 8 Post LEED Policy 46% Comparison of 18 months pre and post LEED policy Government Private

22 How does it Work? Sustainability Strategy Proof of Registration Proof of Application Submit Energy Model Final Check List RezoningDevelop PermitBuilding PermitOccupancy Permit Occupancy Permit + 6 mos Submit to CaGBC Submit to CaGBC

23 Conclusions Questions?