1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy.

Slides:



Advertisements
Similar presentations
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Advertisements

Dianne Dundas Project Manager. Who we are & what we do. We are the only organisation which has been tasked by both Governments to boost North/South economic.
Sanitation is Business
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Energy Performance Contracting (EPC). Vic Government EPCs since projects covering 745 buildings saving 37% (average GHG saving) and $418 million.
Energy Savings Performance Contracting Presenters Name Energy Services Coalition
Service and Training. Our engineers and Instructors are all highly qualified and possess many years of experience with top manufacturers. Surveys Studies.
ISO 9001 : 2000.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
The EU Emissions Trading System (ETS) Rationale and Lessons learnt Artur Runge-Metzger Head of International Climate Negotiations, European Commission.
1 | ESPC Technical Assistance Team eere.energy.gov Welcome to Today’s Training for State and Local grantees on Energy Savings Performance Contracting:
There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
→ UK policy & targets Kyoto: reduce emissions of greenhouse gases by 12.5% below 1990 levels by UK targets: –Reduce carbon dioxide emissions by.
The Carbon Trust Taking Action on Cutting Carbon Emissions Dr Kathryn Vardy 9 th November 2007.
1 Energy Efficiency and Conservation in Thailand Department of Alternative Energy Development and Efficiency (DEDE) Ministry of Energy 6 th January 2005.
1 Energy Efficiency and Conservation in Thailand Department of Alternative Energy Development and Efficiency (DEDE) Ministry of Energy March 2005.
Cooperation to reduce developing country emissions Suzi Kerr (Motu) and Adam Millard-Ball (McGill) Motu climate change economics workshop, March, 2012.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
CSR Summit – Belief / Action / Results Scott Delzoppo October 31, 2007.
ENERGY EFFICIENCY IN THE INDUSTRIAL SECTOR: PRACTICAL SOLUTIONS.
PRLCE in APEC- 1/21 APEC Workshop on Renewable Energy Promotion and Pricing Mechanism September 2013, Taipei, Chinese Taipei The Development of Peer.
Marrying Business with LEEF Finance Base London 2013.
Practical Problems Experienced with Industrial DSM Projects Marius Kleingeld 15 August 2012.
DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM.
Phoenix Convention Center Phoenix, Arizona Data Center Energy Management Strategies Edwards AFB Data Center Consolidation ESPB Building Performance Data.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Roben Energy and Ewing & Associates Providing Innovative Solutions to Energy Problems.
Phoenix Convention Center Phoenix, Arizona M&V Contracting / Business Perspective Track 5: Project Financing Session 5: M&V: High- and Low-Level Perspectives.
Prof. Valeria Termini AEEGSI Commissioner CEER Vice-President CEER DSO WG co-Chair The Future Role of European DSOs 1.
CHINA’S PROJECTS PROPOSALS FOR SESSION 2 Sun Yang Department of International Cooperation National Energy Administration, China
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
KNX – the benefits. Schneider Electric 2 - IS&C – Aug Content ●Basic arguments ●Added value for: ●Investors ●Wholesalers ●Installers and System.
The Essential Energy Savings Performance Contracting Program Design South Carolina ESC November 29, 2012 Presented by: Jim Ploger.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Private Sewer Transfer David Walter Managing Director, Dyno Rod Drainage and Sewerage Service provision in the future.
UNIDO - Energy Efficiency Creating a Standard Framework for Sustainable Industrial Energy Efficiency Lorence Ansermet UNIDO Regional Office in South Africa.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
1/14 Next Steps for Participating Economies to Develop EE Urban Passenger Transportation 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.
EWG46 10.b. PREE & CEEDS - 1/8 The 46 th Meeting of APEC Energy Working Group (EWG) Da Nang, Viet Nam, November 2013 Cooperative Energy Efficiency.
EWG44 11.b. PREE & CEEDS - 1/9 The 44 th Meeting of APEC Energy Working Group (EWG) Washington, D.C., U.S.A., 7-8 November b. Peer Review on Energy.
Tata McGraw CHAPTER 4 Product and Service Design.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
NZ Forest Policy Project Working Party 3 Forest Products Processing and Marketing Led by Marcel Vroege.
1 CASE STUDY ON DEUTSCHE BANK MARKET RISK MANAGEMENT SUBMITTED BY SNEHA B. SHAH SUBMITTED TO MS. MUDRA MISTRY 1.
Market Development of ESCO in China Dai Cunfeng Chinese Renewable Energy Industries Association (CREIA) Adviser of EMC Association (EMCA)
Harmonizing Standards and Enhancing Technical Capacity in Measurement and Verification of Energy Savings of Projects or Organizations (Concept Note submitted.
REGIONAL ENERGY EFFICIENCY STAKEHOLDERS WORKSHOP COMESA/SADC – Examples of Best Practice Policies for EE promotion Presentation by Luc Kevo Tossou Energy.
APEC EGEE&C REPORT TO EWG 52
Energy Savings Performance Contracts & Energy Service Companies
Ksenia Petrichenko, Copenhagen Centre on Energy Efficiency
Guaranteed Energy Savings Performance Contracting
New EGNRET Concept Notes
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
INNOVATIVE FINANCIAL INSTRUMENTS TO SUPPORT ENERGY EFFICIENCY:
FUNDING FOR ENERGY UPGRADES
National Audit Office of China
An Integrated Industrial Policy for the Globalisation Era
The ESCO Retrofit Model Financing energy efficient HVAC improvements through ESCOs Stephane le Gentil - November 2017.
ESCO Committee of China Energy Conservation Association (EMCA)
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Delran Township School District
Importance of Standardization James Hammond, Standards Division
Stewardship in biotechnology
Presentation transcript:

1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy Research Centre

2/14 Introduction Concept for ESCO Value for the promotion of ESCO Highlight of CEEDS Phase 4 Key question to be solved Outline

3/14 Characteristics of ESCO An ESCO is a business that provides a wide range of solutions to reduce energy consumption for client energy consumers. A full ESCO business has the following characteristics: (1)it implements energy efficient technology and infrastructure, and sometimes energy supply measures; (2)it provides the capital to carry out the project; (3)it gets paid for its work from the energy cost savings (ESPC, Energy Saving Performance Contract)); (4)it maintains the efficiency monitoring system during the payback period.

4/14 Process for ESCO PhaseCustomerESCO Activity 1. PlanningConsider project motivation. 2. Project Development Review M&V Plan, Review Risk & Responsibility Matrix. Develop Initial Proposal, Develop Initial M&V Plan and Risk & Responsibility Matrix. 3. Negotiation and Award Evaluate M&V Plan(s). Witness DES and M&V activities. Perform Detailed Energy Survey (DES), Develop Baseline, Refine M&V Plan. 4. Implement DO Witness M&V activities. Review and approve reports. Commission Project, Submit Post-Installation Report, Submit Annual Reports

5/14 Operation of ESCO Energy Cost Before implement ESCO Project During ESCO Contract Period End of ESCO Contract Improvement Benefit of Customer Benefit of ESCO Initial capital cost and interest Benefit of Customer $

6/14 Energy Savings = Use Baseline - Use Post-Retrofit Energy Savings = (Use Baseline  Adjustment) - Use Post-Retrofit Costs Time ECMs installed here Baseline or adjusted baseline Baseline Measured or calculated performance Savin gs Definition of Energy Conservation

7/14 Option for M&V Options A&B are retrofit isolation methods. Options C&D are whole-facility methods. The difference is where the boundary lines are drawn. By IPMVP

8/14 Why ? ESCO 1.Provide professional design, construction, operation and maintenance – for technology integration 2.Handle the financial problem to reduce the burden of customer 3.Keep the system in the optimum operation condition 4.Maintain a good monitoring and reporting mechanism to fully understanding the real energy consumption for further improvement

9/14 Value of ESCO 1.Introduce the professional engineer to help the improvement the energy efficiency 2.Create a new energy service company to help the implementation of energy conservation policy 3.Encourage the energy user to improve their energy consumption system for cost and carbon emission reduction

10/14 Highlight for CEEDS Phase 4 1.A set of the two workshops to discuss the key issue for the promotion of ESCO in APEC Region 2.Support the participating economies to set up the roadmap and mechanism for the development of ESCO 3.Identify the key technology for the energy conservation or low carbon technology 4.Set up a platform for the experience exchange on the promotion of each economy

11/14 Key Questions to be Addressed (1/3) 1.Key policies to encourage private sector firms to become clients of the ESCO industry (such as tax credits, low interest loans, energy indexes for building or manufacturing process, etc.), this will create the market opportunity for ESCOs. 2.Set up infrastructure to support the ESCO industry (such as licensing, regulations, specifications, etc.) in order to ensure that there is mutual trust between ESCOs and their client firms.

12/14 Key Questions to be Addressed (2/3) 3.Upgrade the capabilities of professional engineer to support the ESCO industry (such as through changes to professional licensing, training courses, academic involvement, etc.) 4.Identify the measurement and verification (M&V) processes/regulations to increase the confidence of potential clients in the ESCO business (such as ensuring impartiality in energy saving performance verification, transparency for the system commissioning processes, etc.), thus ensuring that the reported energy and cost saving can be accepted by both parties.

13/14 Key Questions to be Addressed (3/3) 5.Support the R&D to develop the necessary technology for carrying out ESCO projects (such as monitoring and metering technology or instruments, energy conservation technologies/measures, low carbon energy supply technologies, etc.) in order to implement highly energy- efficient operations.

14/14 Thank you for your kind attention