Beverly A. Scott, Ph.D. MBTA General Manager MassDOT Rail & Transit Administrator Richard A. Davey MassDOT Secretary and CEO GREEN LINE OVERVIEW May 2014.

Slides:



Advertisements
Similar presentations
Kennedy Plaza Bus Operations Activity in one weekday 1075 RIPTA buses depart Kennedy Plaza 30,000 people board or alight a RIPTA bus Transfers between.
Advertisements

MUNI Operations Overview and Recent Innovations Julie Kirschbaum San Francisco Municipal Transportation Agency, Operations Planning and Scheduling Manager.
Creating connected and liveable cities: The Route 96 Project.
Rescue Muni’s 3-Phased Plan For Geary Corridor Rapid Transit Presented by Dan Krause, Andrew Sullivan & David Vasquez.
HUDSON-BERGEN LIGHT RAIL TRANSIT SYSTEM HUDSON-BERGEN LIGHT RAIL TRANSIT SYSTEM Facts and Highlights Facts and Highlights.
9/7/2012 MBS UU.
Look, Listen, Be Safe! A student’s guide to DC Streetcar.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
Civil & Environmental Engineering Lessons About Sustainable Transportation Peter Furth, Northeastern University Prof. of Civil & Environmental Engineering.
Darton Ito Manager, Long Range & Capital Planning Drew Howard
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
T-FLEX Workshop Roger Snoble, L.A. Metro Chief Executive Officer October 29, 2007 Los Angeles County Metropolitan Transportation Authority.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
Presented to presented by Cambridge Systematics, Inc. Estimating Commuter Rail Station- Level Ridership Using American Community Survey Journey to Work.
1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development.
Managing Director/CEO
Beverly A. Scott, Ph.D. MBTA General Manager MassDOT Rail & Transit Administrator Richard A. Davey MassDOT Secretary and CEO Chairman of the MBTA Board.
A Brief Comparison on Traffic System Between London and Shanghai Allen Liu, Shanghai Feb. 16 th 2012.
Caltrain Modernization Program CA Passenger Rail Summit April 29, 2015.
BART Briefing for Mayor’s Transportation 2030 Task Force April 30, 2013.
Stop Sign This is a traffic sign. This means to stop. It helps us be safe when driving.
Key Transport Policy Issues for 2010 Stephen Clark Deputy Clerk to the Authority 18 January 2010.
SGR & Capital Working Group Initial Overview 8/31/2015 Draft for Discussion & Policy Purposes Only1.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
A ‘Plug’ for Electric Vehicles! Sally Herbert Sustainable Travel Officer Newcastle City Council.
February 2014 Bus Rapid Transit for Chennai. Chennai city bus service GOOD PATRONAGE  50 lakh daily passenger trips  3650 buses  Maximum flow of.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Transport Update Chris Carter Transport Strategy Manager.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
On the Right Track Meeting Greater Boston’s Transit and Land Use Challenges May 17, 2006.
1 FTA Research Programs Ronald Hynes Acting Associate Administrator for Research, Demonstration, and Innovation April 17, 2007.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
San Diego Trolley. Current Current/future expansion Propose extension.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
City and County of San Francisco Mayor’s Transportation Task Force: Draft Findings and Recommendations Presentation from the San Francisco Controller’s.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Making Headways Smart Card Fare Payment and Bus Dwell Time in Los Angeles Daniel Shockley Fehr & Peers Julia Salinas Los Angeles Metropolitan Transportation.
PROJECT OVERVIEW. 2 Green Line Extension Project 3 College Ave Ball Sq Lowell St Gilman Sq Lechmere Union Sq Washington St.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Northern Transforming Rail Travel in the North Matthew Worman Stakeholder Manager 11 th April 2016.
FMCB Calendar Next Meeting: 9/18/17 Meeting Item Notes FMCB
APTA Sustainability Workshop 2016
Red Line Customer Capacity Update
A People’s Plan for Baltimore Transit
Mattapan High Speed Line
Creating connected and liveable cities: The Route 96 Project
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
Operations and Service Concept
Transportation Summit
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
APTA Sustainability Workshop 2016
Whistle and Horn Semaphore and Signal Lights
Capital Programming Committee South Coast Rail Phase 1 Service
D Line Station Plan Overview
D Line Station Plan Overview
Focus40 Overview A long-range plan for how the MBTA can meet the needs of the region in 2040: A 20-year plan as required by MBTA enabling legislation A.
D Line Station Plan Overview
Creating connected and liveable cities: The Route 96 Project
Bus Rapid Transit Study
Mass Transit Usage According to IBISWorld, the public transportation industry increased 14.3%, from $63 billion during 2013 to $72 billion for 2017,
Red and Orange Future Reliability
D Line Project Overview
North Suburban Planning Council
Presentation transcript:

Beverly A. Scott, Ph.D. MBTA General Manager MassDOT Rail & Transit Administrator Richard A. Davey MassDOT Secretary and CEO GREEN LINE OVERVIEW May

226,000 weekday riders 205 Vehicle Fleet o 111 Type 7’s (1987, 1997) o 94 Type 8’s (2007) 26 miles of track 23 miles of overhead catenary wire 64 grade crossings 91 switches, 497 signals, 497 track circuits, and 40 switch heaters 10 unit sub-stations 750,000 feet of DC feeder cable 2,019 MBTA parking spaces 66 stops/stations 2 Green Line: About

Green Line 1. Speed 2. Frequency 3. Capacity 4. Transparency 5. Accessibility 3

Speed Stop Consolidation: Preferred Station Spacing: 1,200 – 1,400 feet 4

Frequency Increase Fleet Size: Overhaul of Type 7 and Acquisition of Type 9 5 $140.6 million invested in fleet reliability $164.0 million invested in fleet expansion

Capacity 3 Car Trains: $3.9 million investment to study power system upgrades to run more 3 car trains at peak 6

Transparency Green Line Tracking: December 2014 Planned Launch 7

Accessibility Park St Station ElevatorsGovernment Center Overhaul 8 Station Upgrades: PATI Plan for Accessible Transit Infrastructure

Green Line Mid-Term Improvements Fare Evasion: Front Door Boarding Policy Reduce Use of Tickets Traffic Signal Prioritization: Improve Street Level Speed Capacity Study: Identify power needs on the Green Line 9

Green Line Long-Term Improvements Green Line Extension (GLX) New Facilities Power System Overhaul Additional Stop Consolidation New Fare Collection strategies 10

Thank you 11 Take the MBTA mbtasurvey.com