OC Fletcher Basin – Legacy Campus Project: Alternative MS4 Compliance Matt A. Yeager Yeager Environmental Mark Grey CICWQ Chris Crompton County of Orange.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Agua Hedionda Watershed Management Plan Copyright © 2005 Kenneth & Gabrielle Adelman. All rights reserved.
Charlotte-Mecklenburg Storm Water Services Welcomes ASU and the Town of Boone To Our Side of the Storm (How to manage the “perfect Storm”)
Regional Coordination for Implementation of Source Water Protection Projects October 24 th, 2013 Kelly Anderson Philadelphia Water Department’s Source.
Water Quality Issues for the Construction and Building Industry in 2014 A Presentation for the Orange County Business Council January 14, 2014 Mark Grey,
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Nutrient Trading Framework in the Coosa Basin Alabama Water Resources Conference September 6, 2012 A Feasibility Study of Nutrient Trading in Support of.
Santa Ana Region Stormwater Permit TMDL Requirements and Costs
U.S. Environmental Protection Agency Region 2 Green Infrastructure – Community Vision March 14, 2013 Ensuring safe and clean water for all Americans Ensuring.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Leon Creek Watershed Master Plan Leon Springs Business Association September 15, 2011.
Best Management Practice (BMP) Implementation & Planning Randy Vogel (AES Ecologist/IL Branch Manager)
Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant April 25, 2013.
The Story of the Hunting Creek Watershed. Hunting Creek is Impaired.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Tracie Billington, P.E. Chief Financial Assistance Branch Department of Water Resources.
Low Impact Development Guidebook Kent Gylfe
6 th Edition CCCWP Management Committee February 15, 2012.
Ross Valley Flood Control and Watershed Program Marin County Flood Control and Water Conservation District ~ Flood Control Zone 9 ~ Marin County Department.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Balancedgrowth.ohio.gov Best Local Land Use Practices Kirby Date, AICP Cleveland State University.
Integration Of Stormwater Master Plans with Watershed Plans The Link between Flooding and Development September 23, 2008 Bob Murdock, P.E., CFM.
Prioritizing Agricultural Lands for Riparian Buffer Placement in the Raritan Basin: A Geographic Information System (GIS) Model Project Partners: North.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
Background and Overview Stormwater NPDES Compliance For New Developments.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Putting the “LID” on Water Pollution New Water Quality Requirements for Land Use County of Orange Mary Anne Skorpanich Richard Boon.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Georgia’s Water Plan June 17, /09/08 Page 2 Agenda Plan Development Plan Overview.
Watershed Assessment and Planning. Review Watershed Hydrology Watershed Hydrology Watershed Characteristics and Processes Watershed Characteristics and.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Watershed Stewardship Program Marin County Watershed Stewardship Plan Marin County Department of Public Works.
Dr Richard Johnson, Mountain Environments, UK.  Lead Partner: Germany: Research Institute of Forest Ecology and Forestry  Partner countries: Germany,
Orange Creek Basin Management Action Plan Alachua County Commission December 11, 2007 Fred Calder, FL DEP (850)
Developing Final Phase II WIPs and Milestones Jim Edward EPA Deputy Director Chesapeake Bay Program Office DDOE Meeting with Federal Partners February.
Bassett Creek Water Management Commission Joint Advisory Group Meeting January 23, 2001.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Lake County Watershed Management Board Funding Program Mike Prusila, CFM, Watershed Planner.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
SFEP/EPA Proposal Background- prior NBWA grant EPA Funds and Process SFEP Process EPA Approval and Schedule NBWA Proposal-$1.5 Million Other Funds.
1 Status of AC Input from Last Meeting. 2 Overview  Input received on Strategic Planning Elements (Mission, Vision, Guiding Principles) & the 7 Key Content.
Stormwater Regulations and Impacts on Industry Integrated Regional Water Management Regional Advisory Committee (RAC) Meeting #45 Ed Othmer PE, CPESC,
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
URBAN STORMWATER: A PERFECT STORM FOR CHANGE Jon M. Capacasa Director, Water Protection Division EPA Region III.
Greener Cleanups in the Region 10 PCB Program Michelle, Mullin R10 PCB Coordinator Clu-In Webinar November 17, 2015.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Municipal Stormwater Permit Overview of Order R Issued by: California Regional Water Quality Control Board, San Diego Region NPDES No. CAS
Measure M2 Environmental Cleanup Allocation Program.
Stormwater management…… …..not just a water quality issue Deb Smith, CA RWQCB, LA Region Deb Smith, CA RWQCB, LA Region.
1 Economic Analysis Steven Blum Alan T. Monji Environmental Scientist Region 9.
picture Renee Purdy, Environmental Program Manager Los Angeles Regional Water Quality Control Board Renee Purdy, Environmental Program Manager Los Angeles.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Integrated Regional Water Management Grant Program Implemented Jointly by Department of Water Resources and State Water Resources Control Board.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
Stormwater Control Transfer Program Overview January 31, 2018
Mulberry Watershed Management Plan
Stormwater Management Tools
Anne Arundel County Maryland
GREEN INFRASTRUCTURE PLAN FOR (Permittee)
Creating a water quality credit generating facility and accounting program for MS4 permit compliance flexibility: results of a case study analysis in Orange.
Alternative Compliance for New Developments
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
Presentation transcript:

OC Fletcher Basin – Legacy Campus Project: Alternative MS4 Compliance Matt A. Yeager Yeager Environmental Mark Grey CICWQ Chris Crompton County of Orange 2014 UCI WATER PIRE RETREAT January 25, 2014

Project Drivers for LID BMP Alternative Compliance Model Program  MS4 Permit (retention requirement for 85 th percentile storm event)  LID emphasis—NRDC and USEPA  Drought resilience-water supply augmentation  Sustainable land use planning/Integrated water resource planning

Orange County Background Work  Model Water Quality Management Plan-WQMP  Technical Guidance Document and Model WQMP preparation tools  Coyote Creek WHIMP (Opportunity Analysis)  LID BMP Capital and O&M Economics Case Studies  On-site LID BMP Installation and O&M Costs— Inform BMP feasibility and selection process; Understand cost range of LID program implementation

Current Project Approach  Case study analysis of Alternative Compliance Program Elements  Fletcher Basin Watershed and Regional Basin Retrofit  Campus Legacy Specific Plan  One step from implementation in Fletcher Basin—construction underway

Project Description  Develop LID BMP implementation case studies  Fletcher Basin  Watershed and Regional Basin Retrofit  Distributed on-site LID implementation  Campus Legacy Specific Plan  Develop several BMP implementation scenarios with infiltration at different scales within the project, including riparian corridor restoration  Now Regional in Scope with San Diego, SMC, and possibly SWRCB—ongoing coordination

Project Objectives  Develop a model alternative compliance implementation project  Administration and Agency roles  Determine equivalency of on-site retention; water retention value-currency for equivalency-water quality credits-water supply credits  Use environmental benefit estimates in value determination (wide range of benefits depending on type of LID BMP used; more than 20 in the LID literature)  Establish appropriate methods for calculation  Establish benefit priorities

Conceptual Model for Valuing Stormwater Retention LID BMPs Water Unit Value $ Infiltration BMP CostsBenefits Installation Property Operation & Maintenance Replacement Water Supply Water Quality Open Space Property Value Flood & Stream Protection

Conceptual Model for Valuing Stormwater Retention LID BMPs Water Unit Value $ Harvest and Use BMP CostsBenefits Installation Property Operation & Maintenance Replacement Water Supply Water Quality Open Space Property Value Flood & Hydromod Protection

Case Study Concept Used to Test Model Approach: Fletcher Basin Water Unit Value $ Regional Detention Basin -v- Decentralized LID BMPs CostsBenefits Installation Property Operation & Maintenance Replacement Water Supply Water Quality Open Space Property Value Flood and Hydromod Protection

Alternative Compliance Case Study Example: Fletcher Basin Watershed

Link to PIRE Project  Economic evaluation process-models for benefits other than those related to water supply augmentation or water quality compliance (recreation benefit, habitat benefit, open space, property value benefit, etc.)  Overall review of available evaluation methods  How to coordinate  Commitments—Scope of Work  Who, where, when?