On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

JOB ORDER CONTRACTING Contract Management Department 8/28/121.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Output & Performance based Road Contracts (OPRC)
LOS ANGELES UNIFIED SCHOOL DISTRICT JOB ORDER CONTRACTING Copyright © 2004 The Gordian Group, Inc. all rights reserved.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Contract and Grant Provisions and Administration Section 105 (Page 30) Title I The Act.
Back to the Future? Electrical/Lighting Contracts Ted Swansegar.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
1 Follow Up Items  What are Unbalanced Bids?  What are Best Value Contracts?  Analysis of Contract Approval Limits.
Ensure Vendor/Engineer of Choice Product Quality
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Indefinite Delivery/Indefinite Quantity (ID/IQ) Contracts Date: 24 Jan 07 POC:
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
RFP PROCESSES Contracts for Professional Services.
Chapter 3 Project Initiation
Marcy Mealy Procurement Specialist CDBG Program
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
PROCEDURES FOR SELECTING THE CONTRACTOR
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
EM15 – Contractors COST MANAGEMENT
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Old Policy – which no one ever seem to have heard of.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
JOB ORDER CONTRACTING CONSTRUCTION SERVICES FOR FACILITIES MAINTENANCE AND OPERATIONS April 26, 2014 Presentation for Presented by Troy Alexander Project.
AWPHD Legislative Summary House Bill 1196: Increasing the dollar limit for small works roster projects House Bill 1847: Increases bid limits for public.
Construction Contracts and Project Delivery Methods
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
Contract Training Class I
TYPES OF CONTRACTS.
2015 Traffic Signals 101 Topic 2 Agreements. Office of Traffic, Safety, and Technology Agreements Signal Agreements An Agreement is a contract between.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
A/E Acquisition Process 1 Architect – Engineer Acquisition Process Robert Theel – Director Arch. & Eng. Programs Division (Reg. 5) Regional Chief Architect.
Chapter 13 Estimates for Remodeling Work
Office of Procurement Services.  Vendor Application Website: 
Measurement and Payment
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
Dallas Area Rapid Transit Pre-Bid Conference Event #B Purchase and Install 5 Generators February 25, 2016.
PROCUREMENT Conservation District WDA “is not a procurement authority” We are not telling you how to purchase or procure materials or services,
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
CONSTRUCTION CHANGE DIRECTIVES UNDER THE NEW PUBLIC BID LAWS Speaker: STEVEN B. LOEB, Esq. BREAZEALE SACHSE & WILSON, LLP Tel: (225)
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Bus stop Amenity Cleaning April 13, 2016.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Light Rail Transit Project
Administration of a FIDIC Contract - Financial Management
OMI - THAMES WATER, INC ANNUAL SETTLEMENT STATEMENT CONTRACT YEAR 3
Costs and Economics of Construction
(Additional materials)
Department of Community Development
Request for Proposal & Proposal
Elements of Effective Signal Maintenance
Contractual Arrangement
Doing Business with Sno-Isle Libraries
Construction Contracts
Brieana Reed-Harmel, Broadband Project Manager
HOME AFFAIRS IDENTIFICATION SYSTEM (hanis)
Presentation transcript:

On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee

On-line Review of Contracts Reviewed 6 contracts from VA, TX, and CA that had different features and cost/bid options that ranged from $50k to $350k Some Interesting (I thought) Features Preventative Maintenance including a maintenance and inventory management system Engineering and design of ITS devices Mobilization limits (time charged before onsite) Minimum emergency response time with liquidated damages for late response

Contracting Options Professional Services Proposal Task Order/Indefinite Delivery Time and Materials Bid Price Contract Most were Hybrids

Professional Services Request for Proposals Selection based on qualifications Specific tasks and scope of work are defined in a request for proposals

Professional Services City of Novato example Broad Scope – “In general, the work to be done consists of providing preventative and routine traffic signal maintenance, emergency service and records and supervision for the maintenance of traffic signals.” Elements are further defined as are compensation parameters

Task Order/Indefinite Delivery There are three types of indefinite delivery contracts: definite quantity, indefinite-quantity, and requirements contracts. Requirements contracts and indefinite quantity contracts are also known as delivery order or “task order” contracts.

Task Order/Indefinite Delivery The contract must require the municipality to order and the contractor to furnish at least a stated minimum quantity of supplies or services. A task order contract must specify the period of performance, including the number of option periods, and must specify the total minimum and maximum quantity of supplies or services.

Task Order/Indefinite Delivery Fort Worth Example Scope - The major work will consist of the (approximate) following: permanent and temporary traffic signal installations, traffic signal modifications, minor roadway work, sidewalk, curb ramps, signing, and pavement markings the extent to which and locations of to be determined by the City on an as-needed basis, with work directives issued via task orders.

Task Order/Indefinite Delivery Fort Worth Example Unit prices are required and an estimated quantity defined.

Task Order/Indefinite Delivery Fort Worth Example – non-resident bidders:

Time and Materials – Wildamar, CA example Compensation for unscheduled maintenance work identified above will be paid at the hourly labor rates, and vehicle and equipment rates, in accordance with the Cost Proposal, Schedules B and C, included in this Solicitation

Time and Materials – Wildamar, CA example Emergency calls that require replacement of equipment will not require approval from City before such replacements are commenced. The contractor shall provide materials for permanent repairs, uses in the repair or replacement of City equipment. The City shall reimburse the selected firm for materials used for permanent repairs, in an amount equal to the cost of the materials including an agreed mark-up price.

Time and Materials – Wildamar, CA example The selected firm will work closely with City Staff throughout the duration of the contract. A firm will be selected for final negotiation of a contract based upon the following factors: Firm Information/Background: Information on the history of the firm, company background, and any negative history; Key Personnel/Staff Qualifications: Qualifications of the staff assigned to manage and provide services related to the project. Experience/References: Past experience and client references; Understanding of Scope of Work and Work Proposal: Proposed work approach to the project, including all tasks and services defined in the document, and a discussion on response to unscheduled or emergency work; Cost: A final contract shall be negotiated with the selected consultant on the basis of the submitted cost proposal and in consideration of reasonable and mutually agreed project costs and time requirements.

Cathedral City, CA - Preventative Maintenance Example Preventative Maintenance The City requires a Contractor to carry on a program of continuing comprehensive preventative maintenance designed to eliminate or reduce the incidences of malfunction, reduce operational complaints, and extend the useful life of the City owned traffic signal and safety light systems.

Bid Price – Cathedral City, CA Example City will compensate Contractor for routine maintenance at the contract lump sum price per signalized intersection, flashing beacon, radar feedback sign, illuminated crosswalk or safety light per month. Said compensation shall include all labor, materials, equipment, overhead and profits for routine service shall be included in the price bid, per intersection, per month, and no extra compensation will be allowed.

Bid Price – Cathedral City, CA Example Extraordinary maintenance shall be billed at the established rates per the approved contract and shall include all labor, materials, equipment and profit. All items not covered shall require a negotiated price and approval by the Director of Public Works or his authorized representative. All extraordinary maintenance in excess of $ requires an authorization prior to beginning the work.

Bid Price – Cathedral City, CA Example The selected Contractor must have on hand and operational an electronic database and asset management software package that will provide the City with remote electronic access to the database to review maintenance activity.

Thoughts? Good Idea? Types of Services? Types of Contract? Other Thoughts?

Findings Lots to think about Scope Professional Services Preventative Maintenance On-Call Services Contract Basis Professional Services Proposal Task Order/Indefinite Delivery Time and Materials Bid Price Contract Hybrid

Suggested JTC Action When in doubt, Form a Committee! Suggest a small committee of interested folks agree to make general recommendations at the May CCJTC for discussion. Committee continue to develop a bid document for further review with a target of obtaining a contract for FY2017.