Chapter 11 Standard Costs and Variance Analysis
John Wiley & Sons, Inc. Prepared by Karleen Nordquist.. The College of St. Benedict... and St. John’s University.... Managerial Accounting Weygandt, Kieso,
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
Standard Costing and Variances
Standard Costing: A Managerial Control Tool
By Edgar K. Browning & Mark A. Zupan John Wiley & Sons, Inc.
Managerial Accounting by James Jiambalvo
Managerial Accounting
Managerial Accounting by James Jiambalvo
Managerial Accounting by James Jiambalvo
Accounting Principles, Ninth Edition
Standard Costs and Variance Analysis
Managerial Accounting Balakrishnan | Sivaramakrishnan | Sprinkle | Carty | Ferraro Chapter 8: Budgetary Control and Variance Analysis Prepared by Debbie.
CHAPTER 10: STATIC AND FLEXIBLE BUDGETS Cost Management, Canadian Edition © John Wiley & Sons, 2009 Chapter 10: Static and Flexible Budgets Cost Management,
Prepared by Debby Bloom-Hill CMA, CFM
CHAPTER 5 Variable Costing. CHAPTER 5 Variable Costing.
Prepared by Debby Bloom-Hill CMA, CFM. Slide 11-2 CHAPTER 11 Standard Costs and Variance Analysis Standard Costs and Variance Analysis.
Managerial Accounting by James Jiambalvo Chapter 9: Standard Costs and Variance Analysis Slides Prepared by: Scott Peterson Northern State University.
Managerial Accounting by James Jiambalvo
Managerial Accounting by James Jiambalvo
Process Cost Accounting
Financial Accounting, Tenth Edition
Managerial Accounting by James Jiambalvo
Financial and Managerial Accounting
Standard Costs Budget for a single unit
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Cost Accounting: Foundations and Evolutions, 8e Kinney ● Raiborn © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
1 Module 22 Standard Costs and Variance Analysis.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
Accounting Principles, Ninth Edition
Job-Order Costing for Manufacturing & Service Companies
Deluxe Linens Deluxe Linens makes high-end sheets which they sell to major retail stores and on their website. The budgeted costs for materials and direct.
Chapter Chapter 22-2 CHAPTER 22 STANDARD COSTS AND BALANCED SCORECARD Accounting, Fourth Edition.
Performance Evaluation Through Standard Costs
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 8 Standard Costs.
Slide 11-2 CHAPTER 11 Standard Costs and Variance Analysis Standard Costs and Variance Analysis.
CHAPTER 5 Variable Costing. CHAPTER 5 Variable Costing.
Standard Costs Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 43.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
1. 2 Chapter 6 REPORTING AND ANALYZING INVENTORY.
Performance Evaluation
Managerial Accounting by James Jiambalvo
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Managerial Accounting by James Jiambalvo Chapter 8: Budgetary Planning and Control Slides Prepared by: Scott Peterson Northern State University.
ACC3200 STANDARD COSTING.
Chapter 11-1 Managerial Accounting, Sixth Edition Standard Costs And Balance Scorecard 11.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Performance Evaluation Through Standard Costs Chapter 26 Prepared by Naomi Karolinski Monroe Community College and and Marianne Bradford Bryant College.
Managerial Accounting by James Jiambalvo
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 8 © The McGraw-Hill Companies, Inc., 2007 McGraw-Hill /Irwin Standard Costs.
A- 1. A- 2 Appendix B Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
K-1. K-2 Appendix K Standards of Ethical Conduct for Management Accountants The Institute of Management Accountants has published and promoted the following.
I-1. I-2 I ACCOUNTING FOR SOLE PROPRIETORSHIPS Accounting, Fifth Edition.
H-1 Prepared by Coby Harmon University of California, Santa Barbara Westmont College.
Slide 14-2 CHAPTER 14 Analyzing Financial Statements: A Managerial Perspective.
Prepared by Debby Bloom-Hill CMA, CFM
Prepared by Debby Bloom-Hill CMA, CFM
Prepared by Debby Bloom-Hill CMA, CFM
CHAPTER25 Standard Costs and Balanced Scorecard.
MANAGEMENT ACCOUNTING
© 2017 by McGraw-Hill Education
Variance Analysis–A Tool for Cost Control and Performance Evaluation
STANDARD COSTING A MANAGERIAL CONTROL TOOL Slides by: Perpetua D. Cahayag.
Presentation transcript:

Managerial Accounting by James Jiambalvo Chapter 11: Standard Costs and Variance Analysis Slides Prepared by: Scott Peterson Northern State University

Objectives Explain how standard costs are developed. Calculate and interpret variances for direct material. Calculate and interpret variances for direct labor. Calculate and interpret variances for manufacturing overhead. Calculate the financial impact of operating at more or less than planned capacity.

Objectives (Continued) Discuss how the management by exception approach is applied to investigation of standard cost variances. Explain why a “favorable” variance may be unfavorable, how process improvements may lead to “unfavorable” variances, and why evaluation in terms of variances may lead to overproduction.

Standard Costs Standard cost refers to expected costs under anticipated conditions. Standard cost systems allow for comparison of standard versus actual costs. Differences are referred to as standard cost variances. Variances should be investigated if significant.

Standard Costs and Budgets Standard cost is the standard cost of a single unit. Budgeted cost is the cost, at standard, of the total number of budgeted units.

Development of Standard Costs Standard costs are developed in a variety of ways: Specified by formulas or recipes. Developed from price lists provided by suppliers. Determined by time and motion studies conducted by industrial engineers. Developed from analyses of past data.

Ideal Versus Attainable Standards Two schools of thought: Ideal standards (perfection standards): developed under the assumption that no obstacles to the production process will be encountered. Attainable Standards: developed under the assumption that there will be occasional problems in the production process.

A General Approach To Variance Analysis Direct material: materials price and materials quantity variance. Direct labor: labor rate (price) and labor efficiency (quantity) variance. Overhead: overhead volume variance and controllable overhead variance.

Material Variances Differences between standard and actual material costs: Material price variance. Material quantity variance.

Material Price Variance Material price variance:(AP – SP) x AQp (AP) = actual price per unit of material. (SP) = standard price per unit of direct material. (AQp) = actual quantity of material purchased. Actual price > standard price: unfavorable. Actual price < standard price: favorable.

Material Quantity Variance Material quantity variance: (AQu – SQ)SP (AQu) = actual quantity of material used. (SQ) = standard quantity of material allowed. (SP) = standard price of material. Actual quantity > standard quantity: unfavorable. Actual quantity < standard quantity: favorable.

You Get What You Measure

Direct Labor Variances Differences between standard and actual direct labor costs: Labor rate (price) variance. Material efficiency (quantity) variance.

Labor Rate Variance Labor rate (price) variance: (AR – SR)AH (AR) = actual wage rate (price). (SR) = standard wage rate (price). (AH) = actual number(quantity) labor hours. Actual rate > standard rate: unfavorable. Actual rate < standard rate: favorable.

Labor Efficiency Variance Labor efficiency (quantity) variance: (AH – SH)SR (AH) = actual number of hours worked. (SH) = standard number of hours worked. (SR) = standard labor wage rate. Actual hours > standard hours: unfavorable. Actual hours < standard hours: favorable.

Overhead Variances Differences between overhead applied to inventory at actual overhead costs: Controllable overhead variance. Overhead volume variance.

Controllable Overhead Variance Actual overhead ($$) - flexible budget level of overhead ($$) for actual volume of production. Referred to as controllable because managers are expected to control costs. Actual > budget: unfavorable. Actual < budget, then the variance is favorable.

Overhead Volume Variance Overhead volume variance: flexible budget level of overhead for actual level of production - overhead applied to production using standard overhead rate. This variance is solely the result of a different number of units being produced than planned in the static budget. Usefulness is limited.

Calculating The Financial Impact Of Operating At More or Less Than Planned Capacity Operating at less than planned capacity results in an unfavorable variance equal to the number of units (less than planned) x the marginal cost per unit. Operating at more than planned capacity results in a favorable variance equal to the number of units (more than planned) x the marginal cost per unit.

Comprehensive Example: Darrington Ice Cream Standard Costs Per Unit: Item Qty. x Price = Total Direct Materials: .8 gal. 2.50 = $2.00 Direct Labor: .125 hrs. 12.00= $1.50 Mfg. Overhead: $ .75 Total Cost Per Unit (Standard) $4.00

Comprehensive Example: Darrington Ice Cream

Material Variances Material price variance:(AP – SP) x AQp : ($2.72 - $2.50) x 810,000 = $178,200 unfavorable. Material quantity variance: (AQu – SQ)SP: (809,000 – 800,000) x $2.50 = $22,500 unfavorable.

Labor Variances Labor rate (price) variance: (AR – SR)AH: ($12.10 - $12.00) x 130,000 = $13,000 unfavorable. Labor efficiency (quantity) variance: (AH – SH)SR: (130,000 – 125,000) x $12 = $60,000 unfavorable.

Overhead Variances Controllable overhead variance: Actual overhead ($$) - flexible budget level of overhead ($$) for actual volume of production: $680,000 - $700,000 = $20,000 unfavorable. Overhead volume variance: flexible budget level of overhead for actual level of production - overhead applied to production using standard overhead rate: $700,000 - $750,000 = $50,000 favorable.

Investigation of Standard Cost Variances Standard cost variances are not a definitive sign of good or bad performance. Variances are merely indicators of potential problems which must be investigated. There are many plausible explanations for them.

Management By Exception Investigation of standard cost variances is a costly activity Management must decide which variances to investigate. Most managers practice management by exception. What is “exceptional?” Usually an absolute dollar amount or a percentage dollar amount.

“Favorable” Variances May Be Unfavorable A “favorable” variance does not mean that it should not be investigated. Raw materials are good examples of this phenomenon. Consider inferior, low-priced materials. A favorable price variance may result, but there may also be substantially more scrap and rework, and thus a higher quantity variance.

Can Process Improvements Lead to “Unfavorable” Variances? Process improvements frequently lead to unfavorable variances. Process improvements often lead to increased productivity. Therefore fewer hours may be required to produce a unit of output. But actual hours will remain unchanged unless the firm terminates the workers to became “more productive.”

Beware-Evaluation in Terms of Variances Can Lead To Excess Production A department in front of another (bottleneck) department should not produce more than the bottleneck department can handle. If it cuts back, it will idle workers. If it doesn’t there will be excess work in process and a negative effect on shareholder value.

Responsibility Accounting and Variances Managers should be held responsible only for costs they can control. This is also true in the area of variance analysis. A purchasing agent may be held responsible for direct material price variances, but certainly not direct material quantity (usage) variances.

Appendix: Recording Standard Costs Material Labor Overhead Finished goods Cost of goods sold Closing variance accounts

Recording Material Costs Purchase of raw materials inventory: Account dr. cr. Raw Material Inventory (std.) x Material Price Variance x Accounts Payable (actual) x Usage of raw materials inventory: Work in Process Inventory x Material Quantity Variance x Raw Material Inventory x

Recording Labor Costs Recording Labor Cost: Account dr. cr. Work in Process Inventory (std.) x Labor Rate Variance x Labor Efficiency Variance x Wages/Sal. Payable (actual) x

Recording Manufacturing Overhead: Step 1 To record actual overhead cost: Account dr. cr. Manufacturing Overhead x *Various Accounts x

Recording Manufacturing Overhead: Step 2 To apply overhead cost to work in process inventory at cost: Account dr. cr. Work in Process Inventory x Manufacturing Overhead x

Recording Manufacturing Overhead: Step 3 To close out manufacturing overhead cost to work in process inventory at cost: Account dr. cr. Manufacturing Overhead x Overhead Volume Variance x Controllable Overhead

Recording Finished Goods To record completed units sent to finished goods: Account dr. cr. Finished Goods Inventory x Work in Process Inventory x

Recording Cost Of Goods Sold To apply overhead cost to work in process inventory at cost: Account dr. cr. Cost of Goods Sold x Finished Goods Inventory x

Closing Variance Accounts Temporary variance accounts must be closed at the end of the period. Account dr. cr. Cost of Goods Sold x Overhead Volume Variance x Controllable Overhead Variance x Material Price Variance x Material Quantity Variance x Labor Rate Variance x Labor Efficiency Variance x

Quick Review Question #1 What does an unfavorable overhead volume variance mean? Overhead costs are out of control. Overhead costs are under control. Production was greater than anticipated. Production was less than anticipated.

Quick Review Answer #1 What does an unfavorable overhead volume variance mean? Overhead costs are out of control. Overhead costs are under control. Production was greater than anticipated. Production was less than anticipated.

Quick Review Question #2 Standard material costs per unit are $3.50. Actual costs per unit are $3.80 Actual quantity is 3,000. Standard quantity is 2,800. Material price variance is: $900 favorable $900 unfavorable $700 favorable $700 unfavorable

Quick Review Answer #2 Standard material costs per unit are $3.50. Actual costs per unit are $3.80 Actual quantity is 3,000. Standard quantity is 2,800. Material price variance is: $900 favorable $900 unfavorable $700 favorable $700 unfavorable

Quick Review Question #3 Standard material costs per unit are $3.50. Actual costs per unit are $3.80 Actual quantity is 3,000. Standard quantity is 2,800. Material quantity variance is: $900 favorable $900 unfavorable $700 favorable $700 unfavorable

Quick Review Answer #3 Standard material costs per unit are $3.50. Actual costs per unit are $3.80 Actual quantity is 3,000. Standard quantity is 2,800. Material quantity variance is: $900 favorable $900 unfavorable $700 favorable $700 unfavorable

Quick Review Question #4 What does a favorable labor efficiency variance mean? Labor rates were higher than called for by standards. Inexperienced labor was used, causing the rate to be lower than standard. More labor was used than called for by standards. Less labor was used than called for by standards.

Quick Review Answer #4 What does a favorable labor efficiency variance mean? Labor rates were higher than called for by standards. Inexperienced labor was used, causing the rate to be lower than standard. More labor was used than called for by standards. Less labor was used than called for by standards.

Copyright © 2004 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United States Copyright Act without the express written permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information contained herein.