Transit Improvements on East-West Routes in Downtown Minneapolis Michael Mechtenberg Planner Metro Transit Minneapolis-St. Paul, MN.

Slides:



Advertisements
Similar presentations
2007 Intermodal Operations Planning Workshop Bus Stop & Bus Lane Capacity: Planning Bus Routes in Downtown Seattle Owen Kehoe, PE, PTOE Transportation.
Advertisements

Third Avenue Skip-Stop Operations Now a Rainbow of Frequent, Efficient Service Owen Kehoe, PE, PTOE King County Metro Transit, Transportation Engineer.
Downtown Access Improvements Plan Town of Hillsborough 2014.
CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Southwest LRT Project Craig Lamothe, AICP Senior Project Manager 2011 MN State Planning Conference September 29, 2011.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
I-35W and 46 th Street Station Concept Service Plan Planning for the Future – BRT 46 th St Station Concept Plan Public Input.
East Bay Bus Rapid Transit Project Description August 11, 2011.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
I-35W and 46 th Street Station Concept Service Plan and Construction John Dillery & Mac Sweidan Kingfield Neighborhood Association June 2010.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
Errol Heights Proposed Shared Street Pilot Project
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Bus Stop Design Guidelines - In Support of Effective Service Planning
I-35W and 46 th Street Station Concept Service Plan Planning for the Future – BRT 46 th St Station Concept Plan Public Input.
Case Study 3 — New Rail Starts: Seattle Monorail & LRT Britta Stein Justin Scott Wenteng Ma.
CBD Curbspace & Multimodal Decision Framework Study Seattle Planning Commission Meghan Shepard, Michael James November 13, 2014.
Montgomery County Transit Task Force Meeting August 17, 2011.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Effective Transportation Planning City of Seattle, WA.
Metrobus 30s Line Study Improving Your Customer’s Transit Experience Virginia Transit Association May 20,
Department of Transportation Transit Rebranding New Brand Identity City Council November 4, 2013.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Citizens Advisory Committee Quarterly Update Bill Van Meter, Assistant General Manager, Planning September 19, 2012.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
The Transit “T” Craig Lamothe UPA Transit Project Manager City of Minneapolis City of Lakes Innovative Choices for Congestion Relief.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
Regional Priority Bus Transit Conference June 24, 2009.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
Transit Use at UNC Charlotte: The Potential Impact of the Northeast Corridor Light Rail Transit Line By: Philip Holleran December 6, 2006.
How to Add Active Transportation into Your Daily Life Photos courtesy of Bike Walk Ambassador Program.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Oxfordshire County Council has exciting plans to transform the centre of Oxford’s transport and pedestrian experience.
APC University: San Diego’s Use of APCs on Three Six Modes from Three APC Vendors Brian Lane Senior Transit Planner San Diego Association of Governments.
Park Burlington | Downtown Parking & Transportation Plan Downtown Parking & Transportation Plan Public Forum November 3, 2015.
DOWNTOWN MOVES TRANSFORMING OTTAWA’S STREETS
DICK RUDDELL EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
1 Bus Rapid Transit Strategic Plan May BRT Strategic Plan Evaluate feasibility and effectiveness of six BRT corridors Establish framework for.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Service Guidelines and Standards Capital Metropolitan Transportation Authority Board of Directors Meeting September 2015 capmetro.org |1.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
What are Complete Streets?. Complete Streets place an emphasis on alternative modes of transportation being incorporated into the streetscape and design.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Service Development Process 1. Our mission: To meet our constituents’ present and future public transit needs by offering safe, clean, reliable, courteous,
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
 Connect the Coastside Presentation Half Moon Bay City Council Briefing March 15,
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Geary Bus Rapid Transit Project Presentation to the San Francisco.
2014 Annual Program Evaluation (APE) Status Update April 1, 2014.
Gunnison Valley Transportation Authority (RTA) 2016 Transit Planning Process Funded through a Section 5304 Planning Grant 5/23/2018.
D Line Station Plan Overview
D Line TAC Meeting #1: Rapid Bus Improvements on 7th & 8th Streets Downtown Business Block Club July 26, 2017 Katie Roth, Bus Rapid Transit.
D Line Station Plan Overview
D Line Project Overview
Transportation Management Plan Modernization Project
2014 Annual Program Evaluation (APE) Status Update
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Presentation transcript:

Transit Improvements on East-West Routes in Downtown Minneapolis Michael Mechtenberg Planner Metro Transit Minneapolis-St. Paul, MN

Today’s Presentation Overview of transit service in Twin Cities East-west transit service background Initial plan: consolidation Revised plan: balancing volumes Recent progress and next steps 2

Metro Transit Snapshot 15th largest U.S. transit system 7 counties, 90 cities Bus, light rail, commuter rail –127 routes, 941 vehicles 81 million rides in

Transit in the Twin Cities 4 East-West Hennepin Nicollet 4th Street Blue Line LRT MARQ2

Existing Transit Usage 5 Second busiest transit spine

Passenger Facilities 66

7

Access Minneapolis Downtown Plan June 2007, City approves Downtown Action Plan Plan Vision –Thriving economic center –Livable and walkable streets –High-quality transit system –Transportation choices Transit “spine” recommended to consolidate financial resources, simplify for users and improve transit operations 8

Access Minneapolis Downtown Plan Marquette and 2 nd Ave –Double-wide bus lanes –Shelters and real-time signs Hennepin/1 st Ave –Conversion to two-way traffic Nicollet Mall –All hybrid buses –Free ride service –Local routes only East-West Spine –Initial two-way 8 th Street concept rejected –“Continue to evaluate alternatives for local east-west service.” 9

Concept Plan: Consolidation T T Nearside (new) Farside (existing) Consolidate service onto 7 th and 8 th streets Split stop at Nicollet Mall, with new nearside location Curb extensions at stops Upgraded shelters with heat, light and better schedule info

2010 Concept Plan: Consolidation 11

Concerns of this concept raised by downtown stakeholders : – Traffic and curbside impacts (parking, loading, taxis); storefront views/access – High volumes of people/sidewalk congestion; security Initial plan dropped due to lack of support 12 Stakeholder Feedback

Coordinated with downtown stakeholders on East-West Corridor Task Force –Downtown Council –Downtown Improvement District –Key business representatives –City / Metro Transit staff Broaden scope to address larger vision for downtown –Project not only about transit –Downtown 2025 Plan –Downtown Action Plan 13 Revised Approach

Alternative approach to balance volume of riders –Distribute versus concentrate bus routes and stops Relocate local routes –Route 14 to 4 th Street –Route 22 to 4 th Street –Route 19 to 9 th Street Enhance sidewalks for length of corridor, not just at stops Streetscape and greening Improve bus stops 14 Revised Plan

Street Environment 15

Providing a better pedestrian environment 16

9 th Street 7 th Street 4 th Street 8 th Street 6 th Street Nicollet LaSalle Hennepin Marquette 2 nd Ave Current Weekday Boardings by Stop Proposed Weekday Boardings by Stop

9 th Street Pilot Project 18 Apply on street temporary measures to demonstrate proposed concept Install colorized roadway surface treatment Install planters to provide barrier between roadway and pedestrian area. Install pavement markings and signs to duplicate what is needed in proposed concept Collect data and analyze

9 th Street Pilot Project 19

Pilot Project Example: Union Square North, NYC 20

Status of transit changes Route 14 to 4 th Street Route 22 to 4 th Street Route 19 to 9 th Street Develop and revisit facility design alternatives –Street, pedestrian and transit customer Stakeholder/policymaker changes Renew stakeholder conversations 21 Next Steps

Transit Improvements on East-West Routes in Downtown Minneapolis Michael Mechtenberg Planner Metro Transit Minneapolis-St. Paul, MN