Current Status of Public Participation in the EIA Process in China Seoul Korea, June 2007 By Zhao Xinfeng Appraisal Center for Environment and Engineering,

Slides:



Advertisements
Similar presentations
PROJECT STUDY AREA Route Selection. Stage 1 Environmental Assessment Guidelines to underpin the effectiveness of the National Roads Project Management.
Advertisements

Identify Problems, Planning Objectives and Constraints.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
1 Strategic Environmental Assessment and SFs Operational Programmes: An assessment Jonathan Parker DG ENV ENVIRONMENT EUROPEAN COMMISSION Aarhus Workshop.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Environmental Impact Assessment
Environmental Impact Statement Process Development Services Department Carol Helland, Land Use Director/SEPA Official (DSD) David Pyle, Senior Land Use.
“Building Effective Public Participation in Environmental Impact Assessment in a Transboundary Context” in Bulgaria Institute for Ecological Modernisation.
Environmental Impact Assessment Myriam Raiche November 8, 2007.
Air Quality and Land Use Planning Land Use Consultants 11 th March 2008 Susanne Underwood.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Job Analysis and Rewards
Topic 6 Environmental Impact Assessments. EIA – Introduction The start Effectiveness?
Chapter 3 Preparing and Evaluating a Research Plan Gay and Airasian
Purpose of the Standards
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Strategic Environmental Assessment and environmental issues in programme evaluation Ivana Capozza Italian Evaluation Units Open Days Roma, July 5, 2006.
Jerzy Jendrośka Introduction to the Environmental Impact Assessment (EIA) and the Strategic Environmental Assessment (SEA) Directives INTERACTION BETWEEN.
Implementing the Second Pillar of the Aarhus Convention: Problems Identified in the National Implementation Reports Magda Tóth Nagy, Senior Expert Geneva,
საქართველოს მწვანეთა მოძრაობა / დედამიწის მეგობრები Greens Movement of Georgia / Friends of the Earth Implementation of Aarhus Convention in Georgia during.
Planning and Delivery of HND Programmes Janet Strain.
What is Necessary to Ensure Natural Justice in EIA Decision-making? Angus Morrison-Saunders Senior Lecturer in Environmental Assessment School of Environmental.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Homework 7 Jukka Hirvonen & Sami Rissanen. Object of homework 7  Object of homework was to familiarize existing written material and participate to structured.
Public participation of EIA in R.O.C. Hsiao-Tien Wu, Wei-Chein Sun & Tung-Wang Chang Environmental Protection Administration Executive Yuan R.O.C.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Developing Plans and Procedures
Workshop Conclusions and Recommendations   To establish a responsibility system for EIA management and enhance the accountability of government officials.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Infrastructure Development Bill [B ] Submission by the Centre for Environmental Rights to Portfolio Committee on Economic Development 14 January.
Environmental Impact Assessment in the Slovak republic.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
Mitigation and Impact management
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES Public Involvement EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
SEA in the Czech Republic Prague, 24 September 2008.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Participation in the Process of Brownfield Regeneration Dagmar Petríková, Matej Jaššo „This project has been funded with support from the European Commission.
1 Performance Auditing ICAS & IRAS Officers NAAA 21 Jan 2016.
ASSESSING PUBLIC PARTICIPATION IN FISCAL POLICY PROPOSED INDICATOR.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Reporting in the EIA process.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
IAIA Conference on international experience & perspectives in SEA, Prague, September 2005 IAIA Conference on international experience & perspectives.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Early public participation In Decision-Making Process Nana Aghlemashvili Chief Specialist of the Legal Department.
Peter Lukáč Ministry of Environment of the Slovak Republic Department of Environmental Assessment.
Jussi helske1 Workshop on the learning of EC approaches and experience in Licensing of New NPP’s Existing in European Union countries procedures.
Good practices and obstacles on implementation of Maastricht recommendations in Belarus 6th meeting of the Task Force on Public Participation in Decision.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
EIA approval process, Management plan and Monitoring
14-16 September 2016, Wrocław, Poland
What is Necessary to Ensure Natural Justice in EIA Decision-making?
National Environmental Policy Act of 1969 (NEPA)
Jerzy Jendrośka Transboundary procedures
Reporting in the EIA process
Relationship between World Bank and Romanian EA requirements
EIA- Concept and Practice
SCREENING SCOPING SEA QUALITY CONTROL DECISION
Public Protector South Africa Deputy Public Protector of South Africa
Presentation transcript:

Current Status of Public Participation in the EIA Process in China Seoul Korea, June 2007 By Zhao Xinfeng Appraisal Center for Environment and Engineering, State Environmental Protection Administration of China

Content  Introduction  Requirements on Public Participation  Current situation  Conclusion

Introduction

Why do?  Legislations related to PP in EIA  Law of Administrative Permission(1995)  EIA Law (2003)  Executive Measures on PP in EIA(2006)  Key element of EIA  Criteria for EIA approval

Who do?  During the process of EIA preparation  Project proponent  EIA consultant  During the process of EIA approval  Environmental authority

Scope of Application  All projects that are subject to the detailed EIA  Project that its EIS needs to reapply for approval due to the change of design  Project that does not start the construction after 5 years of getting the EIA permission, and needs to be re-assessed

Requirements on PP

 Four announcements are required 1 st : within 7days after EIA is launched Preparation Stage Approval Stage 1 st : after EIA application is accepted 2 ed : not less than 10days before EIA is submitted for approval 2 ed : not less than 10days before decision is made

 Non-technical EIA report should be public accessible  Information that should be disclosed :  Name of the project proponent and EIA consultant, as well as their contact information  General Information of the Project  Resource Utilization and Pollution Discharge  Key findings of Impact Prediction and Assessment  Mitigation Measures  Main Conclusions of EIA

 Direct affected public must be consulted  Consultation focuses on environmental issues  Time for collecting public comments should not be less than 10 days  Means of public consultation include  questionnaire  Interview  Public meeting  Public hearing

 Public hearing is required in certain circumstances (not be clearly defined)  Two types of public hearing  Public Comments Hearing (leading body-proponent)  Formal Public Hearing (leading body-environmental authority)

 All comments should be recorded  EIA statement should contain a chapter describing the procedures and outcomes of public participation  The PP chapter should include a summary of the public comments, and indicate the unadopted comments and the reasons of unadoption

Current Situation

Successes  SEPA is the first government sector that issued the legal document specific on PP  Awareness of PP among project proponents and government staff has been enhanced  Information Disclosure has been improved, although not enough  More opportunities for vulnerable peoples to get involved

Constrains  Public awareness on environment is still low in poor areas  Time for public comments is short, especially in EIA approval stage  EIA statement is not fully opened to the public  Social issues is not covered  Consultation with NGOs is not compulsory

Conclusion

 PP in china is still in the preliminary stage  Effective PP needs more legislative supports  Environmental education is essential for mass public, especially poor peoples, to get involved  PP alone can not guarantee the environmental equity

Thank You