WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.

Slides:



Advertisements
Similar presentations
Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
Advertisements

Weirs and Canal Intakes By: Nell Kolden and Taylor Barnett Thursday April 12, 2012 CIVE 717.
MONKEY RUN, ARCADE, NY. HISTORIC RAILROAD PROTECTION & DEMONSTRATION PROJECT, 41 METHODS AND TECHNIQUES IN COMBINATION.
Rock Riffle Design Course
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.
Irish Gulf, Boston, NY  Vertical eroding banks  Urban  Pool-riffle-pool regime  Gravel-cobble bed stream  Small stream (average width 30 ft, 10 ft.
GRADE CONTROL. STABILIZE HEADCUTS FIRST, THEN WORRY ABOUT BANK INSTABILITY SECOND.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
LONGITUDINAL PEAKED STONE TOE PROTECTION {LPSTP}
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
TRADITIONAL WINDROW & TRENCH-FILL REVETMENTS, & A NEW INVENTION, VEGETATED TRENCH-FILL REVETMENT {All 3 are classified as “Setback Revetments”}
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
GOODWIN MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
How Do You Choose A Bank Protection Method? A delicate balance is required, as demonstrated here by Roundman Chosen method (or combination of methods)
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
STONES DRILLED & PINNED TO BEDROCK WITH METAL RODS (Two case studies) by Dave Derrick.
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
LOCKED LOGS (LL). THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
STONES IN COMPRESSION – BOTH NATURALLY & MACHINE PLACED by Dave Derrick.
SKUNK RIVER PIPELINE PROTECTION PROJECT NEAR DENMARK, IOWA SUB MAR.
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
SUB MAR West Fork of Beaver River West Point, OH. Pre-project pictures. Note eroding outer bank.
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
SINGLE STONE BENDWAY WEIRS
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg.
DEAD DIKES. DEAD DIKES USING DEAD POSTS IS A DAVE DERRICK DISCOVERY (DDD)
Hickahala Creek Pipeline Protection Project at milepost Tate County, Senatobia, MS (Looking across and upstream in this view) Designed jointly by.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
GRADE CONTROL: the VIFFLE {Combo of the cross- Vane & rocked rIFFLE}
THE ROCK BOX  Cost to build Rock Box $18K, constructed of ½ inch steel plate, box is designed to increase in-stream stone placement production by keeping.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BUSTING MYTHS VEGETATION TAKES A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
Half-Drowned Bushes with Traffic Control Stones & additional plantings.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
Headcut gets taller & ACM mat flips out of the upstream key trench of the downstream pipe crossing, which causes problems. Project.
GRADE CONTROL.
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
ONONDAGA CREEK, NEAR SYRACUSE, NY
VINES – THE OVERLOOKED RESTORATION TECHNIQUE
When should you fix a stream????
SINGLE STONE BENDWAY WEIRS
VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
When should you fix a stream????
In-Stream Structures & Grade Control
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Presentation transcript:

WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE

STABILIZE HEADCUTS FIRST, THEN WORRY ABOUT BANK INSTABILITY SECOND

Mini case study: 1 of 10 DESIGN & CONSTRUCTION OVERSIGHT BY WAYNE KINNEY, PREZ, MIDWEST STREAMS, INC. OAKDALE, IL.

A 4. 7 ft tall ERR, Big Creek, Union County, IL A 4.7 ft tall ERR, Big Creek, Union County, IL. {rural, sand-gravel, pool-riffle-pool, meandering, incised} Designed by Wayne Kinney Mini case study: 2 of 10 Looking DS at the 4.7 ft tall Engineered Rocked Riffle in the proper location in the crossing between two bends Photo by Derrick 2/7/2007

Pool Bank protection Key Glide ERR Key Bank protection

A 4. 7 ft tall ERR, Big Creek, Union County, IL A 4.7 ft tall ERR, Big Creek, Union County, IL. Designed by Wayne Kinney Mini case study: 3 of 10 Photo by Derrick 2/7/2007 Looking at the key, flow right to left. US ERR slope is angle of repose, DS ERR slope is 20 to 1.

A 4. 7 ft tall ERR, Big Creek, Union County, IL A 4.7 ft tall ERR, Big Creek, Union County, IL. Designed by Wayne Kinney Mini case study: 4 of 10 Key is dug 3 ft deep into substrate & up each bank. Stone is IL-DOT RR5-well-graded stone with a top size of 400 pounds. Photo by Derrick 2/7/2007

A 4. 7 ft tall ERR, Big Creek, Union County, IL A 4.7 ft tall ERR, Big Creek, Union County, IL. Designed by Wayne Kinney Mini case study: 5 of 10 Looking DS. Uniform 20 to 1 slope, roughness dissipates energy & assists in fish passage. Photo by Derrick 2/7/2007

A 4. 7 ft tall ERR, Big Creek, Union County, IL A 4.7 ft tall ERR, Big Creek, Union County, IL. Designed by Wayne Kinney Mini case study: 6 of 10 Photo by Derrick 2/7/2007 Flood flow crested 5 ft above banks (30 ft over the crest of the ERR) with no damage

Looking US at the 4.7 ft tall Engineered Rocked Riffle A 4.7 ft tall ERR, Big Creek, Union County, IL. Designed by Wayne Kinney Mini case study: 7 of 10 Looking US at the 4.7 ft tall Engineered Rocked Riffle Photo by Derrick 2/7/2007

A 4. 7 ft tall ERR, Big Creek, Union County, IL A 4.7 ft tall ERR, Big Creek, Union County, IL. Designed by Wayne Kinney Mini case study: 8 of 10 Photo by Derrick 2/7/2007

Mini case study: 9 of 10 Looking US. A thing of beauty!! Stone was track-walked to increase stability Photo by Derrick 2/7/2007

Looking US, note riprap bank protection. A 4.7 ft tall ERR, Big Creek, Union County, IL. Designed by Wayne Kinney Mini case study: 10 of 10 Looking US, note riprap bank protection. Photo by Derrick 2/7/2007

This PowerPoint presentation was developed & built by Dave Derrick This PowerPoint presentation was developed & built by Dave Derrick. Any questions or comments, call my personal cell @ 601-218-7717, or email @ d_derrick@r2d-eng.com Enjoy the information!! “Based on the interagency publication, Stream Corridor Restoration: Principles, Processes, and Practices, this introductory training covers: Stream corridor ecosystems and their components Ecological processes, structure & functions Characterization and analysis of stream corridors Development of a restoration plan Design, implementation, monitoring, and Integrated, iterative, adaptive, flexible approaches”.