ERTAC EGU Growth Model Executive Summary September 2012 1.

Slides:



Advertisements
Similar presentations
EPA’S DRAFT GUIDELINES TO STATES FOR THE DEVELOPMENT OF STATE 111(d) PLANS MIDWESTERN POWER SECTOR COLLABORATIVE JUNE 17, 2014 FRANZ LITZ PROGRAM CONSULTANT.
Advertisements

NJHEPS CO 2 Calculator Worksheet Overview Fall /27/2011.
ERTAC EGU MACE/MACW Case Study December 10, 2012 DRAFT - DO NOT DISTRIBUTE1.
1 John J. Conti Acting Director Office of Integrated Analysis and Forecasting Prepared for the Energy Technology System Analysis Program (ETSAP) Florence,
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Draft-Version #17 12/20/10 1 Preprocessing Steps: These steps can be done prior to the algorithm calculation loop beginning. PS1-Data input from BY CAMD.
BlueSky-EM, SMOKE and Data Linkages Andy Holland Carolina Environmental Program Symposium on Climate, Forest Growth, Fire and Air Quality Interactions.
Talat Odman and Yongtao Hu, Georgia Tech Zac Adelman, Mohammad Omary and Uma Shankar, UNC James Boylan and Byeong-Uk Kim, Georgia DNR.
Clean Air Act Section 111(d) Indiana Energy Association September 11, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department of Environmental Management.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
20% by 2030 The future of wind energy in New Zealand Eric Pyle, Chief Executive.
Annual Energy Outlook 2010 Electric Power NPC Presentation October 14, 2010.
ERTAC EGU Growth Code “Proof of Concept” USEPA Briefing Washington, DC December,
Sithe Global Power, LLC Toquop Energy Project. A 750 MW Coal fired electric generating plant Located 12 miles northwest of Mesquite, NV in Lincoln County.
Status of ERTAC EGU Growth Committee September 16 th 2013.
2018 CO 2 Emission Projections for the SESARM States Prepared by: Byeong-Uk Kim, Jim Boylan, and Keith Bentley GA EPD – Air Protection Branch October 22,
ERTAC 1DRAFT - DO NOT DISTRIBUTE. Presentation Overview 1.Process Overview and Timelines 2.Inputs 3.Algorithm Details 4.Results 5.Outstanding issues 2DRAFT.
ERTAC EGU Growth Tool Stakeholder Rollout Lake Michigan Air Directors(LADCO) Rosemont, IL May 20 th,
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
An Overview of the U.S. Electric Power Grid Generation Choices, Reliability, Challenges Tom Ferguson, P.E. Adjunct Instructor Dept. of Electrical Engineering.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Fig08_01 Goal: Want to generate 1000 MW (1x10 6 kJ/s) of Electricity.
HYDROPOWER. Objective: The student will be become familiar with the Corps policy for hydropower development. The student will be have a basic understanding.
DORIS MCLEOD AIR QUALITY PLANNER VIRGINIA DEQ 804/ ERTAC Tool Logic and Flowcharts.
Future Power Generation in Georgia Georgia Climate Change Summit May 6, 2008 Danny Herrin, Manager Climate and Environmental Strategies Southern Company.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
On the Model’s Ability to Capture Key Measures Relevant to Air Quality Policies through Analysis of Multi-Year O 3 Observations and CMAQ Simulations Daiwen.
OTR Results ERTAC EGU –RESULTS WEBINAR May 16,
ERTAC 1. P RESENTATION O VERVIEW 1. Process Overview and Timelines 2. Inputs 3. Algorithm Details 4. Results 5. Outstanding issues 2.
ERTAC Growth Approach - EGUs ERTAC-EGU Development Group - Webinar May 16, 2013 Robert Lopez, WI-DNR - Presenter.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
California Energy Commission IEPR Lead Commissioner Workshop University of California, Irvine August 17,
WRAP Update Patrick Cummins WESTAR Meeting September 23, 2005.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
Recent Enhancements to Quality Assurance and Case Management within the Emissions Modeling Framework Alison Eyth, R. Partheepan, Q. He Carolina Environmental.
Economic Analysis Proposed Scope ERCOT RPG Meeting September 17, 2010.
Ancillary Services Redesign Update ERCOT TAC Meeting /25/2015.
E.H. Pechan & Associates, Inc. 1 EDMS Purpose Regional Haze Rule Implementation Performance Monitoring Region-Wide Emission Inventory Analysis of Collected.
1 Spring Business Meeting Regional Haze SIP Development Survey San Francisco, California April 9, 2003.
NENG-Combined Cycle, New Unit Hierarchy, and Growth Rates.
EMISSIONS INVENTORY UPDATE Briefing for OTC Committees and Stakeholder Meeting September 13, 2012 Washington, DC Julie McDill & Susan Wierman 1.
Overview of Future Year Emissions Processing for CMAQ Modeling Urban, Regional Modeling and Analysis Section Division of Air Resources New York State Department.
Draft-Version #18 9/13/11 1 Preprocessing Steps: These steps can be done prior to the algorithm calculation loop beginning. PS1-Data input from BY CAMD.
EGU Forecasting Tool (Data Elements) Office of Air Quality (800) John Welch Senior Environmental Manager IDEM.
SLIDE 1 ELECTRICITY STATEMENT OF OPPORTUNITIES October 2011 PRESENTED BY MAGNUS HINDSBERGER.
Forecasting Power System Hourly Load and Emissions for Air Quality Modeling ERTAC-EGU Model Development Group – Webinar & Outreach slides Robert.
The Clean Power Plan.  Standards of Performance for GHG Emissions from New, Modified, and Reconstructed Stationary Sources (111(b)).  Carbon Pollution.
Regional Implications of the Clean Power Plan Lanny Nickell Midwest Energy Policy Conference October 6 th,
Overview of WRAP Emissions Projections
Growth and Control for LADCO Round2 Modeling
WRAP Update Patrick Cummins WESTAR Meeting September 23, 2005
NSPS Rulemakings for Greenhouse Gas Emissions
Source Apportionment Modeling to Investigate Background, Regional, and Local Contributions to Ozone Concentrations in Denver, Phoenix, Detroit, and Atlanta.
penetration of wind power
A Collaborative Process to Develop a 2016 Emissions Modeling Platform
Key Findings and Resource Strategy
EPA’s Power Sector Projections Use of 2016 Data
EPA Office of Air Quality Planning and Standards
ERTAC EGU Overview For the 2016 EGU workgroup
EGU Workgroup: 2016 beta Approach: Status: Next Steps / Milestones:
Patrick Cummins January 30, 2019.
Minerals & Energy Parliamentary Portfolio Committee
EPA Technical Analysis of NOx Combustion Controls in the West
Regional Haze SIP Status Report
Midwest RPO Fires Status
Cem Data Analysis And Use
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Presentation transcript:

ERTAC EGU Growth Model Executive Summary September

Origins and Methods of ERTAC ERTAC ad-hoc group convened to solve specific inventory problems. Membership: states, MJOs. ERTAC EGU project goal: Build a low cost, stable/stiff, fast, and transparent alternative to the IPM model to project future EGU emissions. Model development started 2 years ago. 2

Attributes of ERTAC Model Conservative predictions – No big swings in generation. Data intensive – needs substantial state-supplied data. Regional and fuel modularity. Calculates future hourly estimates based on base year activity. Test hourly reserve capacity. Can quickly evaluate various scenarios; e.g., retirement, growth, and control 3

Project Timeline Fall 2012 – completion of first version of model and production of an “East of the Mississippi” run with 2007 base year and 2010 AEO growth rates. November 2012 – presentation of the model to EPA and then to interested stakeholders – continued development of the model (next version) and production of 2011 base run with updated policy and growth inputs. 4

Example: Coal Fired Existing Unit, 800 MW Annual GR=1.018, Peak GR=1.056, Nonpeak GR=

Example: Coal Fired Existing Unit, 800 MW (zoom in view) Annual GR=1.018, Peak GR=1.056, Nonpeak GR= hour depiction for an individual unit 6 Inefficient hour in base year, 11,232 BTU/KW, FY uses standard heat rate.

NORTHEAST 2007 AND 2020 SO 2 NO x HI 7 Shutdowns w/ new clean units From state and generic units Controls plus clean new units AEO2010 says growth in coal

HI SOUTHEAST 2007 AND 2020 SO 2 NO x 8 GA multi- polluttant rule. Near 100% Scrubbed

SOUTH EAST USA 2007 AND 2020 NO x MIDWEST 2007 AND 2020 SO 2 HI 9

Future challenges for ERTAC Development of this model is a work in progress. How to deal with growth rates where the current system will not handle the load. Ensuring that input variables and model settings are reasonable. Selection of controls by the model is not easily automated – requires manual inputs. Updating input files is time-consuming. Converting output files to model-ready files. 10

ERTAC Summary Model is built and running well. Results are stable using historic data. Transparency allows a deep evaluation of model results. Execution of the model by 5 eastern region groups is giving consistent results. Ongoing input data improvement is needed. 11

ERTAC Summary The initial version of the model has been completed. The model is running well and results are stable. Transparency allows a deep evaluation of model results. 5 different groups in eastern regions are running the model with consistent results. Ongoing input data improvement is needed. 12

ERTAC Contact Information LADCO ◦ Mark Janssen- ◦ John Welch - ◦ Robert Lopez - MARAMA/OTC ◦ Julie McDill – ◦ Joe Jakuta - ◦ Danny Wong – Metro 4/SESARM ◦ Doris Mcleod – ◦ Lin Jin-sheng – ◦ Beyong Kim – 13