Metrics and Monitoring Capabilities for Earth Science Data Systems ESDSWG Wilmington, Delaware October 20-22, 2009.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Advertisements

Module 13: Performance Tuning. Overview Performance tuning methodologies Instance level Database level Application level Overview of tools and techniques.
Roadmap for Sourcing Decision Review Board (DRB)
Web Visualization Technology Horner APG Ver 1.0.
Enterprise Traffic Management Challenges Performance Management for Converged Networks.
QoS Solutions Confidential 2010 NetQuality Analyzer and QPerf.
Systems Engineering in a System of Systems Context
Introduction and Election of Co-Chair H. K. (Rama) Ramapriyan NASA/GSFC Metrics Planning and Reporting (MPAR) WG 8 th Earth Science Data Systems Working.
ManageEngine TM Applications Manager 8 Monitoring Custom Applications.
Monitoring a Large-Scale Network: Selecting the Right Tool Sayadur Rahman United International University & Network Manager, Financial Service.
Extensible Scalable Monitoring for Clusters of Computers Eric Anderson U.C. Berkeley Summer 1997 NOW Retreat.
Requirements Capture and Specification IACT424/924 Corporate Network Design and Implementation.
Chapter 9: Moving to Design
Next Generation Application Platform (NGAP) Andrew Mitchell WGISS-39 Tsukuba, Japan Monday, May 11,
Systems Analysis I Data Flow Diagrams
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Firewalls and VPNS Team 9 Keith Elliot David Snyder Matthew While.
Hands-On Microsoft Windows Server 2008 Chapter 11 Server and Network Monitoring.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Load Test Planning Especially with HP LoadRunner >>>>>>>>>>>>>>>>>>>>>>
Hands-on Networking Fundamentals
Solution Overview for NIPDEC- CDAP July 15, 2005.
2006 Palisade User ConferenceNovember 14 th, 2006 Inventory Optimization of Seasonal Products with.
Chapter 9 Elements of Systems Design
INFO425: Systems Design INFORMATION X Finalizing Scope (functions/level of automation)  Finalizing scope in terms of functions and level of.
Net Optics Confidential and Proprietary Net Optics appTap Intelligent Access and Monitoring Architecture Solutions.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Earth Observing System Data and Information System (EOSDIS) provides access to more than 3,000 types of Earth science data products and specialized services.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Identifying Application Impacts on Network Design Designing and Supporting Computer.
T r a n s p a r e n t f a s t r e l i a b l e
Module 10: Monitoring ISA Server Overview Monitoring Overview Configuring Alerts Configuring Session Monitoring Configuring Logging Configuring.
CD FY10 Budget and Tactical Plan Review FY10 Tactical Plans for Financial Management Valena Sibley October 8, 2009 Tactical plan nameDocDB# FY10 Tactical.
EOSDIS FY2010 Annual Metrics Report Prepared By: Hyo Duck Chang Adnet, Inc. Brian Krupp Adnet, Inc. Lalit Wanchoo Adnet, Inc. February 2011.
Sponsored by the National Science Foundation 1 March 15, 2011 GENI I&M Update: Gathering, Transferring and Sharing MD Goals Architecture Overview –Process.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Identifying Application Impacts on Network Design Designing and Supporting.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Coordinating the TeraGrid’s User Interface Areas Dave Hart, Amit Majumdar, Tony Rimovsky, Sergiu Sanielevici.
1 Network Monitoring Mi-Jung Choi Dept. of Computer Science KNU
Monitoring Windows Server 2012
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
Graphing and statistics with Cacti AfNOG 11, Kigali/Rwanda.
MPARWG Business & Disposition of Action Items from MPARWG October 2009 H. K. (Rama) Ramapriyan NASA/GSFC Metrics Planning and Reporting (MPAR) WG 9 th.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
EOSDIS Status 10/16/2008 Dan Marinelli, Science Systems Development Office.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
ESDSWG meeting – 10/21-23/2008 Metrics Planning and Reporting (MPAR) WG Breakout Summary H. K. (Rama) Ramapriyan NASA GSFC Clyde Brown NASA LaRC Co-Chairs,
1 Network Measurement Summary ESCC, Feb Joe Metzger ESnet Engineering Group Lawrence Berkeley National Laboratory.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
EOSDIS User Registration System (URS) 1 GES DISC User Working Group May 10, 2011 GSFC, NASA.
User Working Group 2013 Data Access Mechanisms – Status 12 March 2013
EOSDIS FY2009 Annual Metrics Report Prepared By: Hyo Duck Chang Adnet, Inc. Brian Krupp Adnet, Inc. Lalit Wanchoo Adnet, Inc. March 2010.
Evaluating & Maintaining a Site Domain 6. Conduct Technical Tests Dreamweaver provides many tools to assist in finalizing and testing your website for.
EOSDIS FY2011 Annual Metrics Report Prepared By: Hyo Duck Chang Adnet, Inc. Brian Krupp Adnet, Inc. Lalit Wanchoo Adnet, Inc. February 2012.
Module 12: Responding to Security Incidents. Overview Introduction to Auditing and Incident Response Designing an Audit Policy Designing an Incident Response.
EOSDIS FY2008 Annual Metrics Report Prepared By: Ed Sofinowski SGT, Inc. Donna Rahmani SGT, Inc. March 2009 ESDIS Project GSFC Code 423.
MODIS SDST, STTG and SDDT MODIS Science Team Meeting (Land Discipline Breakout Session) July 13, 2004 Robert Wolfe Raytheon NASA GSFC Code 922.
Providing access to your data: Determining your audience Robert R. Downs, PhD NASA Socioeconomic Data and Applications Center (SEDAC) Center for International.
March 2004 At A Glance ITPS is a flexible and complete trending and plotting solution which provides user access to an entire mission full-resolution spacecraft.
Metric Studio Cognos 8 BI. Objectives  In this module, we will examine:  Concepts and Overview  An Introduction to Metric Studio  Cognos 8 BI Integration.
John S. Otto Mario A. Sánchez John P. Rula Fabián E. Bustamante Northwestern, EECS.
HPHC - PERFORMANCE TESTING Dec 15, 2015 Natarajan Mahalingam.
9 Systems Analysis and Design in a Changing World, Fifth Edition.
1 Deploying Measurement Systems in ESnet Joint Techs, Feb Joseph Metzger ESnet Engineering Group Lawrence Berkeley National Laboratory.
CRMUG SIG: Public Sector Using Knowledge Base features to Document Processes and Procedures.
A Solution for Maintaining File Integrity within an Online Data Archive Dan Scholes PDS Geosciences Node Washington University 1.
1 The XMSF Profile Overlay to the FEDEP Dr. Katherine L. Morse, SAIC Mr. Robert Lutz, JHU APL
Sponsored by Portakal Technologies
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
IT Roles and Responsibilities
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Presentation transcript:

Metrics and Monitoring Capabilities for Earth Science Data Systems ESDSWG Wilmington, Delaware October 20-22, 2009

Outline Core and Community Capabilities Network Flow Requirements and Monitoring Science Data Production and Distribution Transitioning from Community to Core

Core and Community Core –Data system elements needed to ensure processing, archival and distribution of data collected by EOS designated Earth science missions in a timely and usable manner Community –Data system elements developed and deployed largely outside the NASA core elements characterized by ‘evolvability’ and innovation with the potential to be integrated into the core

Metric and Monitoring Capability Comparison CapabilityCoreCommunity* Network Flow Requirements X Requirement Monitoring X Active Network Testing and Problem Resolution X Science Data Production XX Science Data Distribution XX Science Service Usage and Demographics XX * Limited Capabilities. Sometimes core/community overlap.

Network Flow Requirements Science data flow requirements are formulated to support nominal and reprocessing efforts. Science teams, processing and archival facilities, among others’, are responsible for requirement development. Requirements are stored in documents under configuration control. Requirements are constantly evaluated.

Network Monitoring Includes both passive and active network monitoring tools that gather network statistics, populate the information into a database, and provides tools to analyze the data to: –Assist in troubleshooting performance problems –Track utilization of network resources –Verify requirements against actual –Help forecast required upgrades

ENSIGHT DB Collector Passive performance data (utilization, CPU pct., NetFlow, etc.) provided to collector Passive monitoring information (graphics, statistics, HTML) pushed to secured web server Secured ENSIGHT Web Server Proxied Performance web-site (HTML) EBNet Data Center Limited access EBnet Engineering hosts Interactive Live-monitoring, Flow graphs and reports Passive Monitoring System Overview Proxy Web Server Data Center Data Center Data Center

SNMP Object Monitoring Similar to MRTG Data stored and available via SQL Web front-end permits control of collection and graphing

Examination of FTP transfers between two networks One hour time period examined Ex.: Used to troubleshoot slow FTPs, and exonerate network Custom Flow Graph

Network Flow load is tracked on local LAN TCPdump data is collected, extrapolated Graph indicates load on WAN, LAN caused by Network Flow Rarely more than 15K bits/ second for 4 routers Tracking NetFlow Impact on Network Resources

ENSIGHT Active Testing Overview End-to-end user level test –Little or no visibility into network internals Purposes –Assess whether networks as implemented meet EOS requirements –Assess whether existing networks can support intended applications –Resolve user complaints: Network problems -- or somewhere else?? Determine bottlenecks -- seek routing alternatives –Provide a basis for allocation of additional resources

ENSIGHT Users Active Testing: System Overview Secured ENSIGHT Web Server, and B/U database Test Destination 1 End-to-end iperf (or other) active network performance measurement Active performance measurement results (throughput, packet loss, etc.) provided to collector Periodic SCP fetch of external Active performance results Performance graphics provided to secured web server Performance web-site (HTML) Test Source 1 Test Source 30 Test Destination 80 oooooo oooooo ENSIGHT Active Collectors (Primary and B/U) ENSIGHT Database (primary) Security Perimeter

Integrated Charts The problem: Neither iperf nor MRTG alone is sufficient to characterize the performance of a circuit –MRTG will be low if users are idle –But Iperf results will appear low if competing with active user flows Solution: Add the iperf and MRTG measurements together. –But there are some difficulties Improved Solution: Add the iperf and applicable Flow data –Flow data can be obtained for small time periods –But still susceptible to interference

Production and Distribution Monitoring ESDIS Metric System (EMS) is used to track core components. MCT is used to track community projects (e.g. MEaSUREs)

EMS Overview Automated collection, lookup, QA and reporting Web based reporting interface Users

EMS Implementations OGPB TBD

FY08 Overview

FY08 Science Operations

FY08 Science Distribution *OBPG data taken from the Ocean Color web site

Distribution Trends *OBPG data taken from the Ocean Color web site

FY08 Science Data Users

FY08 Web Usage

MCT Overview Web form for capturing metrics from community projects. Projects manually enter data into form, typically monthly. Web-based reporting interface for Program sponsors, PIs and NASA Managers. Community recommends modifications to metric questions annually at the ESDSWG. Metrics 1. Number of Distinct Users 2. Characterization of Distinct Users Requesting Products and Information 3. Number of Products Provided 4. Number of Product Types Available 5. Volume of Data Distributed 6. Volume of Data Available 7. Delivery Time of Products to Users 8. Support for the SMD Science Focus Areas 9. Support for the SMD Applications of National Importance 10. Support for SMD Education Initiatives (when applicable) 11. Number of Services Provided 12. Number of Service Types Available 13. Project Defined Metric 1 - Optional

MCT Transition The Metric Collection Tool is being replaced. Why Change –Consolidate data, support and sustaining engineering. –Ensure archival of metrics. –Single metric reporting interface. When –Prototype now available. –Soliciting comments and testers. –Hope to have the tool available in January Help us name it ….

Transitioning Community to Core Some community projects datasets, tools and/or services may transition to core capabilities. Technical approaches to handle this transition (from a metrics perspective) are being implemented through the consolidation of metric gathering tools.

MCT Prototype Demo