INFORMS 2012 Shared Corridor Railway Maintenance Scheduling Brennan M. Caughron Graduate Research Assistant Rail Transportation and Engineering Center.

Slides:



Advertisements
Similar presentations
Introduction to Transportation Systems. PART III: TRAVELER TRANSPORTATION.
Advertisements

John Barton, P.E. Assistant Executive Director for Engineering Operations Texas Department of Transportation Mid-States Highway-Rail Safety Conference.
Strategic Decisions (Part II)
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
NCFRP 04: Identifying and Using Low-Cost and Quickly Implementable Ways to Address Freight System Mobility Constraints Presenter: Joan Yim (CH2MHill) Project.
1.  NCHRP Report 657 is the general guidebook for implementing passenger service on shared corridors  This guidebook “drills down” on the issue of service.
Section 209 Activity Report September 12, 2011 Federal Railroad Administration.
Railway competitiveness Hinne Groot, Netherlands ministry 25th November 2014 UN ECE SC.2 workshop 25 November 2014.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity.
June 16, 2004 Dr. Robert Bertini Michael Rose Evaluation of the “COMET” Incident Response Program Oregon Department of Transportation.
A university within a business school 1 Integrating Resource Planning with Job Scheduling for Service Optimization Gang Li Bentley University Waltham,
Service Integration: Service Integration for Our Grandkids Jim Allison Manager of Planning Capitol Corridor.
Capacity for Rail KAJT Dagarna, Dala-Storsund Pavle Kecman - LiU Anders Peterson - LiU Martin Joborn – LiU, SICS Magnus Wahlborg - Trafikverket.
CE 515 Railroad Engineering
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March.
Slide 1 ILLINOIS - RailTEC Capacity of Single-Track Railway Lines with Short Sidings to Support Operation of Long Freight Trains Ivan Atanassov, C. Tyler.
Rail Related Research at IIT Madras
HEAVY AXLE LOADS ON SHORT LINES AND REGIONAL RAILROADS Georgia Railroad Association 5 th Annual Transportation Conference 5 th Annual Transportation Conference.
INFORMS 2012 Identifying and Prioritizing Shared Corridor Technical Challenges Brennan M. Caughron Graduate Research Assistant Rail Transportation and.
Infrastrucure presentation VZNERRAC PLENARY 11 Railway Infrastructure for the Twenty First Century John Amoore Network Rail and ERRAC.
Moving Research into Practice.  Implementation is the routine use of a SHRP 2 product by users in their regular way of doing business.  Users can include.
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
Corridor Electrification Environmental Process SVLG Transportation Committee January 9, 2013.
1 Ministry of Transport, Public Works and Water Management.
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Lead the Way APTA Transit Standards Development “BUS RAPID TRANSIT”
 Classes of trains  Fundamental principles of track authority  Impact of power/ton ratios  Drivers of dispatch priority 22 September 2010 SCORT/TRB.
North Carolina Rail Division Staff of about 50 Mission to: Improve & expand passenger rail service Improve safety at crossings Provide industrial access.
A mathematical modeling approach to improving locomotive utilization at a freight railroad Kuo and Nicholls.
Systems Engineering for the Transportation Critical Infrastructure The Development of a Methodology and Mathematical Model for Assessing the Impacts of.
Transportation leadership you can trust. presented to FHWA “Talking Freight” Seminar Series presented by Lance Neumann Cambridge Systematics, Inc. August.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation.
Implementation Overview SHRP 2 Oversight Committee June 18, 2012.
0 Christopher A. Pangilinan, P.E. Special Assistant to the Deputy Administrator Research and Innovative Technology Administration, ITS Joint Program Office.
Highway Risk Mitigation through Systems Engineering.
Overview of Investigation to Understand Progression of Concrete Tie Conditions in High Speed Applications Jeff Henderson Project Engineer Prepared for.
A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission Innovations in Automated Planning.
Hamed Pouryousef ; Pasi Lautala, Ph.D, P.E. Hamed Pouryousef ; Pasi Lautala, Ph.D, P.E. Michigan Tech. University Michigan Tech. University PhD Candidate.
IntelliDriveSM Update
RAILROAD Association at 7 th Zimbabwe Mining and Infrastructure Indaba 2015 RRA CEO: GG Zimba.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Freight Partnerships = Economic Development and Freight Performance Pete Rahn Missouri Department of Transportation AASHTO 2009 Annual Meeting Palm Desert,
Summary and Wrap-up Discussion 8 July 2015
Highway Risk Mitigation through Systems Engineering.
A Technology Partnership for the New Millennium Anne Harlan, Director William J. Hughes Technical Center 68th NASAO Annual Convention September 20, 1999.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
HIGH SPEED RAIL ASSESSMENT NORGE
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Maintenance Management
1 Maintenance Management. 2 Equipment Malfunctions l Equipment malfunctions have a direct impact on: l Production capacity l Production costs l Product.
Intercity Passenger Rail: Legislative Policy Recommendations Astrid Glynn Chair ASC Intercity Passenger Rail Legislative Team AASHTO Standing Committee.
Contents Overview for Digital Railway Solution..…..………………3 Operational Communication ………………..………………4 Agile Station ………………..………………..………………5 Fusion OCC...………………………………..………………6.
Virtual Track Surveying Paul Furniss. An introduction to Omnicom Engineering A few words from Gary Sanford the UK Sponsor What is the OmniSurveyor3D System?
ZETA-TECH Associates, Inc.
LOGISTICS NETWORK.
Draft Transportation Element September 6, 2017
Increasing Asset Lifecycle through the application of Innovative Technology
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
AASHTO Spring Meeting Portland, Maine May 2017 Jennifer W
2016 SCORT Annual Meeting Federal Grant Opportunities
MODULE 2: TSMO Strategies
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
MODULE 2: TSMO Strategies
Quantifying the economic benefits of changing the Gauteng to Durban railway corridor from narrow to standard gauge Christian Demmerez de Charmoy Prof.
Module 2: TSMO Strategies
Presentation transcript:

INFORMS 2012 Shared Corridor Railway Maintenance Scheduling Brennan M. Caughron Graduate Research Assistant Rail Transportation and Engineering Center (RailTEC) University of Illinois at Urbana-Champaign

Outline FRA shared corridor research needs study Introduction and background Maintenance planning Strategic planning Tactical scheduling Integrated train and maintenance scheduling SRC research needs

Project Description: New high speed rail (HSR) developments in the U.S. need to address technical challenges of shared rail corridors in the North America rail environment The objectives of this project are to identify shared rail corridor technical challenges, existing and on-going research, knowledge gaps and research needs INVESTIGATING TECHNICAL CHALLENGES AND RESEARCH NEEDS RELATED TO SHARED CORRIDORS FOR HIGH-SPEED PASSENGER AND RAILROAD FREIGHT OPERATIONS Research Sponsor: BROAD AGENCY ANNOUNCEMENT BAA Research and Demonstration Projects Supporting the Development of High Speed and Intercity Passenger Rail Service Impact on the Railroad Industry: Reducing the operational and program deployment risks associated with shared rail corridors Identification of critical areas to address in planning new HSR systems Expediting the process of developing efficient and safe HSR shared corridors with better prioritization in planning

Shared-Use Corridor Operating Configurations Shared track: tracks shared between passenger and freight or other service. Shared right of way (ROW): dedicated high-speed passenger tracks separated from freight or other service tracks up to 25’ Shared corridor: dedicated high- speed passenger tracks separated from freight or other service tracks by ’ High-speed rail service Freight or conventional passenger rail service Adjacent track centers >25’ ≤ 200’ Adjacent track centers ≤ 25’ Shared track & shared ROW Shared corridor

Shared Corridor Categories Safety technology and operating practices Rail infrastructure and equipment Economic and institutional issues Planning and operations Infrastructure upgrade prioritization Rail capacity planning Train scheduling patterns Passenger train schedule reliability Maintenance-of-way scheduling

Railway Periodic Inspection Inspection activities occur on regular intervals depending on quality (class) of track Inspection events Visual inspection monthly to 1-3 times per week (speed, track function, traffic) Rail flaw detection 2 yearly or before 40MGT (with passenger traffic) Gauge restraint measurement system annually for classes 8 and 9 Automated track geometry 1-2 yearly up to twice every 120 days Joint bar flaw detection Ground penetrating radar Machine vision systems Personnel and equipment must usually occupy track to perform inspection (some exceptions)

Railway Periodic Maintenance Track is taken out of service for maintenance to occur Operation on adjacent tracks can be impacted by maintenance activities Activities occur on intervals based on cumulative traffic or time Categories of maintenance work Rail relay Curve gauging Tie replacement Ballast cleaning Shoulder ballast cleaner Undercutting Surfacing System high-speed Spot surfacing Track renewal Bridge maintenance

Modeling Maintenance Scheduling Numerous individuals have applied optimization techniques to problems related to planning and scheduling railway maintenance Model categories Strategic planning Tactical scheduling Maintenance scheduling within existing schedule Integrated train and maintenance scheduling

Strategic Maintenance Planning Long term planning horizon (year) Large time increment (week) Schedule work crews to specific projects on the network Generally preventative (rail, ties, ballast) vs. reactive maintenance (fixing slow orders) Considers various network constraints Number and type of work crews Work crew location constraints Multiple projects on each network segment Benefits of maintenance blitz strategies Longer term disruption of rail traffic Precedence relationship between activities Weather or seasonal constraints

Strategic Maintenance Planning A C D B E F Network ? ? ? ? ?

Strategic Planning - Previous Work Grimes (1995) Genetic algorithm Track surfacing planning Track quality, degradation rate, various costs Budai et al. (2006) Preventative maintenance scheduling problem (PMSP) Minimize total track possession cost Considers one network segment Gorman et al. (2010) Maintenance production gang scheduling Minimize labor, equipment, repositioning/travel costs Labor agreements, precedence relationships, early start/late finish constraints

Strategic Planning - Previous Work Pouryousef et al. (2010) Refined PMSP from Budai Simultaneous planning of several segments Minimize track possession cost, maintenance cost, and penalty for performing work too early Peng et al. (2011) Minimize travel costs of production gangs (travel cost more variable than relative fixed cost of performing work) Weather, network disruption, activity precedence constraints included Methodology integrated into maintenance planning process of a class 1 railroad

Tactical Maintenance Scheduling Short term planning horizon (weeks or days) Small time increment (hours) Planning for one or several lines vs. network Scheduling maintenance activities into existing traffic pattern Train schedule typically adopted before maintenance schedule Not able to reschedule some types of rail traffic Passenger (+- minutes) Intermodal (+- hours) Manifest (+- hours) Delay costs for different traffic types Productivity losses for maintenance crews with interrupted or split work windows Limited number of crews

Tactical Maintenance Scheduling Time Distance 1 2 3

Shared ROW with High Speed Rail Time Distance Existing RR New HSR High speed trains 1 2 3

Previous Work Higgins (1998) Schedule maintenance activities and crews in an existing rail traffic pattern Decision support tool for operation and maintenance managers Activities considered Inspection Cross ties Rail (replacement and grinding) Ballast cleaning Track surfacing Case study line (302 km, 45 sidings) Manually constructed maintenance schedule 7.4% increase in activity finishing time 18% increase in train and maintenance delay

Integrated Train and Maintenance Scheduling Maintenance activities and train schedules planned simultaneously Objective function: minimize total cost of train delay and maintenance activities North American operating environment Unscheduled trains (bulk commodities) Scheduled trains (passenger, intermodal, manifest) Long trains Long shipment distances (2,000+ miles) European operating environment Scheduled trains (freight and passenger) Meet and pass planning Temporal separation of traffic types Integrated train and maintenance scheduling may have limited application in the N. American operating environment

Previous Work Albrecht et al. (2010) Problem space search (PSS) meta-heuristic Simultaneous scheduling of maintenance activities and rail traffic Minimize total delay to rail traffic and maintenance crews Considered additional metric – delay experienced by worst performing train (better consideration of distribution of delays) Applied to case study line Total delay reduced 17% vs. manual schedule Maximum delay reduced 34%

Shared Corridor Research Needs Strategic planning Passenger traffic delay constraints related to network and seasonal conditions Tactical scheduling Delay cost for different train types Cost of lost maintenance productivity in interrupted or split windows Threshold for integrated rail traffic and maintenance planning Threshold for temporal separation (maintenance at night, rail traffic during the day) Tactical scheduling with stochastic train and maintenance events (longer planning horizon, more uncertainty)

Questions? Brennan M. Caughron