Accessing Carbon Finance Case Study: CDM and Energy Efficiency Hakim Zahar, P.Eng. Vice-President ECONOLER INTERNATIONAL February-March, 2007.

Slides:



Advertisements
Similar presentations
Panel discussion Low Carbon Generation Technology
Advertisements

Delivering a real CDM Project The BP PRODEEM Rural Solar Project.
1 Sustainable Development Assessment of CDM projects in Georgia Mariam Ubilava Istanbul, Turkey January, 2008.
PDD Preparation Cairo, June 14-15, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXVega Bahia Landfill Project Design Document.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Conducting Carbon Projects Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
Tunisian project portfolio CDM Investor Forum DJERBA, September 2004.
CDM PoA Development Case Study: Morocco Municipal Solid Waste.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Djerba Carbon Exhibition Djerba, September 22-24, 2004 Onyx Gas Capture and Flaring ProjectOnyx Gas Capture and Flaring Project Alexandria, Egypt Amr Abdel-Aziz,
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Reducing poverty through sustainable industrial growth Power-Gen PAK rd International Conference.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Prototype Carbon Fund Training Workshop: Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30- October 2, 2002 Eduardo Dopazo.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Carbon Finance in Practice Public Heating Biomass Systems in Moldovan Rural Communities Project Anatol Gobjila, World Bank February 28, 2007, Tirana, Albania.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
CDM Methodologies and Project Design: Workshop for CDM Project Developers 12/5/2004. Buenos Aires. Analysis of the Additionality Tool (with project examples)
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
Green Banking and MRV 17 November 2010 Takashi Hongo Special Advisor and Head of Environment Finance Engineering Department Japan Bank for International.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Global Carbon Market and CDM Potential in Cement Production Industry.
CLEAN ENERGY MECHANISMS IN CONVENTIONAL POWER GENERATION H.AZOUZ, CDM Project Management Officer at STEG
Greenhouse Gas Emission Reduction and Industry The World Bank March 2007.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia A.T. Biopower Rice Husk.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Global Carbon Market and CDM Potential in Cement Production Industry.
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
Clinic: PIN preparation Hakim Zahar, P.Eng. Vice-President ECONOLER INTERNATIONAL & Natasa Markovska, D.Sc. EE Senior Scientific Collaborator Consultant.
Programmatic CDM: Eligibility, Methodological Requirements and Implementation Development Dividend Side Event December 5, 2005 Christiana Figueres Team.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
The policy and plan on CDM Forum MDP Maroc Marrakech, April Italian Ministry for the Environment and Territory Department for Global Environment,
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Laguna De Bay Carbonshed Project Idea: A Demand-Driven, Umbrella Approach to Community Carbon Finance for Environmental Projects.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
July 3 – 4, 2003, Szentendre Dr. Valdemars Scerbaks MSc Peteris Blumats.
CDM: Quick Overview Matt Spannagle Technical Manager Millennium Development Goals Carbon Facility Bureau for Development Policy United Nations Development.
The Danish CDM Project Development Facility Financing CDM in Indonesia Erik Dugstad, Sr. Economist, ECON Analysis Agus Sari, Climate change specialist,
El Gallo Hydroelectricity Project PDD Analysis
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology 1 of the 1 st 2 methodologies recommended for approval by the Meth Panel, July 2003.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
Challenges and Opportunities for Addressing Global Climate Change February 2006.
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
0 BARRIERS TO CDM PROJECT FINANCING Presentation to CDM Financial Mechanism Training Course 18 September 2003 Clean Energy Finance Committee.
Bundling small scale projects Principles of bundling Bundling Documentation Examples and their applications in Carbon Finance projects Bundling (& “de-bundling”)
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
“The World Bank – Italian Trust Fund for Environmental Protection in CHina” Technical Meetings – Beijing – January 23-24, 2006 Climate Changes Related.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Market Development of ESCO in China Dai Cunfeng Chinese Renewable Energy Industries Association (CREIA) Adviser of EMC Association (EMCA)
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Seite 1 Seite Seite 1 CDM in Egypt Potentials and Projects Presentation by Dr. Paul H. Suding, GTZ MENA Carbon Forum 2009 Cairo,
How to Develop Landfill Gas CDM Projects with Local Municipal Authorities? Kok Kee Chow, Managing Director, Sustainable Technology Resource Centre STREC.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology
UNDP - Fortis MDG Carbon Facility
The Danish CDM Project Development Facility Financing CDM in Indonesia
Presentation transcript:

Accessing Carbon Finance Case Study: CDM and Energy Efficiency Hakim Zahar, P.Eng. Vice-President ECONOLER INTERNATIONAL February-March, 2007

Three Case Studies 1.Standard Energy efficiency project: Taishan Cement Works Waste Heat Recovery (WHR) and Utilisation for Power Generation Project 2.Project bundling: Landfill Gas Recovery and Flaring for 9 bundled landfills in Tunisia 3.Programmatic approach: Moldova Energy conservation and greenhouse gases emissions reduction

1st Case study: Taishan Cement Works WHR and Utilisation for Power Generation Project Project Description Status of the project for its registration CDM deal structure: tenders or sole source Financing of the CDM costs Methodology Additionality

1st Case study: Taishan Cement Works Project Description –Project Activity : waste heat recovery and utilization for power generation project –Location: Taishan Cement Works in Ninyang County of Shandong Province of the People’s Republic of China. –Host Party: China –Other Parties Involved: United Kingdom of Great Britain and Northern Ireland –Authorized Participants: Natsource Europe Limited –Description: The Taishan Cement Works produces highquality cement using the new dry process technique and has been being implemented in two phases – the 2500 tons per day clinker production line commenced operation in June 2003 and the 5000 tons per day clinker production began production November 2004.

1st Case study: Taishan Cement Works Project Description –Problematic: Energy demand has increased in tandem with cement production and the captive power plant has insufficient capacity to provide for this increase. –Baseline: Taishan would have to take electricity either from the grid, or construct a new waste coal fueled captive power plant, the most economically attractive option. –Project Activity: recovery and use of waste heat from the rotating kilns of the two cement clinker production lines. The waste heat is currently mainly vented to atmosphere, with a portion re-circulated within the clinker process. However the Project Activity will now capture the waste heat for use in a power generation plant, the exhaust heat of which can also still be recirculated to the clinker process. This power generation plant will be rated at 13.2MW and will produce annually 89.5 million kWh of electricity with no significant associated emissions of CO2.

1st Case study: Taishan Cement Works Project Description –Large Scale Project –Categories: 1 and 4 The project activity falls under sectoral scope 4 – Manufacturing Industries, specifically the cement sector. The project activity is also relevant to sectoral scope 1 – Energy– Mining/mineral production. –Amount of Reductions: 105,894 metric tonnes CO2 equivalent per annum

1st Case study: Taishan Cement Works Status of the project for its registration –The start date of the Project Activity was 1st July 2004, when equipment ordered. –Validation report: March 2006 –Registration Date: June 24, 2006 –Crediting Period: 01 Jan Dec 12 (Renewable)

1st Case study: Taishan Cement Works CDM deal structure: tenders or sole source –Xinwen Mining Group Company is permitted by the National Development and Reform Commission of the People’s Republic of China to transfer to the Natsource Europe Limited no more than 800,000 tCO 2 e in total CERs for a period of 7 years from the starting date of the project. Financing of the CDM costs –Fee level: USD

1st Case study: Taishan Cement Works Methodology –This Project Activity uses the approved methodology AM0024 titled “Methodology for greenhouse gas reductions through waste heat recovery and utilization for power generation at cement plants” which was developed for this Project Activity and which was recommended for approval by the methodologies panel at their 17th meeting and accepted by the Executive Board at their 21st meeting. –The methodology is applicable to the Project as the Project clearly utilises waste heat recovery for utilisation in a power generation unit at a cement plant.

1st Case study: Taishan Cement Works Methodology : The methodology lists five applicability criteria and all of these applicability criteria clearly apply to this Project Activity because: A.The electricity produced by the Project Activity is used within the cement works where the Project Activity is located and there is no electricity export to the grid in the baseline scenario. B.The Project Activity displaces electricity from an identified specific generation source which is a 15MW extension to the 37MW captive coal fired plant at the site (baseline). This 15MW extension, i.e. the baseline scenario, is a more economically attractive course of action than the proposed CDM Project Activity.

1st Case study: Taishan Cement Works Methodology : The methodology lists five applicability criteria and all of these applicability criteria clearly apply to this Project Activity because: C.There is sufficient publicly available information to identify the specific generation source (baseline) which is a 15MW extension to the existing 37MW captive coal fired plant at the site. D.The PDD demonstrates that in the baseline, waste heat use is only possible within the boundary of the clinker making process. E.Waste heat is only planned to be used in the Project Activity and for recycling waste heat within the boundary of the clinker making process.

1st Case study: Taishan Cement Works CDM project additionality demonstration: 1.Prior to the project starting date the Project Sponsor had entered into a CDM development agreement with a CDM consulting company and started the preparation of a submission of a new methodology applicable to the project activity (NM0079). 2.The Project Activity is not the only option which is available to the Project Owners. 3.There is clear evidence that the Project Activity is less financially attractive than the baseline scenario for a wide range of scenarios (the Project IRR of the baseline scenario is 67% higher than the Project Activity) 4.There are technological barriers and barriers to prevailing practice

1st Case study: Taishan Cement Works CDM project additionality demonstration: 5.No similar projects were found in Shandong Province and only four similar projects have been identified as implemented in China at similar sized cement plants to date – two using imported equipment and two using domestic equipment. None of those projects located at a mine mouth cement plant where the incentives for carrying out the Project Activity are considerably different to cement works where there are no captive power plant options. 6.Clearly the CDM revenue represents a significant stream of revenue for the Project, counting for 19.2% of the annual revenue of the project during the crediting period assuming a conservative CER value of USD6 per ton and comparing it against avoided electricity purchases. This potential benefit directly increases the investment return of the Project Activity and compensates for its increased cost and increased risks.

2 nd Case Study: Project bundling: Landfill Gas Recovery and Flaring for 9 bundled landfills in Tunisia Definition of bundling Project Description Status of the project for its registration CDM deal structure: tenders or sole source Financing of the CDM costs Methodology Additionality

Definition of bundling A bundle of CDM projects is defined as a collection or aggregation of several CDM projects. In a bundle, each activity could be undertaken individually as a CDM project activity (e.g. three wind farms) and the various project activities are only bundled together in order to reduce CDM-related transaction costs. A proposed CDM project shall be deemed to be a bundle of CDM projects : –The bundled technologies/measures should be independently owned and operated; –The bundle should be implemented at different locations; –New CDM projects can be added to a bundle within the crediting period;

2 nd Case Study: 9 bundled landfills in Tunisia Project Description –Project Activity : Landfill Gas Recovery and Flaring for 9 bundled landfills in Tunisia –Location: The nine landfills are disseminated over the Tunisian Territory and close to the following cities: Bizerte, Sfax, Kairouan, Djerba, Gabes, Monastir, Sousse, Nabeul and Medenine. –Host Party: Tunisia –Other Parties Involved: Italy –Authorized Participants: International Bank for Reconstruction and Development (IBRD) as the Trustee of Italian Carbon Fund (ICF) –Large Scale Project –Categories: Waste handling and disposal

2 nd Case Study: 9 bundled landfills in Tunisia Project Description –Description: The project activity will install a gas recovery and flaring system in each of the nine landfills, in order to reduce CH4 emissions, and thus generate CERs, while ensuring safety at the Landfill sites, serving sustainable development purposes, and providing additional resources to environment protection in Tunisia. The nine landfills have an aggregated nominal capacity of 3,300 tons of waste per day; i.e. 1.2 million tons of waste/year. –Baseline: Originally, none of the nine landfills was designed to be equipped with LFG management system. –Amount of Reductions: 317,909 metric tonnes CO2 equivalent per annum

2 nd Case Study: 9 bundled landfills in Tunisia Status of the project for its registration –The starting date of the project activity is expected to be 1st January –Validation report: February 2006 –Registration Date: November 23, 2006 –Crediting Period: 01 Jan Dec 12 (Fixed)

2 nd Case Study: 9 bundled landfills in Tunisia CDM deal structure: tenders or sole source –The LFG recovery and flaring systems will be financed by the National Waste Management Agency (ANGED), and operated by private contractors. –Total investment of the LFG collection and flaring system in the nine landfills is estimated at 6.7 MUS$, which will be mobilized through a World Bank Loan. –The World Bank will provide to the government of Tunisia with a loan to partially finance a Solid Waste Management Project to support the implementation of this programme Financing of the CDM costs Fee level: USD

2 nd Case Study: 9 bundled landfills in Tunisia Methodology –Consolidated baseline methodology for landfill gas project activities – ACM0001/Version3, dated 19 May 2006 –Project activity meets applicability criteria of the chosen methodology. This methodology is adopted in relation with the selected approach for Baseline taken from paragraph 48 of the CDM modalities and procedures: “(b) Emissions from a technology that represents an economically attractive course of action, taking into account barriers to investment”.

2 nd Case Study: 9 bundled landfills in Tunisia Additionality 1.The project will start by July 2006, so the registration will occur before the start of the first crediting period. 2.There is no mandatory law or regulation, or any contractual arrangement that force Landfill operators to collect and flare methane or to use it for electricity generation. 3.Considering the LFG project without CDM, the project would not have been adopted by Tunisia as it wouldn't generate any revenue, and its NPV would be negative (MUS$ -9.1), with an IRR also negative. 4.Common Practice for Controlled landfills in Tunisia will not consider CH4 extraction and flaring, and it is unlikely that LFG systems would be prevalent in the future without the CDM contribution. 5.The project activity will generate significant economic benefits through the sale of ERs that will justify contracting a loan to cover the investment expenses and to make project implementation possible.

3 rd Case Study: Programmatic approach: Moldova Energy conservation and greenhouse gases emissions reduction Definition of programmatic approach Project Description Status of the project for its registration CDM deal structure: tenders or sole source Financing of the CDM costs Methodology Additionality

Definition of programmatic approach The program is the project, the program enacting agent is project participant The Program can be a private sector initiative or a Government measure: voluntary or mandatory Emission reductions are achieved by multiple actions executed over time Type, size and timing of the induced actions may not be known at the time of registration

3rd Case Study: Moldova Energy conservation and GHG reduction Project Description –Project Activity: The project refers to energy conservation measures in public buildings and consequently to GHG emission reduction. –Location: 32 public buildings in 9 municipalities of the Republic of Moldova: Cantemir, Edinet, Falesti, Floresti, Hincesti, Ialoveni, Nisporeni, Straseni, Ungheni –Host Party: Republic of Moldova –Bilateral and Multilateral Funds : Community Development Carbon Fund (CDCF) Managing company: International Bank for Reconstruction and Development (IBRD) Netherlands –Authorized Participants: Carbon Finance Unit Moldova –Small Scale Project

3rd Case Study: Moldova Energy conservation and GHG reduction Project Description –Description: This Moldovan project aims at GHG emission reduction as result of efficiency improvements and fuel switching measures for a series of public buildings (kindergartens, schools, vocational schools, hospitals, policlinics etc.) implemented via the WB Moldova Energy II Project. –Baseline: the most conservative scenario selection, has been chosen the scenario corresponding to five (5) percent annual heat consumption growth rate. –Categories: Sectoral scope 1: Energy industries (renewable - / non- renewable sources); Sectoral scope 3: Energy demand –Amount of Reductions: 11,567 metric tonnes CO2 equivalent per annum –Fee level: USD 5000

3 rd Case Study: Moldova Energy conservation and GHG reduction Status of the project for its registration –The start date of the Project Activity was January 15, 2006 –Validation report: November 7, 2005 –Registration Date: January 29, 2006 –Crediting Period: 20 Jan Jan 16 (Fixed)

3 rd Case Study: Moldova Energy conservation and GHG reduction CDM deal structure: tenders or sole source –The total Energy II project financing will be US$ million, of which US$35 million would be financed from an IDA credit, US$4.33 million from internal cash generation and municipal contributions and US$0.6 million from the Swedish International Development Agency (SIDA). –The WB Energy II Project investment decisions refer to least cost technical solutions, which have to satisfy the required heating standards at minimum costs. –The Community Development Carbon Fund (CDCF) will have the CER rights. Financing of the CDM costs :

3rd Case Study: Moldova Energy conservation and GHG reduction Methodologies –II.E Energy efficiency and fuel switching measures for buildings –III.B Switching fossil fuels

3rd Case Study: Moldova Energy conservation and GHG reduction Additionality a)Investment barrier: a financially more viable alternative to the project activity would have led to higher emissions; b)Technological barrier: a less technologically advanced alternative to the project activity involves lower risks due to the performance uncertainty or low market share of the new technology adopted for the project activity and so would have led to higher emissions; c)Barrier due to prevailing practice: prevailing practice or existing regulatory or policy requirements would have led to implementation of a technology with higher emissions; d)Other barriers: without the project activity, for another specific reason identified by the project participant, such as institutional barriers or limited information, managerial resources, organizational capacity, financial resources, or capacity to absorb new technologies, emissions would have been higher’.

Thank you for your attention! Hakim Zahar, P.Eng