Dam Safety Production Center (DSPC) Southwestern Division, USACE

Slides:



Advertisements
Similar presentations
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Advertisements

City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
HATCH, NM, Background Information Village of Hatch Case Study.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Preparing for the Rainy Season SFWMD Operations & Actions.
US Army Corps of Engineers BUILDING STRONG ® RIVER RESOURCES ACTION TEAM BOAT TRIP Upper Mississippi River (Pools 24, 25, and Mel Price) St. Louis District.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Environmental Assessment Public Meeting
Design of Hydraulic Controls & Structures
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Longmeadow Parkway Fox River Bridge Corridor
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
One Team Destined For Greatness US Army Corps of Engineers BUILDING STRONG ® Operations Division Mark Yuska Chief, Operations Division.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Savannah Harbor Expansion Project
Matt Schueler Civil Project Management & Programs
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Water Supply Planning Initiative State Water Commission November 22, 2004.
VILLAGE OF PATCH, NM, FEASIBILITY STUDY Village of Patch Case Study Seattle Environmen tal Planning Class June, 2009 US Army Corps of Engineers Albuquerque.
BUILDING STRONG SM Presentation to Society of American Military Engineers Arkansas Post St. Louis District Program Overview BY Michael G. Feldmann Assistant.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
US Army Corps of Engineers ® Southwestern Division Pacesetters – Army Strong – Engineer Ready! The U.S. Army Corps of Engineers and its Southwestern Division.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
US-169 / I-70 “North Loop” Planning Environmental Linkages Study Pre-Proposal Workshop.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Highlights  Describe Our Missoula Growth Policy Project  Relationship to Rattlesnake Neighborhood Plan  Next Steps.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
Savannah River Projects
Continuing Authorities Program
Potholes Supplemental Feed Route Project
Measure A Financial Oversight Committee August 7, 2013
Construction Management & Inspection
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Michigan Dept. of Environmental Quality Water Resources Division
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Illinois Waterway 2020 Consolidated Closure
I Street Bridge Replacement Project
Sacramento Environmental Commission January 2019.
Presentation transcript:

Dam Safety Production Center (DSPC) Southwestern Division, USACE What is it? A means to deliver enduring and essential dam safety solutions to high priority projects. Context: 91 dams (Southwestern Division) of which 39 are “actionable”, 40% of the entire risk in USACE. Clearwater Dam Cutoff wall Focus: Centralized source of Civil, Geotechnical, Structural, Geological, Hydraulics & Hydrology expertise: Leads the engineering aspects of the region’s Dam Safety Modification mission Supports a Risk Cadre dedicated to the Risk Management Center priorities Supports other dam and levee safety program missions as requested Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities)

Dam Safety Production Center (DSPC) Southwestern Division, USACE Major Activities Canton Dam Modification Pine Creek Dam Modification Addicks and Barker Dams Modification Dam Safety Modification Studies for Lewisville Dam and Amistad Dam (in support of the International Boundary Water Commission) Canton Dam Construction Assistance to Issue Evaluation Studies (IES) and Periodic Assessments (PA) across the Region Conducting Risk Assessments through a dedicated Risk Cadre across the country Conducting Construction Liaison oversight through an MOA with RMC/MCX. Wright-Patman Modification Alternatives Joe Pool Hydro-fracturing Risk Assessment Levee Screenings

Prairie Creek and Engineers Ditch Russellville, Arkansas Little Rock District, USACE Project Description: Small flood management project for the City of Russellville, Arkansas. The Sponsor is the City of Russellville. Project Background Flooding occurs in downtown commercial, residential, and public facilities in Russellville, AR. This causes traffic and safety hazards. Capacity of culverts along Prairie Creek and Engineers Ditch are inadequate for current city growth, causing detention of flow. Undersized pump and sump station become overwhelmed from rainfall and run-off. Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities) 500 Year Flood Map Planning Objectives: Reduce overall flood damages in the project area Reduce risk to life and safety in the project area Environmental Operating Principals are being considered throughout the study.

Prairie Creek and Engineers Ditch Russellville, Arkansas Little Rock District, USACE Project Summary: In July 2010, the City of Russellville, Arkansas requested the U.S. Army Corps of Engineers Little Rock District conduct a flood damage reduction study under the authority of Section 205 of the Flood Control Act of 1948. The Corps of Engineers signed a cost sharing agreement with the City of Russellville on 20 April 2012 to complete this feasibility study. Measures and alternative plans were developed and evaluated based on appropriate engineering, economic, environmental, cultural, and social factors. Measures considered included bridge removals, bridge replacement, channel redesign, and adding culverts and detention basins. The tentatively selected plan includes replacing bridges, redesigning channels, and adding new culverts. Commerce St. looking North Benefits: Annual benefits of approximately $2 Million dollars (Damages reduced) will be realized. 10% of structures will be removed from the 100 year flood plain. The population living and working in the downtown Russellville will be positively affected by reduced flooding.

Watershed Map

Prairie Creek and Engineers Ditch Concrete-lined channel within project area

Prairie Creek and Engineers Ditch Undersized box culvert at W. Main Street, looking south

Prairie Creek and Engineers Ditch Commerce Street bridge looking east

Prairie Creek and Engineers Ditch City mall flooding

McClellan-Kerr Arkansas River Navigation System Dredge Material Management Plan Update The 445-mile long McClellan-Kerr Arkansas River Navigation System (MKARNS) consists of 18 locks and dams, provides 9-foot depth inland navigation from the Mississippi River to Catoosa, Oklahoma. The MKARNS Dredge Material Management Plan (DMMP) was last prepared in a Letter Report dated July 1995 (known as the Long Term Management Strategy or LTMS for Disposal of Dredged Material). The recent White River National Wildlife Refuge Dredge Disposal areas issues (questionable capacity remaining at both disposal sites; and incompatibility issue described in the 2012 USFWS Compatibility report for the White River National Wildlife Refuge—conflict between USFWS mission and Corps’ Navigation mission on Wildlife Refuge lands) has led to the need to update the MKARNS DMMP. Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities)

McClellan-Kerr Arkansas River Navigation System Dredge Material Management Plan Update Facts:   1. The Project Delivery Team has been formed for the DMMP Update and Project Management Plan completed. 2. The scoping phase was initiated with a call for agency comments in October 2013. An agency scoping meeting was conducted in July 2014. 3. The District received funding in the amount of $100K in FY14 to continue work on this project. Prepared by: John Balgavy, CESWL-OP, 25 July 2014 Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities)

Montgomery Point Lock & Dam Debris Issue Montgomery Point Lock and Dam is located at mile 0.5 of the McClellan-Kerr Arkansas River Navigation System MKARNS. The facility was placed into service in 2004 and consists of a navigation lock, navigation pass with crest gates, and fixed embankment section.   Overview of Montgomery Point area (December, 2012) Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities)

Montgomery Point Lock & Dam Debris Issue Facts: At tailwater elevations of 115.0 or less, the crest gates are raised, and navigation traffic passes through the lock. At tailwater elevations greater than 115.0, the crest gates are lowered and navigation traffic transits over them in the navigation pass. Based on data between calendar years 2005 and 2013, the lock was used for an average of 2 distinct periods and 50 days per year (about 14% of the time). That includes three years (2009-2011) in which no lockages occurred. 2. The top of the lock wall is at elevation 138.0, and tailwater elevations above that level inundate all of the lock structure, except for the control tower. High tailwater is generally attributed to a high level on the Mississippi River in the area. Based on data between calendar years 2005 and 2013, the lock went underwater an average of 3.7 times for 101 days total for the year (about 28% of the time).   3. With each inundation comes a large amount of sediment in the lock chamber and downstream approach, generally attributed to backwater from the Mississippi River, and a large amount of debris and sediment from the White River. Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities)

Montgomery Point Lock & Dam Debris Issue Facts: After each inundation event and when a return to lock operations is likely, the District mobilizes plant and personnel to remove debris and sediment to allow for safe lock operations and navigation traffic. In FY13, approximately 7000 man-hours and 100 plant days were necessary to clear the debris and sediment. In FY 12, approximately 2150 man-hours and 40 plant days were used, and in FY11, approximately 1800 man-hours and 36 plant days. This significant commitment of plant and personnel to remove debris and sediment was not foreseen during planning for the project. With the need for this plant and personnel for critical repair needs on system infrastructure, a long-term solution to the debris and sediment issue at Montgomery Point is necessary. 6. Subject to availability of funding, a study in conjunction with the USACE Engineering Research and Development Center is planned to address alternative engineering and operational solutions to address the problem. The cost of the study is estimated at $400K.   Prepared by: John Balgavy, CESWL-OP, 25 July 2014 Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities)

Montgomery Point Lock & Dam Debris Issue Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities) Upstream Lock Approach (Dec, 2012) Upstream Lock Approach (July, 2014)

Montgomery Point Lock & Dam Navigation Difficulties at High Flows Montgomery Point Lock and Dam is located at mile 0.5 of the McClellan-Kerr Arkansas River Navigation System (MKARNS). The facility was placed into service in 2004 and consists of a navigation lock, navigation pass with crest gates, and fixed embankment section.   Montgomery Point Lock Existing Flow Condition (Excerpted from Technical Report M55, USACE, St. Louis) Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities)

Montgomery Point Lock & Dam Navigation Difficulties at High Flows Facts: 1. At tailwater elevations of 115.0 or less, the crest gates are raised, and navigation traffic passes through the lock. At tailwater elevations greater than 115.0, the crest gates are lowered and navigation traffic transits over them in the navigation pass. Based on data between calendar years 2005 and 2013, the lock was used for an average of 2 distinct periods and 50 days per year (about 14% of the time). That includes three years (2009-2011) in which no lockages occurred.   2. The White River Entrance Channel (WREC) of the MKARNS is considered to extend from the mouth of the White River (Navigation Mile 0.0) to downstream approach to Norrell Lock (NM 10.3). 3. Mariners experience difficulties in navigating the WREC when a high water surface differential (i.e. the difference in elevation between the tailwater at Norrell and the headwater at Montgomery Point) exists. Generally, the concern is an outdraft condition for down bound vessels. At higher differentials (e.g. >5.0’) and with crest gates fully down, a hydraulic jump (i.e. a sudden vertical drop in the water surface) occurs over the crest gates that negatively affects up bound traffic. Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities)

Montgomery Point Lock & Dam Navigation Difficulties at High Flows Facts: 4. At differentials greater than 3.0-feet and in conjunction with the Arkansas River Emergency Response Team (USACE, USCG, and Industry reps), a set of restrictions has been implemented:   3.0 – 4.5-feet: 12-barge limit on down bound tows 4.5 – 5.0-feet: 9 barge limit on down bound tows 5.0 – 5.9-feet: 4 barge daylight limit and 2 barge night time limit on down bound tows 6.0-feet or greater: ARERT will meet and develop restrictions on a case-by-case basis 5. Based on data between calendar years 2005 and 2013, the differential is greater than 3’ about 22% of the time; 4.5’ about 14% of the time; 5’ About 11% of the time, and 6’ about 8% of the time. During that period, the highest differential was about 10.7’ (Sep 2012). To ensure continued safety of vessels transiting the area, a long-term solution to the outdraft issue at Montgomery Point Lock and Dam needs to be implemented.  Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities)

Montgomery Point Lock & Dam Navigation Difficulties at High Flows Facts: 6. In 2011 and in conjunction with the Corps’ St. Louis District, modeling was conducted on multiple alternatives to address the outdraft condition. (See CEMVS Technical Report M55, Montgomery Point Lock and Dam HSR Model, White river Miles 4.0 – 0.0, Hydraulic Sediment Response Model Investigation.) The recommended alternative (#27) requires removal of four existing weirs and approximately 2019-feet of dike and revetment and construction of 10 bendway weirs at elevation 102.0. Total cost of the project is estimated at approximately $4M. Subject to availability of funding, the project to make these changes will proceed.   Prepared by: John Balgavy, CESWL-OP, 25 July 2014 Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities)

Interstate 30 Bridge Rehabilitation or Replacement BACKGROUND: The Arkansas Highway and Transportation Department (AHTD) recently initiated the Interstate 30 (I-30) Planning and Environmental Linkages (PEL) Study which will evaluate potential transportation improvements along I-30 in central Arkansas. As part of this study, the I-30 bridge will be evaluated for rehabilitation or replacement. In 2003, Metroplan identified the need for transportation improvements for crossings of the Arkansas River. Some of the challenges identified include increasing traffic congestion and travel times, inadequate roadway capacity, roadway safety, and structural and functional deficiencies. The PEL will identify constraints such as impacts to the natural environment, impacts to adjacent neighborhoods and businesses, pier placement in the navigation channel, etc. PROJECT LOCATION: The I-30 Bridge crosses the Arkansas River at Navigation Mile 118.5. The study area for the PEL includes I-30 from I-40 in North Little Rock to I-530 in Little Rock, including the Arkansas River Bridge. PROJECT PURPOSE: The PEL process was established by the Federal Highway Administration to provide a more efficient process of identifying, evaluating and selecting preferred transportation improvements. The process allows early, planning-level decisions to be carried forward to accelerate future National Environmental Policy Act (NEPA) activities. The study will conclude in the summer of 2015 with recommended alternatives. AUTHORIZATIONS: The PEL is funded by the AHTD’s Connecting Arkansas Program (CAP). There are currently no other authorizations since the study was only recently initiated.

Interstate 30 Bridge West elevation view

Interstate 30 Bridge South elevation view

Interstate 30 Bridge South elevation view

Broadway Bridge Replacement between Little Rock and North Little Rock BACKGROUND: The Arkansas Highway and Transportation Department (AHTD) plans to replace the Broadway Bridge with construction to begin in late 2014. Construction will require 18-24 months. The existing bridge was opened in 1923 and was modified to accommodate the MKARNS in 1974. The vertical clearance for the new bridge will be the same (62.4 ft) as the existing bridge. The horizontal clearance will be 396 ft; existing horizontal clearance is 332.2 ft. The new bridge will be demolished with explosives, dropped into the Arkansas River, and then recovered. Only minor interruptions to commercial navigation are anticipated. The new bridge will be a plate girder design consisting of two 448-foot basket-handle, network, tied arches that span the Arkansas River. PROJECT LOCATION: The Broadway Bridge is part of U.S. Highway 70. It extends over the Arkansas River at Navigation Mile 119.1 and connects the downtown areas of Little Rock and North Little Rock. PROJECT PURPOSE: The overall purpose is to replace a bridge that is structurally deficient due to the condition of the deck, superstructure and substructure, and is considered functionally obsolete due to its existing roadway and deficient access ramps. The new bridge will better serve motorists, cyclists and pedestrians. AUTHORIZATIONS: The AHTD and Federal Highway Administration prepared the Environmental Assessment and Finding of No Significant Impact. The new bridge will be authorized by the U.S. Coast Guard under Section 9 of the Rivers and Harbors Act. The Corps of Engineers issued the Section 404 of the Clean Water Act (CWA) authorization and the Arkansas Department of Environmental Quality issued the Section 401 of the CWA individual water quality certification. The Arkansas State Historic Preservation Officer cleared the project for historical and cultural resources.

Broadway Bridge Replacement Existing Bridge

Broadway Bridge Replacement Proposed Bridge

Broadway Bridge Replacement Proposed Bridge View South

McClellan-Kerr Arkansas River Navigation System 12-Foot Navigation Channel Project Little Rock and Tulsa District, USACE What is it? Deepen the navigation channel to a minimum depth of 12-feet throughout the system. Project History Energy & Water Development Appropriations Act of 1999 – Initiated a Reconnaissance Study ($84k) Feasibility Study – Initiated in 2000 ($8.3M) Energy & Water Development Appropriations Act of 2004 – Authorized a Project Depth of 12 feet. Final Environmental Impact Statement & Record of Decision – Signed September 2005 Consolidated Appropriations Act of 2005 (Omnibus Bill) – Included $7 million in O&M funds Zink Island Structure & Business Process - Brief (three to four sentences) on planned center structure and business process (i.e virtual with x direct staff and remaining virtual, or all physical and stand alone center, infrastructure type center with specific centralized activities, etc..) Staffing Current Staffing: (Current Staffing Levels (include major positions fills)) 3-12 Month Plans: (Plans for near term (next few months) and FY staffing fills) End State: (End State of Staffing.) Activities: Major (Current major activities) Upcoming (Upcoming activities) Benefits: 25% Increase in Tonnage by Barge on System Benefit-to-Cost Ratio (BCR) of 1.7 at 3.75% with $8,677,200 in Next Excess Benefits; BCR at 1.1:1 at 7% $16,607,300 in Annual Benefits Corps of Engineers and Environmental groups collaborated on the project

McClellan-Kerr Arkansas River Navigation System 12-Foot Navigation Channel Project Little Rock and Tulsa District, USACE Major Features and Sub-Features of Project Channel Dredging Dike Notching (Improves Fish Habitat) Rock Removal Revetment Re-Design Mitigation (Expand Fish Habitat in Back Channels & Creates Fish & Wildlife Habitat along the Riparian Corridor)