BAA for Advancement of Technologies in Equipment for Use by Special Operations Forces (Solicitation Number: BAAST-12) U.S. Special Operations Command (USSOCOM)

Slides:



Advertisements
Similar presentations
Office of Small Business Programs
Advertisements

Rapid Innovation Fund (RIF) Dan Cundiff Deputy Director, Comparative Technology Office of the Assistant Secretary of Defense (Research and Engineering)
SMALL BUSINESS PLAN GUIDE
Project Management.
1 UNCLASSIFIED Mr. J. Frank Wattenbarger Director, Advanced Technology Directorate TECHNOLOGICAL CAPABILITIES FOR THE GLOBAL WAR ON TERRORISM 5 February.
EE 496 Poster Session Instructions Rev. 2/9/15 WS.
Update to AABE on DOE Smart Grid Investment Grants and Smart Grid Regional Demonstrations Christopher Irwin Smart Grid Standards and Interoperability Coordinator.
AFG Enterprise Proposal Writing Tips Spring 2006 Semester02/22/2006.
EEC 693/793 Wireless Sensor Networks A Short Name of your Paper’s Title Student Name.
Moody F061 ISE Conceptual System Design “Sets the Stage” State the problem Identify the need Conduct advanced system planning & feasibility analysis.
Writing a Research Proposal. Need of Proposal Term Paper, Capstone Project, Thesis, etc. External or Internal Funding Solicited Unsolicited Others.
UNCLASSIFIED//FOR OFFICIAL USE ONLY DISTRIBUTION STATEMENT C: Distribution authorized to Department of Defense (DoD) and U.S. DoD Contractors only. This.
M.Sc Projects David Wilson M.Sc Projects Coordinator for Computing & Information Systems.
Melodie Cameron, MA Adapted and Presented by Dr. Elena Klaw.
Project Management and Scheduling
Commerce, a.s., Bratislava
 Materials – Highest & Best Use  Public Health  Safety  The Environment  Safety  Reliability  Performance  Flexibility  Productivity Improve Mobility.
Introduction to Interactive Media 02. The Interactive Media Development Process.
A Secure Frontline September 25, 2003
Operational Capability: An underlying simplification of a data encoding standard has been developing over the past decade and is being demonstrated in.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
EE x12 Technical Reports Writing Lecture 7
Operations Security (OPSEC) Introduction  Standard  Application  Objectives  Regulations and Guidance  OPSEC Definition  Indicators.
D E F E N S E A D V A N C E D R E S E A R C H P R O J E C T S A G E N C Y M. Connie Jacobs Program Manager Small Business Innovation Research Program (SBIR)
Summary - Part 1 - Objectives The purpose of this basic IP technology training is to explain video over an IP network. This training describes how video.
PROPOSED PROJECT TITLE Company, Principal Investigator, Phone, Contract Cost Short term goals: what will be accomplished or delivered in this contract.
Team 2 Initial Proposal Meeting Pierson Team Lead & Systems Engineer Precision Company, Inc.
Presentation of projects’ ideas. 1. Madrid Network “A public-private network which aim is to contibute actively to position Madrid Region in the top.
Lockheed Martin Aeronautics Company Candidate Collaborative Projects for Net-Centric Application Michael F. Siok, PE Lockheed Martin Aeronautics Company.
U.S. Special Operations Command (USSOCOM) BAA for Extramural Biomedical Research and Development Solicitation: W81XWH-USSOCOM-BAA 12-1 Issued July 9, 2012.
January 2001 Submission doc.:IEEE /041r0January 2001 January 2001 Ed Callaway, Motorola Slide 1 Project: IEEE P Working Group for Wireless.
Advanced Controls and Sensors David G. Hansen. Advanced Controls and Sensors Planning Process.
Common Engineering Documents Inspection or trip reports Research, laboratory, and field reports Specifications Proposals Progress reports Instructions.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 AFCEE BAA Program – Funding Opportunities Adria Bodour, Ph.D. Technology.
Project Management and Risk. Definitions Project Management: a system of procedures, practices, technologies, skills, and experience needed to manage.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 16/25/2015 V2.
Title here Bullet point Jane A. Alexander, PhD Technical Consultant Doing R&D Business with the Federal Government.
PQRI Proposed Work Plan Title of Work Project Date of Submission to Steering Committee.
1 MTEC Overview for SMARTPROC 2015 Scott Savoie Vice President, Corporate Contracts, SCRA 20 November 2015.
The Telemedicine & Advanced Technology Research Center (TATRC)
UNCLASSIFIED 1 United States Special Operations Command Technical Industrial Liaison Office United States Special Operations Command Chemical Conference.
Quad Chart – Format Photograph or artist’s concept of the project end- item. Ideally, this will convey the main idea of the final capability/use of the.
Chapter 3 Conceptual System Design
Soldier/Vehicle/Communications Integration Marc-André Rochon Technical Specification Lead Integrated Soldier System Project September 21-22, 2010 Château.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
CRESST ONR/NETC Meetings, July July, 2003 ONR Advanced Distributed Learning Bill Kaiser UCLA/SEAS Wireless Networked Sensors for Assessment.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
GORT Planning/Guidance Session with LTG Barclay
ARTEMIS Industry Association Title Presentation - 1 e.g. SCALOPES e.g. SCAlable LOw Power Embedded PlatformS.
Objective: Develop hybrid biological semiconductors which are EMP resistant and whose electronic properties can be directly manipulated by environmental.
Publications Strategic Planning
Texas Law Enforcement Recognition Program
Quad Chart Template for FY18
Update from the Faster Payments Task Force
By Douglas D. Piirto, Ph.D., RPF October 2014
Proposal Writing.
Company Name Technology Title
Army S&T Systems Adaptive Red Team Technical Support & Operational Analysis (TSOA) Quad Charts 1.
Project Assignment Chris Allen
Enter Participant Organization here Enter System / Activity Name here
Quad Template (Replace above title with name of candidate technology.)
Project Title: Host Institution: <Name of Host Institution> PI:
Principal Investigator ESTCP Selection Meeting
Omnibus IV Contracting Strategy Michael D’Alessandro
Milestone Presentation Format
Technology/Capability Overview
AME Programmatic Letter-of-Intent
Guidance for Proposers Day Slide
Principal Investigator ESTCP Selection Meeting
Title or label as appropriate Operational and Performance Capabilities
Presentation transcript:

BAA for Advancement of Technologies in Equipment for Use by Special Operations Forces (Solicitation Number: BAAST-12) U.S. Special Operations Command (USSOCOM) This BAA addresses the areas of interest stemming from the needs for advancement in technology in SOF equipment and systems. USSOCOM is interested in receiving white papers from all responsible sources from industry, academia, and research laboratories capable of providing the development, design, and prototype fabrication and technology proof of functionality to meet SOCOM unique requirements. Offerors are advised to consider a limit of not more than $2 million total cost of development and not more than 24 months to complete all efforts for each submission.

Energy & Power  Improved batteries/energy storage  Power generation and management  Wireless power transfer C4  Antennas (concealable, conformal)  Encryption for mobile devices  Video compression  Data Transmission  Network technology  Data sharing/fusion Scalable Effects (Non-lethal technologies)  Stop, warn, deter, disorient, deny access (personnel, vehicles, equipment) Mobility  Advanced transparent armor Moving Target Lethality Signature Management Undetectable communications Topics Highlights: ISR  Persistent surveillance  Autonomous systems  High-resolution sensors SOF Small Unit Dominance  Detect, Locate, ID  Virtual Training  Avoid casualties  Situational awareness  Personal protection, combat casualty care Human Performance  Physical & mental effectiveness, cognition, resiliency  Injury prevention & rehab Biometrics & Sensitive Site Exploitation Lighten the Load Advanced materials, armor, textiles, electronics, batteries, etc.) Electro-optics/Night vision

*Due 13 July 2012 *White Paper Format - 5 pg. max Section A – Title, period of performance, estimated cost, name and address, technical and contracting points of contact, telephone and fax numbers. Section B – Task objective with description of work to be performed Section C – Technical summary and proposed deliverables. Include: *Anticipated period of performance and ROM cost (total cost + profit/fee, if any). *Short technical description of the concepts and plans to accomplish the technical objectives, and briefly describes the technologies to be pursued in the effort. *Any Independent Research and Development (IR&D) work underway at the company which may have direct application. *Address only the specific part of the BAA that you intend to accomplish. Section D – Quad Chart should include: (1) description of the technology effort with drawing or schematic; (2) technical performance required to achieve and complete the effort; (3) costs by deliverable, and schedule; (4) technical resources and team members. * Must also include a preliminary Technology Readiness Level (TRL) assessment of the proposed technology that conforms to the technology objectives, and an expected TRL at the conclusion of the effort. White Papers + Quad Chart

Sample Quad Chart