Comité de pilotage Bordeaux le 15 décembre 2005 Agenda of the INDICANG Steering Committee.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

Project Eco-pedological Map for the Alpine Region SUMMARY 1. The Alpine Convention context 2. Ecopedological map project proposal 3. Preliminary APAT approach.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DG “PROGRAMMING OF THE REGIONAL DEVELOPMENT” OPERATIONAL PROGRAMME “REGIONAL DEVELOPMENT” EVALUATION.
Marine Strategy Framework Directive: Goals and Challenges
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
LEADER -The acronym ‘LEADER' derives from the French words "Liaison Entre Actions de Développement de l'Économique Rurale“ which means, ‘Links between.
Health and Consumers Health and Consumers Identification and traceability of dogs and cats: the current EU legal framework and possible future developments.
Involuntary Resettlement 0P 4.12: Financial Intermediaries and Resettlement Planning Instruments.
The Marine Strategy Framework Directive 17th March 2010, Newcastle North Sea Stakeholders Conference Leo de Vrees European Commission (DG Environment,
Strategic Environmental Assessment and environmental issues in programme evaluation Ivana Capozza Italian Evaluation Units Open Days Roma, July 5, 2006.
Implementation process at EU level Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – submitted to EMECO meeting -
The Eel Regulation and Eel Management Plans Christos THEOPHILOU European Commission Directorate General for Maritime Affairs and Fisheries Unit A2: Common.
Project “Ex-ante evaluation of programming documents and strengthening evaluation capacity for EU funds post-accession” (EUROPAID/130401/D/SER/HR) Project.
VI International Symposium on Trasboundary Waters Management, Thessaloniki, October 2008 The European Union’s Marine Strategy Directive Dr. Angeliki.
INTERREG IVA 2 Mers Seas Zeeën Crossborder Cooperation Programme Part-financed by the European Regional Development Fund (ERDF) Legal framework:
RACS coordination meeting 29 May 2008 Brussels. Review of the functioning of the RACs.
How Are Marine Protected Areas Created? A Guide for the Lay Person.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Guidance notes on the Intevention Logic and on Building a priority axis 27 September 2013.
Regulatory requirements in the current programming period Funchal, 18 November 2010.
Regional Policy Common Strategic Framework The Commission's revised proposal for the CPR - COM (2012) 496 of 11 Sept.
Expert group meeting on draft delegated act on the European code of conduct on partnership (ECCP) under cohesion policy
Regional Policy EU Cohesion Policy 2014 – 2020 Proposals from the European Commission.
EU European Territorial Cooperation Legal Package - State of play Vicente RODRIGUEZ SAEZ, DG Regional Policy, European Commission Deputy Head.
Regional Policy Veronica Gaffey Evaluation Unit DG Regional Policy International Monitoring Conference Budapest 11 th November 2011 Budapest 26 th September2013.
EU management – current situation and future actions Kenneth Patterson European Commission Directorate-General of Fisheries and Maritime Affairs.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
The European SEA Directive Simon Marsden School of International Business, University of South Australia Module 1: Basics of SEA.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
SEA in the Czech Republic Prague, 24 September 2008.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT meeting, 12 December 2005 Barbara Piotrowska, DG REGIO
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Regional Policy EUROPEAN COMMISSION EN The Urban Dimension in Future Cohesion Policy Urban content of the regulations and the Community strategic guidelines.
EU A new configuration of European Territorial Cooperation Vicente RODRIGUEZ SAEZ, DG Regional Policy, European Commission Deputy Head of Unit.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
The Eel Regulation and Eel Management Plans Jean-Claude CUEFF European Commission Directorate General for Maritime Affairs and Fisheries Unit A2: Common.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems Malta, 27 January 2004 Alan Edwards EUROPEAN COMMISSION GMES – Implications.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
Project “Eco-pedological Map for the Alpine Region” APAT- Agency for Environmental Protection and Technical Services Harmonization of Soil Information.
June 2009 Regulation on pesticide statistics Pierre NADIN ESTAT E1- Farms, agro-environment and rural development
EPHA Presentation Healthcare and social services treated equally as estate agents or advertising companies excluded from the Directive or Healthcare and.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
ADE’s 25 th anniversary Economic Governance: Key to Development ? Introduction Bruxelles – Bibliothèque Solvay – 5 October 2015.
Towards a European Shared Environmental Information System in Support of Environmental Policies: INSPIRE: an Inspired revolution for a knowledge-based.
Planning & Community Development Department General Plan Implementation Strategy City Council February 29, 2016.
EU work in the Black Sea Christos Maravelias
The LIFE program 13th Meeting of the Marine Strategy Coordination Group (MSCG), Brussels, 13/05/2014 Dørte PARDO LÓPEZ DG Environment, Unit E.3 European.
Proposal for a Regulation on medical devices and Proposal for a Regulation on in vitro diagnostic medical devices Key Provisions and GIRP Assessment.
EU work in the Black Sea Christos Maravelias
Marine Strategy Framework Directive (MSFD)
EU Thematic Strategy for the Protection and Conservation of the Marine Environment Outline of impact assessment François Wakenhut – European Commission.
Involuntary Resettlement 0P 4.12: Planning Instruments
EMFF Funding opportunities for the environment
Prioritised Action Frameworks for financing Natura 2000
Marine knowledge presentation to eighth meeting of Marine Observation and Data Expert Group presentation to eighth meeting of Marine Observation and.
DG AGRI, Unit F6 Bioenergy, biomass, forestry and climatic changes
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Presentation of the thematic groups
FISHERIES AND ENVIRONMENT
1.- THE PROJECT. NATURA 2000 NETWORK IN SPAIN
The environmental dimension of the EMFF
LIFE and the implementation of the Water Framework Directive
Information on projects
Link between Directive 98/34/EC and Regulation (EC) No 764/2008
Guidelines on the Mid-term Evaluation
Commission proposal for a new LIFE Regulation CGBN meeting
PROVISIONS UNDER THE HABITATS DIRECTIVE RELEVANT TO NEEI
Roles and Responsibilities
Presentation transcript:

Comité de pilotage Bordeaux le 15 décembre 2005 Agenda of the INDICANG Steering Committee

Comité de pilotage Bordeaux le 15 décembre 2005 Reporting first phase Bilan de la première phase (mai 2004 décembre 2005)  The project anticipated the request of Europe and was born from the concern of the actors expressed in the working groups of the CIEM and the CECPI, but also in the national groups (COGEPOMI, GRISAM).  The project took into account the catchment area as management unit while extending its zone of study to a significant part of the surface of colonization of european eel: central part of the surface of geographic distribution.  In a first phase INDICANG drew up the current initial state of the population of eel and its habitats on the 13 catchment areas concerned. However, that does not constitute the pristine state as currently required by the Fish Commission.  This first phase and these states of reference allow to make an inventory of the relevant descriptors in order to characterize the habitat quality of the habitat and the status of the eel ressource in the index catchment areas.This new step is under the responsability of the thematic boxes..

Comité de pilotage Bordeaux le 15 décembre 2005

Budget issue (1/3) Point sur le budget

Comité de pilotage Bordeaux le 15 décembre 2005 Budget issue (2/3) Point sur le budget

Comité de pilotage Bordeaux le 15 décembre 2005 Budget issue (3/3) Point sur le budget

Comité de pilotage Bordeaux le 15 décembre 2005

Eels : Commission proposes seasonal closure of eel fishing until approval of national protection plans  The goal : Member States would set up national plans to ensure that 40% of the level of adult eels which, in the absence of fishing and other effects from human activities, would migrate from the rivers on their territories, escape to the sea to spawn.  These plans, to be in place by July Until such plans are in place, the Commission proposes to ban eel fishing from the 1st to the 15th of every month  Joe Borg « Commissioner for Fisheries and Maritime Affairs », said « Today’s proposal reflects the extensive consultations with stakeholders and the need for a concerted effort to restore the eel stock. The Commission proposes an escapement target but the choice of protection measures rests with the Member States which are the best placed to adapt them to local conditions ».

Comité de pilotage Bordeaux le 15 décembre 2005 Eels Management Plans (1/4)  The principal element of the Regulation is the establishment of national eel management plans, by means of which each Member State will achieve the objective of a 40% escapement of adult silver eel from each river basin (measured with respect to undisturbed conditions)  Short-term measures : Eel survival should be improved as much as possible, compatible with social and economic needs, by imposing fishery closures for 15 days each month. These closures should stay in force until a Member State has implemented an approved Eel Management Plan.  Derogation from short-term measures : Fishing could continue during the closed period if a Member State can reliably demonstrate that existing measures are in conformity with the 40% objective or if the fishing is for glass eel to be used for restocking purposes.

Comité de pilotage Bordeaux le 15 décembre 2005  Subsidiarity and proportionality :The main part of the proposed regulation is cast as an obligation for Member States to achieve a specified target for eel management.The choice of management instruments to use is at the discretion of Member States. The control of the quality and fitness is subject to review by Community institutions.  Budgetary implications : Budgetary implications concerning support for research on eels are considered in the context of the 7th Framework Programme. State aid applicable to fisheries and its applicability to eel fisheries and environmental measures are addressed in the European Fisheries Fund.  Additional elements : Establishment of a traceability system to asist in the fight against poaching. Approprriate management of eel stocks and fisheries requires consideration of both the impact of fisheries and the impact of environmental modifications such as dams, eel passes and hydroelectric installations. The scope and conditions of financial assistance for implementation of these measures are being addressed in the context of the European Fisheries Fund. Eels Management Plans (2/4)

Comité de pilotage Bordeaux le 15 décembre 2005  Establishment of Eel Management Plans : 1. Member States shall identify and define the individual river basins lying within their national territory that, prior to human intervention, constituted natural habitats for the European eel. 2. For each eel river basin, Member States shall prepare an Eel Management Plan. 3. The objective of each Eel Management Plan shall be, for each eel river basin, to permit with high probability the escapement to the sea of at least 40% of the biomass of adult eel relative to the best estimate of the potentialescapement from the river basin in the absence of human activities affecting the fishing area or the stock. 4. Each eel management plan shall include both the means to reach the objective set out and means to monitor and verify the attainment of that objective. Eels Management Plans (3/4)

Comité de pilotage Bordeaux le 15 décembre 2005  Approval of Eel Management Plans 1. Member States shall communicate by 31 December 2006 to the Commission all individual Eel Management Plans. 2. On the basis of a technical and scientific evaluation from the Scientific, Technical and Economic Committe for Fisheries, the eel management plans shall, where appropriate, be approved in accordance with the procedure referred to in Artcile 30(2) of Regulation (EC) N° 2371/ Member States shall implement the Eel Management Plans approved under § 2 from 1 july Each Member State shall communicate a national overview of its proposed Eel Management Plans to all other Member States and to the Commission by 31 December 2006 (now June 2006 probably). Eels Management Plans (4/4)

Comité de pilotage Bordeaux le 15 décembre 2005 INDICANG in that context  Must contribute : 1. to the data collection necessary to evaluate the initial state of the river basin and eel stocks according to a descriptor list. 2. To the definition and elaboration of indices (indicators) allowing to measure the effects of the management plans. 3. To the implementation of a net of dashboards on the pilot river basins of INDICANG in order to demonstrate the technical feasability. 4. To the estimate of the necessary means for personal and budget in order to provide a perennial follow-up into a regional framework.

Comité de pilotage Bordeaux le 15 décembre 2005  The second phase must make it possible to choose the relevant descriptors allowing the follow-up of this ressource (notion of cost - quality) from a perennial manner and to define and to built the indicators (indices) to reach the objective of sustainable development.  Definition of these indicators (indices) and their creation will have to be carried out for the seminar of Oporto in June 2006 and will have to be placed at the disposal of managers which will have to set up the management and restauration plans and their follow-ups from June  The final phase of the project will consist in setting up on the sites referred by INDICANG the dashboards necessary to the follow-up of the eel resources with an estimate of the personal and financial means. Prospects Perspectives (janvier mai 2007)