01-27-14 IDT Prep 01/24/2014. Announcement IDT 1/21 Preliminary Debrief Presentation on spp.org updated with Regulation Pre-selection data and graphs.

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

IDT Prep 01/20/ /21/14 IDT Reminders 1/21 IDT Call starts at 7:30 AM, 7 hour IDT begins at 8:30 AM –Tieline Drop –Regulation Pre-Selection.
Structured / Unstructured Market Trials Analysis Weekly Update Meeting 9/27/2013.
IDT Prep 02/27/2014. IDT 2/28 Reminders 2/28 IDT Call starts at 7:30 PM, 3.5 hour IDT begins at 8:30 PM IDT Debrief will be sometime between.
Resource Offer Commitment Parameters Structured Market Trials August 23, 2013 Gay Anthony SPP Market Design.
Recent ERCOT Events Lessons Learned
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 16, 2010.
1 Nodal Stabilization Market Call December 28, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
NSRS deployment April John Adams ROS – May 12, 2005.
1 Market Trials Outage Scheduling Qualifications Weekly Update April 02, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
1 Market Trials Open Market Participant Call Weekly Kick Off Sept 27, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
1 Cutover Market Call December 01, :30 AM.
1 Market Trials Update NATF June 1, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
Market Trials Weekly Update – Friday Meeting December 6, 2013.
Parallel Ops / Go-Live Checkpoint Weekly Update – Friday Meeting January 17, 2014.
Congestion Hedging Process Transmission Planning Summit September 21-22, 2011.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 4, 2013.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
Integrated Marketplace: Parallel Operations CWG – January 2014.
Market Trials Weekly Update – Friday Meeting November 15, 2013.
Structured / Unstructured Market Trials Bi-Weekly Update – Friday Meeting June 21, 2013.
Preliminary IDT Debrief 02/26/ Deployment Test Debrief Overall the Fourteenth Deployment test was a great success All of the BAs.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
Parallel Ops / Go-Live Checkpoint Weekly Update – Friday Meeting December 13, 2013.
Structured / Unstructured Market Trials Kick-Off Meeting May 31, 2013.
Lead from the front Texas Nodal 1 Texas Nodal EDS 3 Early Delivery System Plan TPTF April 02, 2007.
1 Market Trials Update NATF May 4, 2010.
14 Minute Ramp Period Testing Workshop June 30, 2009.
QSE Managers Working Group November 7 th 2011 NPRR 334 – Additional Analysis.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting September 20, 2013.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
1 Nodal Stabilization Market Call December 27, 2010.
Parallel Ops / Go-Live Checkpoint Weekly Update – Friday Meeting December 20, 2013.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Lead from the front Texas Nodal 1 Reduction of MMS Vendor Effort for TPTF January 8, 2008 Murray Nixon Sai Moorty.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 09, 2010.
1 Market Trials Open Market Participant Call Weekly Kick Off May 10, 2010.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting November 1, 2013.
Readiness Liaison Update Erin Jester September 26, 2013.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 11, 2013.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Market Release 1.17 MP Testing Kick-Off January 5,
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 Market Trials Update NATF January 5, 2010.
Market Trials Structured/Unstruc tured Test Overview December 14, 2012 Casey Cathey ·
1 Market Trials Real-Time Market / LFC Weekly Update August 27, 2010.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting August 9, 2013.
Cutover Market Call November 29, :30 PM
Hourly Offers Schedule Update Examples
ERCOT Market Design & Operations
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Congestion Management and Ramp Rate for Delivering Ancillary Services
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Market Trials Open Market Participant Call
Presentation transcript:

IDT Prep 01/24/2014

Announcement IDT 1/21 Preliminary Debrief Presentation on spp.org updated with Regulation Pre-selection data and graphs 2

IDT 1/27 Reminders 1/27 IDT Call starts at 7:30 AM, 7 hour IDT begins at 8:30 AM TARRFs set to regular submission – not required to be set to 1 BAAL control will be tested again Ramp Sharing “On” Reg Up / Reg Down at 50%; Spin and Supp at 100% webMirroring will continue to be off  EIS and IM Schedules need to be submitted. Please submit dual schedules for HE IDT Conditions Tieline Checkout Process  SPP will verify tie line meter data and calculate SPP Inadvertent during the IDT Regulation Pre-Selection  RegUp, RegDown, Spin and Supp all submitted as “Market” or “Fixed” as desired  Details follow EDR Scenario: Applicable MPs are in contact with SPP  Demonstrate the clearing & dispatch of EDR resource for qualified products 3

Review of RSS Event Expectations Entity that experiences the Resource trip submits the RSS event SPP enters event into CRD tool MPs should follow Setpoints to respond Small events are handled solely through changes in Setpoints Large events could require unit commitments  SPP will work directly with the MP to determine which units to commit in order to respond to the event 4

Market Participants MPs with Resources online qualified for Reg, Spin or Supp should submit them as either “Market” or “Fixed” Dispatch Status as they desire for the IDT.  Offline Supp may also be offered as “Market” or “Fixed.” Ramp Rate, Offer Curve and Limits on these Resources should be similar to what is expected to be offered in the IM after go-live. SPP Operators will execute the IDRUC process to identify Resources on Reg for each hour. SPP will dispatch Reg normally by sending a Setpoint to each Resource.  Spin and Supp will be deployed as necessary if an RSS event occurs during the IDT. The SPP BA and RUC Operators may intervene in the Reg and CR Selection process if the deployment of Reg or CR Resources negatively impacts a constraint or if regulation MW’s become unavailable due to a constraint. 5

Dynamic Adjustments and Load Calculations SPP needs to ensure that any adjustments made by the current BAs are included in SPP IM systems through schedules or pseudo ties Dynamic metering must be associated with a dynamic schedule in RTOSS Failure to submit adjustments correctly will result in true up costs and adjustments to load calculation numbers during check out 6

IDT Schedule and Conditions 7 IDT DateIDT TimesConditionsNotes 1/27/147:30A-4:30P 7hr IDT begins at 8:30A Tieline Checkout Regulation Pre-selection EDR Turn Around Ramp Rate to Regular Submission Reminder: Please submit Spin/Supp as ‘Market’ 2/25/148:30A-12:30P 2hr IDT begins at 9:30A 2/28/147:00P 4hr IDT begins at 8:00P Cutover for March 1 Go-Live Brian Strickland