Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Local Area Planning Update to TRANSAC – December 16, 2014.
North Mankato Load Serving study Xcel Energy Great River Energy.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting December 16, 2009.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.
Puget Sound Energy Columbia Grid Presentation June 19, 2007 John Phillips.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
1 Transmission Advisory Group Meeting January 25, 2007 Raleigh, NC.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
Lyndonville Electric Department Feasibility Analysis Review December 2,
Oct 14, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
Distribution Systems-General
Puget Sound Energy Columbia Grid Presentation August 15, 2007 John Phillips.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
June 3, 2010 Technical Advisory Group RMR Exit for Spencer 5 – Remedial Action Plans Jay Teixeira.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
May 8, 2008 Technical Advisory Committee CenterPoint Energy Rothwood Substation Project Jay Teixeira Manager, Regional Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Houston Import Study Update
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Electric Utility Master Plan Update
Local Area Planning Update to TRANSAC – June 29, 2017
I-5 Corridor Reinforcement Project
Presentation transcript:

Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline

3 Outline  Description of Area  Various Load Serving Problems  Study Methodology & Initial Alternatives  Final Alternatives  Final Recommendation  Questions

4 Description of Area  Located in West-Central Wisconsin  Eau Claire & Chippewa Counties  About an hour east of Twin Cities on I-94  Area fed by 345 and 161 kV sources and 69 kV transmission  Load belonging to NSPW and DPC  Lines belonging to NSPW and DPC

5 Description of Area  Area NSPW Sources:  Eau Claire Substation  Seven Mile Substation  Wheaton Substation  Chippewa River Generation  Area DPC Sources (2011):  Elk Mound Substation

6 Description of Area  Area NSPW Loads (2011):  Jeffers Road (27 MW)  Truax (41 MW)  Otter Creek (35 MW)  London (42 MW)  Hallie (31 MW)  Area DPC Loads (2011):  Seymour (4 MW)  Elco (4 MW)  Equity (3 MW)  Washington (3 MW)  Brunswick (2 MW)

7 Description of Area

8 Description of Problems  Eau Claire transmission system is designed to rely upon Eau Claire 69 kV bus  Eau Claire 161/69 kV transformers are heavily loaded and cannot endure loss of parallel bank  Eau Claire substation is crowded and not enough space exists to increase the size of the existing 161/69 kV banks  Increasing size of banks would require moving to non-standard bank sizes

9 Description of Problems  During peak load conditions, 69 kV system to north overloads  DPC system served out of Seven Mile overloads for various contingencies  High load growth throughout area  Interconnection requests at Hallie Substation requrie auto-transfer scheme to be turned off  Area transmission system highly susceptible to fluctuations in Chippewa River generation

10 Study Methodology  2006 MAPP Series Cases  2011 Near-Term  2016 Out-Year  Worked with DPC through Joint Planning Process

11 Study Methodology  Assumptions and Adjustments made  Assumed Chisago Line Project not in service in 2011 (In-service in 2016)  Included New Richmond Area Load Serving Study projects  Assumed Monroe County – Council Creek 161 kV line in service in 2011  Moved Riverview load to Hallie

12 Study Methodology

13 Study Methodology  Base Case Results

14 Initial Ideas  Reconductor double-circuit 69 kV corridor between Eau Claire and Chippewa Falls  Convert 69 kV double-circuit corridor to 161 kV  Add circuit breakers at Otter Creek  Shift load from 69 kV system to 161 kV system

15 Final Alternatives  Alternative 1  Convert entire 69 kV corridor from Eau Claire to Chippewa Falls to 161 kV  Convert all 69 kV load along corridor to 161 kV operation  Alternative 2  Extend 161 kV from Presto Tap to Hallie Substation  Place US Rubber on loop from Eau Claire Substation  Place Chippewa Falls on loop from Wissota Substation

16 Final Alternatives  Alternative 3  Convert double-circuit 69 kV corridor to single- circuit 161 kV  Convert Hallie to 161 kV operation  Place US Rubber on loop from Eau Claire Substation

17 Final Recommendation  Alternative 3 Recommended  Reterminate Wheaton to Presto Tap 161 kV line at Eau Claire Substation  Tear down existing 69 kV double-circuit line between Eau Claire and the point where line intersects with Hydro Lane – Red Cedar 161 kV line  Construct 161/69 kV substation (50 th Avenue Substation) where double-circuit 69 kV line intersects Hydro Lane – Red Cedar 161 kV line  Construct single circuit 161 kV line from Eau Claire to 50 th Avenue Substation  Convert Hallie Substation to 161 kV operation

18 Final Recommendation

19 Final Recommendation  Very robust service provided to area north of Eau Claire  Off-loading of Eau Claire 161/69 kV transformers buys approx. 12 years of life expectancy  Strong corridor to support Chippewa River generation  Increased Load-serving north of Jim Falls

20 Next Steps  Funding requested for 2007 budget process  Continuing to investigate ways to off-load 69 kV network out of Eau Claire  Eau Claire Area Long-Term Study to be completed with DPC during Summer 2007