Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

Bosnia and Herzegovina
Sharing of ISTS Charges & Losses Regulation
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
ERPC, Kolkata.  Definition and Concepts  Standards and regulation for TTC calculation  Calculation of TTC  Challenges in calculation of TTC  Way.
3 Way Market Split in IEX for delivery dated 2 nd July’14 Average Price (Rs/kWh) : S1  6.85 S2  6.87 Rest of India  2.85 UMCP  3.89 Source: IEX.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
Power Exchanges in India
OSC Meeting April 27, Transmission Cost Allocation Overview.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Bulk Power Transmission System
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “Open access” means the non-discriminatory provision.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “ Open access” means the non-discriminatory.
CERC (Power System Development Fund) Regulations 2010.
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Sharing of Inter-State Transmission Losses 11/29/
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Managing Reliability and the Markets with PI
4 Way Market Split in IEX for delivery dated 18 Aug’14 (Final) Source: IEX Average Price (Rs/kWh) : S1  5.35 S2  5.49 Punjab  3.04 Rest of India  3.02.
Regulatory Framework in Indian Power Sector Module C5 V K Agrawal ED, NLDC POSOCO.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Renewable Regulatory Fund (RRF):- Implementation Mechanism
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
PROCEDURE FOR PROCESSING POWER EXCHANGE TRANSACTIONS AT NLDC CONTROL ROOM 1.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Settlement system for Collective Transactions (Power Exchange)
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Interstate Transmission system
Open Access.
Open Access.
Scheduling of Collective Transactions Through Power Exchange
“ Open access / Power Exchange Regulations/experiences of SR ”
Sharing of Inter-State Transmission Losses
Congestion regulations
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
بازار برق: مباني، انواع و نهادها مقدمه بازار برق: تاريخچه، زمينه‌ها و كاستي‌ها تاريخچه زمينه‌‌هاي مقررات‌زدايي كاستي‌ها انواع بازارهاي برق رقابت‌پذيري.
Presentation transcript:

Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most fundamental transmission management problem A natural corollary of growth Occurs in deregulated markets Commercial signal to Tr. Requirement N-1 Planning System security at stake

POWER SYSTEM DE-REGULATION (RESTRUCTING) GENCO TRANSCO DISCO Tie Lines GENCO TRANSCO DISCO Deregulation or Restructuring denotes breaking up of the Vertically Integrated Utility(VIU) structure into Competitive Market Entities.

RESTRUCTURED ELECTRICAL INDUSTRY

ENTITIES RESULTING FROM DE- REGULATION SO GENCO TRANSCODISCO SO is the Power System Operator and the Power Market Operator, which may include other entities depending on the market structure. SO, is independent of the other entities

8.0 CASE STUDY OF COGESTIO EXPERIECED O : Due to early morning fog, Talcher-Kolar HVDC had to be operated in reduced voltage mode resulting in a reduction of the total transfer capability to 3600 MW from 4000 MW between 0400 Hrs to 0900 Hrs of 12-Dec After accounting for reliability margin, long term transactions and already approved bilateral transactions, available margin on ER-SR path was 617 MW and on WR-SR path, available margin was about 490 MW during this period Based on the provisional solution received from the Power Exchanges for the period 0500 Hrs to 0600 Hrs, it was observed that the total requirement of both Exchanges was more than total import margin of Southern Grid. Accordingly available margin for each Exchange was calculated on pro-rata basis. The market was split in both the Power Exchanges and the flow was restricted to the available capacity in the final solution. As against a total provisional requisition of 1430 MW for import to Southern Grid, 1091 MW was cleared in the final solution

Congestion management methods Cost free methods (Physical) –Generation/ Load Control –Network Reconfiguration (Parallel Paths, Loops) –FACTS/ FSC ETC –Voltage improvement Non-cost free methods (Commercial ) –Rescheduling of transactions –Curtailment –Imposition of Congestions charge –Ancillary Services

Congestion occurance Real Time : –Inadequate system conditions –Temporary outage of Tr. Line / Generator/ Load Ex-ante (before fact): –More transactions by a far end Consumer –Seasonal skew in L-G balance –More demand for transmission corridor

Congestion mitigation Stage 1 : Ex-ante (before fact): –Bidding for transmission corridor (for bilateral trnasactions) –Market Split (for Collective transactions) Stage 2 : (Real time) – Impose Congestion charges on UI Stage 3 : (Real time) Curtailment of STOA/ Collective/ MTOA/ LTA

Pre-requisites Observability of Grid (SCADA) Scheduling mechanism EMS tools (Contingency Analysis, Security Constrained Dispatch) Commercial Mechanism

Congestion management in India Congestion charges in for OD from 2007 Congestion Regulations (CERC) w.e.f congestion charge shall be applied as a commercial measure. The congestion charge will be payable by a Regional entity or entities causing congestion in the inter-regional link or intra-regional link and receivable by a Regional entity or entities relieving congestion. In addition to the Unscheduled Interchange charges

Measures to mitigate Congestion Declare ATC by NLDC/ RLDCs / for Inter Regional/ Intra regional and each control area Congestion charge imposed on only Deviations from schedules Rate of congestion charge : Rs.5.45/u Notice of –2 time blocks for imposing –1 time block for lifting congestion charge –At frequency below 50 Hz, congestion charge would be levied for over drawal or under-injection in the importing control area under drawal or over-injection in the exporting control area.

NLDC/ RLDC display the TTC, ATC, Actual flow on the congested corridor on common SCADA display No congestion charges if congestion is due to outage of a transmission line in the corridor, but schedules are maintained In such case, curtailment of STOA/ MTOA and then LTA

REAL TIME CONGESTION MANAGEMENT In case of transmission constraint or threat to grid security, the scheduled transactions may be curtailed in the manner as decided by the NLDC /RLDCs / SLDCs to relieve the transmission constraint/ to improve grid security. Collective Transaction through Power Exchange(s) would normally be curtailed subsequent to the Short-Term Bilateral Transaction(s).

…contd RLDCs would curtail a Transaction at the periphery of the Regional Entities. SLDC(s) shall further incorporate the inter-se curtailment of intra-State Entities to implement the curtailment. In case of curtailment of a Transaction caused by transmission constraints / threat to grid security, the Transmission Charges in respect of such Transaction shall be payable on pro-rata basis in accordance with the finally Implemented Schedules. Operating Charges shall not be revised in case of curtailment. Power Exchange (s) shall be responsible for the settlement on account of curtailment, directly with its participants. NLDC/RLDCs/SLDCs shall interact only with the respective Power Exchange(s), for the same

Payment /receipts though Congestion charge a/c Utilization of fund for studies, SPS, Shunt capacitrs

Upstream O/D &U/G relieve U/D & O/G aggravate O/D &U/G receive charges U/D & O/G pay charges Downstream U/D & O/G relieve O/D &U/G aggravate U/D & O/G receive charges O/D &U/G pay charges Congested Corridor Congestion Charge Imposition

Congestion accounting NLDC/ RLDC provide –From/To time block –corridor –and Upstream /downstream entities details to RPCs on a weekly basis when congestion charge is kicked along with reasons RPC to issue congestion account along with UI accounting