The North Carolina Dam Safety Program. Our Responsibilities Administration and enforcement of the Dam Safety Law of 1967 and the supplementary Administrative.

Slides:



Advertisements
Similar presentations
NEW JERSEY DAM SAFETY RULES AND REGULATIONS. What is a dam? "Dam" means any artificial dike, levee or other barrier, together with appurtenant works,
Advertisements

Jason Thom MADCS – October Handy Reference – THE place to look it up Identify Safe Procedures Operation Records Past records can be invaluable Maintenance.
Transport Canada Submission to the Nunavut Impact Review Board Respecting the Meadowbank Gold Project March 2006.
NJDEP Right to Enter Pete Madan Greg Davis. N.J.S.A 2C:29-1 Obstructing Administration of Law or Other Governmental Function.
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
Supervision and Administration
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Notices of Violation, Orders to Cease Operation and Consent Orders.
Sedimentation and Erosion Control
Sharif University of Technology Civil Engineering Department Tehran-Iran Dam Safety An Approach to Prevent Dam Incidents.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Tailing Dams – A Consultants Perspective
The State Water Project, Unauthorized Encroachments and the California Water Code State of California Department of Water Resources Division of Operation.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
2 Lakeside Drive, Pawling NY 12564
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
The North Carolina State Dam Safety Program By: Tami Idol, EI
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
Emergency Response: Preparing for Disasters & Emergency Incidents June 2, 2015 Guest Secured Password: rangers!
Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
Certification Requirements
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
1-1 Roles and Responsibilities. 1-2 Module Objectives  Recognize the roles of LEOs and others in work zones  List LEO responsibilities and expectations.
Virginia Department of Conservation & Recreation Virginia Dam Safety & Floodplain Programs William G. Browning, Director Dam Safety & Floodplain Management.
1 Common Issues on Site Re-certification Training For Level IB Advanced Fundamentals Certified Inspector Issued May 2009.
10/1/ Air Quality Permitting Air Quality Committee William D. Willets, P.E. Engineering Supervisor DAQ Permitting Section May 7, 2014.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Emergency Action Plans for Dams in Texas An EMC’s Role With The EAP Presented By: Megan Dutton, P.E. TCEQ Dam Safety Program.
Impact of Low Volume Roads Downstream of Dams on Hazard Classification By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive,
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
SAGHA Annual Homeowners Meeting August 28, Agenda  Collect ballots  Treasurer’s Report  Common Area Maintenance Presentation  Election Results.
Policy for Maintaining Instream Flows in Northern California Coastal Streams Monitoring and Reporting Provisions for Water Rights Victoria Whitney Deputy.
OSHA – What to Expect When You’re Inspected (Following Federal Guidelines)
NC Rules and Requirements: Certified Inspectors of Subsurface Systems NC Certified Inspector Training School.
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
Workshop on Permanent Closure of Single-Walled USTs and Funding Opportunities For Closure and Cleanup.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
MS Dam Safety Program Dusty Myers, P.E. Chief, Dam Safety Division.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
NAPA COUNTY Conservation Development and Planning Department Code Compliance Flow Chart Building Code Violations 1 COMPLAINT Written complaint (form, letter,
EMERGENCY RESPONSE AND CONDEMNATION OF HOMES Michael Desrochers, Director of Fire Safety, Department of Public Safety Shaun Gilpin, Housing Policy Specialist,
Environmental Quality Board
STORM WATER MANAGEMENT
Enforcement of Floodplain Management Regulations
DIVISION OF MOTORIST SERVICES BUREAU OF DEALER SERVICES
Tennessee Safe Dams Program
Overview of the Division of Energy, Mineral, and Land Resources Presented By: Tracy E. Davis, PE, CPM Director, DEMLR September 12, 2013.
National Association of State Conservation Agencies
INDOT Storm Water Management
MS4 OVERVIEW 2015.
City Council Meeting November 14, 2016
Air Quality Permitting
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
Annual Enforcement Report Overview
Presentation transcript:

The North Carolina Dam Safety Program

Our Responsibilities Administration and enforcement of the Dam Safety Law of 1967 and the supplementary Administrative Code Inspection program Inspection program Permitting program Permitting program Enforcement program Enforcement program Minimum release to maintain aquatic habitat Minimum release to maintain aquatic habitat Emergency Response Dam Safety Emergencies can happen any time Dam Safety Emergencies can happen any time Hurricane Season June through November Hurricane Season June through November Our role is officially as technical advisor to professional “first responders” Our role is officially as technical advisor to professional “first responders” We are often the first agency to know about and respond to a potential dam safety emergency We are often the first agency to know about and respond to a potential dam safety emergency Owner /engineer education and public awareness

By What Authority Do We Operate NCGS (The Dam Safety Law of 1967). Declaration of purpose. - It is the purpose of this Part to provide for the certification and inspection of dams in the interest of public health, safety, and welfare, in order to reduce the risk of failure of dams; to prevent injuries to persons, damage to downstream property and loss of reservoir storage; and to ensure maintenance of minimum stream flows of adequate quantity and quality below dams.

Where are we located? We have seven regional offices and a central office in Raleigh.

Jurisdictional Dams IF the dam is 15 feet in height or greater as measured from the highest point on the crest of the dam to the lowest point on the downstream toe, AND the dam has an impoundment capacity of 10 acre-feet or greater at crest of dam elevation BUT, Dams that are classified high hazard are under the jurisdiction of the law regardless of height and impoundment capacity.

.0223 DAM HEIGHT AND STORAGE DETERMINATION (a) For the purpose of determining size classification, the height of a dam shall be measured from the highest point on the crest of the dam to the lowest point on the downstream toe. (b) The total storage capacity of a dam shall be that volume which would be impounded at the elevation of the highest point on the crest of the dam.

Hazard Classifications Class A (low hazard) Interruption of road service, low volume roads (less than 25 vehicles per day) Interruption of road service, low volume roads (less than 25 vehicles per day) Economic damage less than $30,000 Economic damage less than $30,000 Class B (intermediate hazard) Damage to highways, Interruption of service (25 to less than 250 vehicles per day) Damage to highways, Interruption of service (25 to less than 250 vehicles per day) Economic damage - $30,000 to less than $200,000 Economic damage - $30,000 to less than $200,000 Class C (high hazard) Loss of human life = Probable loss of 1 or more human lives Loss of human life = Probable loss of 1 or more human lives Economic damage - More than $200,000 Economic damage - More than $200,000 Probable loss of human life due to breached roadway or bridge on or below the dam = 250 or more vehicles per day Probable loss of human life due to breached roadway or bridge on or below the dam = 250 or more vehicles per day Environmental damage also considered (cost of cleanup) Environmental damage also considered (cost of cleanup)

How do we do our job? InspectionsPermittingEnforcement

How often do we inspect dams? NC Administrative Code (Title 15A Subchapter 2K) requires inspection of Class A (low hazard) and Class B (intermediate hazard) once every five years. NC Administrative Code requires inspection of Class C (high hazard) dams once every two years; however current Land Quality Section policy calls for inspection of Class C dams once a year. There are currently about 5,400 dams on the state inventory.

Permitting The Division of Land Resources is responsible for issuance of approvals to construct, repair, modify, or breach any non- exempt dam. All permitting is processed through the Raleigh Central Office, not the regional offices. Application processing fees are collected for construct, modify and breach project submittals as authorized by the state Dam Safety statute. General permits required for a dam project: Dam Safety Approval (to construct, repair, modify or breach) Dam Safety Approval (to construct, repair, modify or breach) Sediment and Erosion Control Approval (through regional LQS office or approved local program) Sediment and Erosion Control Approval (through regional LQS office or approved local program) USA-COE 404 Permit (wetland and stream destruction) USA-COE 404 Permit (wetland and stream destruction) NCDWQ 401 Certification (accompanies all 404 permits) NCDWQ 401 Certification (accompanies all 404 permits) NCDWQ Approval of stream buffer impact (in certain river basins) NCDWQ Approval of stream buffer impact (in certain river basins) Dam Safety Approval to Impound (upon project completion) Dam Safety Approval to Impound (upon project completion)

Enforcement Criminal Penalties (administered through the NC court system): not less than $100 and not more than $1,000 per violation which can be assessed per day for willful violation. Civil Penalties (assessed by the NCDENR Secretary): not less than $100 nor more than $500 per violation which can also be assessed per day for willful violation. Injunctive Relief (administered through the NC court system): restrains the violation by court order and/or requires corrective action. All of these actions are normally initiated by issuing a Dam Safety Order (DSO) from the Land Resources Division Director under authority of the NC Administrative Code. DSO’s are usually preceded by inspection letters and Notices of Deficiency (NOD’s).

SECTION OBTAINING APPROVAL FOR DAM CONSTRUCTION, REPAIR, OR REMOVAL The design, preparation of the drawings and specifications, inspection of the work performed on the dam, and certification that the dam was constructed, repaired, altered, or removed according to the approved plans and that the dam or its remains are safe shall be performed by an engineer registered in North Carolina and shall bear his professional seal.

What Is Considered Maintenance? Mowing Removing trees and bushes up to 6 inches in diameter (strongly recommended) Minor replacement of rip rap Releasing impounded water as through an existing outlet works or temporary siphon erected without excavation. Oiling valve operators or minor equipment repairs.

Repairs Requiring A Plan Riser replacement Filter drain replacement Slope repairs Removing trees over 6 inches in diameter Spillway repairs, replacements, or expansions Anything requiring excavation into the dam

Rights of investigation, entry, access, and inspection (§ ) Inspectors have the right to make entry onto property to perform inspections of dams at reasonable times. We welcome the owner of the dam being inspected to accompany us on the inspection. If the owner‘s telephone number is in our records, it is our policy to make an attempt to contact the owner prior to inspection.

Earth Dams Majority of Dams in North Carolina Safe if properly designed, constructed, and maintained Designed so as not to overtop

Earth Dam in Poor Condition

Overtopping Failure (reason for design storm requirements) Dam Failures

“Piping” failure (inadequate compaction during construction)

Dam Failures Seepage failure (flow through embankment or foundation) Sand boil

Emergency Action Plans (EAP’s) Required for high hazard dams Recommended for intermediate hazard dams Critical document to have available during a dam safety emergency (contacts and procedures) Contact Tami Idol in the Raleigh Central Office for additional information

Contact Information Bill Denton, EIT, Assistant Dam Safety Engineer Telephone: (919) Web: or just search for “NC Dam Safety” using your favorite internet search engine.

Questions?