International Boundary and Water Commission United States Section Engineering Services Division November 18, 2014 Levee Rehabilitation Projects Lower Rio.

Slides:



Advertisements
Similar presentations
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Advertisements

Presented by: Ronald O. Nichols LADWP General Manager
Levee Decertification & CRS: How a Catch-22 Can Catch You! ASFPM 2011 National Conference Louisville, KY Wednesday, May 17, 2011 ASFPM 2011 National Conference.
Fort Bend Flood Management Association Flood Risk Reduction Symposium October 3rd, 2014 (Part-A) Brazos River at San Felipe - USGS Gage Fort Bend County.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Identifying and Evaluating Levee Improvement Alternatives – The City of West Sacramento Michael J. Vecchio, P.E. Watershed Planning and Design Sacramento,
June 23, 2011 Southwestern Illinois Council of Mayors.
Florida Water Forum Everglades Restoration June 3, 2011.
Fargo Flood Control Southside Flood Protection Prairie View Estates Fargo, ND October 2, 2008.
Presented by Public Works Department Traffic Engineering Division Board of County Commissioners September 9, 2014 Red Light Camera Update.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
Chubaka Producciones Presenta :.
Flood Map Modernization Levee Certification Status in FEMA Region VI USACE Red River Levee Meeting Texarkana, Arkansas SW Arkansas Electric CO-OP January.
October 17, 2011 League of Women Voters of Collinsville.
Welcome Rob Rash CEO/Chief Engineer St
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Oregon Flood Hazard Data Standard v2.0 Summary of Proposed Amendment Collaborative Effort of: Jed Roberts (DOGAMI), Steve Lucker & Christine Shirley (DLCD)
Chicas, este calendario si es pa' nosotras !!!!!.
1. LiDAR Mapping Light Detection and Ranging (LiDAR) mapping provided for the United States International Boundary and Water Commission (USIBWC) – established.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
International Boundary and Water Commission United States and Mexico Presentation to USGS Study Tour April 18, 2007 El Paso, TX.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Central Valley Flood Protection Board Meeting – December 20,
BUILDING STRONG ® Fort Worth District Carolyn Staten USACE-SWF-Fort Worth, Texas Deputy Office of Small Business Programs 5 th Annual Business Conference.
Ventura County Levee Systems Levee Certification Compliance Efforts Presentation to the Ventura County Watershed Protection District Board of Supervisors.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Calendar for 2011 Months of the Year with Holidays.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
Tempe Town Lake Downstream Dam Replacement NEW DAM ALTERNATIVES SELECTION January 5, 2012.
Pre-State Allocation Board Meeting October 26, 2011 Presented By California Department of Education.
Project Subcommittee Subcommittee Purpose/Goals: – Develop a master inventory of flood-related projects in the Chehalis Basin Seven sets of discussions:
1 Delta Risk Management Strategy Delta-Suisun Marsh Branch Department of Water Resources SCWC/SCWD MEETING JUNE 27, 2007.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Stormwater Management
Flood Hazard Area, Flood Insurance and Stormwater Management
CITY OF HALLANDALE BEACH
Safety Department Fire Drills.
Main Street Improvements
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
McDonald’s calendar 2007.
Teacher name August phone: Enter text here.
MONTHS OF THE YEAR January February April March June May July August
McDonald’s calendar 2007.
PLAYMATES LEARNING CENTER CALENDAR
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Habitat Changes and Fish Migration
Sacramento Environmental Commission January 2019.
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

International Boundary and Water Commission United States Section Engineering Services Division November 18, 2014 Levee Rehabilitation Projects Lower Rio Grande Valley

International Boundary and Water Commission Engineering Services Division Submitted LRGV FEMA Review Packages 1. Common Levee 2. Mission Levee Phase I 3. Mission Levee Phase II 4. DHS Levee/Wall Segment O-04A 5. DHS Levee/Wall Segment O-04C 6. DHS Levee/Wall Segment O-05 7.DHS Levee/Wall Segment O-06A 8.DHS Levee/Wall Segment O-06B & C 9.DHS Levee/Wall Segment O-07

International Boundary and Water Commission Engineering Services Division Submitted LRGV FEMA Review Packages 10.DHS Levee/Wall Segment O DHS Levee/Wall Segment O-09 Phase I 12.DHS Levee/Wall Segment O-09 Phase II 13.DHS Levee/Wall Segment O North Banker Floodway Levee 15.Mission Levee Improvements at Bentsen Palm Drive, UID, Penitas RR Crossing 16.Main Floodway 17.North Floodway – Two Structures 172 & North Floodway Phase I

International Boundary and Water Commission Engineering Services Division Submitted LRGV FEMA Review Packages 19. North Floodway Phase II 20. Arroyo Colorado Phase I 21. Arroyo Colorado Phase II 22. Lower Brownsville Levee – (Donna to Brownsville Reach # 5)

International Boundary and Water Commission Engineering Services Division Accredited Levee System - A FEMA accredited levee system is a levee system that meets the requirements of 44CFR65.10 and therefore is shown on the Flood Insurance Rate Map (FIRM) as providing protection from the 1-percent- annual-chance flood. FEMA does not own, operate, maintain, or inspect levee systems or develop certified levee- related data for accreditation purposes. FEMA Accreditation

International Boundary and Water Commission Engineering Services Division As the levee owner, USIBWC will evaluate that the levees have been constructed to required design standards and are operated appropriately. For FEMA to accredit a levee system with 1%-annual- chance flood hazard reduction capability on a FIRM, the levee owner/local project sponsor must submit a package containing the required data and documentation to show that the levee system meets all design and operation requirements of 44CFR FEMA Accreditation

International Boundary and Water Commission Engineering Services Division Interior Drainage - FEMA requires an Interior Drainage Analysis. To date, no analysis exists. USIBWC is only authorized to do work on the levees within USIBWC ROW and does not have authority in assessing the interior drainage issues. Levees need to tie into high ground Levee/Roadway intersections Intake / Drainage Channels Accreditation “Speed Bumps”

International Boundary and Water Commission Engineering Services Division LRGV Construction Projects Under Administrative Close Out 1. Lateral A to Retamal Dike 2. Hidalgo Phase I and II 3.Upper Brownsville Levee - (Donna to Brownsville Reach #4)

International Boundary and Water Commission Engineering Services Division FEMA Packages Submitted - Map

International Boundary and Water Commission Engineering Services Division LRGV FLOOD CONTROL PROJECTS

International Boundary and Water Commission Engineering Services Division Upper Brownsville Levee Improvements- (Donna to Brownsville Reach # 4) Los Indios to San Pedro Levee Improvements– (Donna to Brownsville Reach #3) Santa Maria to Los Indios Levee Improvements- (Donna to Brownsville Reach #2) Progreso Levee Improvements (Donna to Brownsville Reach #1) LRGV CONSTRUCTION PROJECTS

International Boundary and Water Commission Engineering Services Division UPPER BROWNSVILLE LEVEE 12.0 levee miles (from San Pedro to International Blvd in Brownsville) $8.8 million contract to LECON Inc. Notice to Proceed issued June 1, 2013 Completion Date of October 2, % Complete, Project is in Administrative Close Out

International Boundary and Water Commission Engineering Services Division UPPER BROWNSVILLE LEVEE

International Boundary and Water Commission Engineering Services Division LOS INDIOS TO SAN PEDRO LEVEE 11.9 levee miles $11.5 million contract to LECON Inc. Notice to Proceed issued December 26, 2013 Anticipated completion August 28, % Complete

International Boundary and Water Commission Engineering Services Division LOS INDIOS TO SAN PEDRO LEVEE

International Boundary and Water Commission Engineering Services Division SANTA MARIA TO LOS INDIOS LEVEE 11.7 levee miles total $9.6 million contract to EISG Inc. Notice to Proceed issued September 25, Anticipated completion January 23, % Complete

International Boundary and Water Commission Engineering Services Division SANTA MARIA TO LOS INDIOS LEVEE

International Boundary and Water Commission Engineering Services Division PROGRESO LEVEE 6.0 levee miles total (west segment is 2.0 miles; east segment is 4.0 miles) $3.7 million contract to EISG Inc. Notice to Proceed issued July 9, 2014 Anticipated completion August 13, % Complete

International Boundary and Water Commission Engineering Services Division PROGRESO LEVEE

International Boundary and Water Commission Engineering Services Division Arroyo Colorado Levee, Phase 3 North Floodway North & South Levees (Phase 3) North Floodway North & South Levees (Phase 4) Edinburg Pump Levee Rehabilitation LRGV DESIGN PROJECTS

International Boundary and Water Commission Engineering Services Division Arroyo Colorado Phase 3 – Brown Line ARROYO COLORADO PHASE 3 DESIGN Design : 16.1 miles of levee $1.9 million design contract awarded to Tetra Tech Inc. Notice to Proceed issued on March 11, 2010 Design completed Sept Construction will be done in 3 sub phases: 3A to 3C

International Boundary and Water Commission Engineering Services Division North Floodway Phase 3 – Light Blue Line NORTH FLOODWAY PHASE 3 DESIGN Design : 23.5 miles of levee $5.6 million design contract URS Group, Inc. (NF Phases 3 and 4) Notice to Proceed issued on June 16, 2010 Design completed Oct Construction will be done in 4 sub phases: Phases 3A to 3D

International Boundary and Water Commission Engineering Services Division North Floodway Phase 4 – Medium Blue Line NORTH FLOODWAY PHASE 4 DESIGN Design : 29.2 miles of levee $5.6 million design contract URS Group, Inc. (NF Phases 3 and 4) Notice to Proceed issued on June 16, 2010 Design completed Nov Construction will be done in 5 sub phases: Phases 4A to 4E

International Boundary and Water Commission Engineering Services Division Edinburg Pump – Yellow Line EDINBURG PUMP LEVEE REHABILITATION DESIGN Design :.7 miles of levee $400, design contract URS Group, Inc. Notice to Proceed issued on October 1, 2014 Design completion anticipated by June 25, 2015 Construction will be done in 1 phase

International Boundary and Water Commission Engineering Services Division ACCOMPLISHMENTS 262 miles of levee improvements completed 22 certification packages submitted to FEMA Visit to learn more about the Levee Improvement Statuswww.ibwc.gov

International Boundary and Water Commission United States Section Engineering Services Division Construction Projects Inquiries Isela Canava Lead Civil Engineer (915) Jose A. Nuñez Principal Engineer IBWC – US Section Head Quarters (915) FEMA Certification Inquiries Valentin Arzola Civil Engineer (915)