1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003.

Slides:



Advertisements
Similar presentations
1 AFSWG Mtg 15 Aug 2003 Elwyn Baynham RAL Safety Overview Work done by RAL Group Contributors Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov.
Advertisements

Hydrogen R&D system HAZOP
9. Storage Tanks.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
Thoughts on Incorporating HPRF in a Linear Cooling Channel Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory NuFact09—IIT.
1 MICE at RAL MICE Collaboration RAL, 2 November 2003 Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov, Tony Jones, Jim Rochford Engineering.
1 MICE Mtg Oct 2002 Elwyn Baynham RAL Focussing Absorber Magnet Elwyn Baynham ; Tom Bradshaw Iouri Ivaniouchenkov ; Jim Rochford Applied Science Division.
MICE Hazard Overview and Analysis Elwyn Baynham Tom Bradshaw Yury Ivanyushenkov.
MICE Safety Review Process and Schedule Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov Columbia Meeting June 2003.
CM26 – 26 th March 2010 Step IV: Liquid Hydrogen Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
1 Hydrogen Safety System Summary MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
Report from meeting Hydrogen system operation from cryocooler and level control Cryocoolers for MICE Tom Bradshaw Elwyn Baynham Yury Ivanyushenkov Rutherford.
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Μ-beam Absorber 1Absorber 2Absorber 3RF 1RF 2 Vacuum LH2 Warm window Windows in MICE: Option 1 (as currently designed) ISIS Safety officer’s comment: If.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
Talk outline 1 st talk: –Magnetic forces –Quench in the absorber cryostat 2 nd talk: –Shielding of magnetic fringe fields.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
A presentation at the MICE Video Conference on Wednesday the 5 th of May 2004 Response to the Safety review comments by Wing Lau -- Oxford.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
1 Technical Arguments in Favor of using the Cryomech PT-415 Cooler for Cooling the LH 2 Experiment Michael A. Green Lawrence Berkeley Laboratory Berkeley.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Hydrogen system status Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
MICE Hydrogen System MICE Collaboration Meeting, CERN, 29 March-2 April 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
Mechanical Safety Systems and DSEAR Compliance
MICE hydrogen review System modifications. Relief circuit repair During leak testing of R&D tests, the insulating vacuum would not go lower than
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Meeting October 2004 – Coseners House.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
The MICE Hydrogen System Summary Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford Appleton Laboratory.
Iouri Ivaniouchenkov RAL Safety considerations at RAL July 9, RAL MICE Collaboration Meeting 1.
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
1 Preparation of the hydrogen test system Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones CCLRC Technology.
Gas cutting equipment. MIG WELDING  MIG welding :  metal inert gas welding: a method of welding in which the filler metal wire supplies the electric.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
1 MICE Mtg Oct 2002 Elwyn Baynham RAL Implementation of MICE at RAL Work done in Engineering and ISIS Departments Rutherford Appleton Laboratory Contributors.
The MICE Hydrogen System Safety Review Introduction Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford.
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Collaboration Meeting RAL October 2004.
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
1 MICE Radiation Shielding MICE Phone Conference, 28 January 2004 Yury Ivanyushenkov Engineering Department, RAL.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Progress on Hydrogen R&D System
MICE LH2 Absorber Safety Mary Anne Cummings Edgar Black (IIT) Abingdon, UK Oct. 30, 2003.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
Progress on Hydrogen R&D System Yury Ivanyushenkov on behalf of Elwyn Baynham, Tom Bradshaw, Mike Courthold Matthew Hills, Tony Jones MICE Collaboration.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
Integration Group Summary
MICE Safety Review Meeting 4th Oct 2011 PJ Warburton - Daresbury Lab
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Status of Hydrogen System Development
Presentation transcript:

1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003

2 Hydrogen system: Conceptual points Closed system concept : - hydrogen absorber and a storage unit form a single closed system in a way that hydrogen is either stored as a gas in the storage unit or is liquefied in the absorber; - pressure in the system is always higher than the atmospheric pressure. Individual hydrogen system for each absorber MICE / RAL Safety RAL, 30 October 2003 Ideally it is a truly passive system Air can not leak inside the system Safety pros: Minimal amount of hydrogen per system

3 Hydrogen system: Options Hydrogen storage unit = large (about 30 m 3 ) tank Pros: truly passive system Cons: about 100 m 3 for the location of tanks (=> on the roof ?) MICE / RAL Safety RAL, 30 October 2003

4 Hydrogen system: Options Alternative option: Hydrogen storage unit = compact (< 1 m 3 ) metal hydride bed Pros: - very compact system (easier to collect hydrogen in case of leak) - hydrogen is stored as a solid compound Cons: not a passive system (requires active heater/cooler) A question then: is it a reasonable compromise from the safety point of view ? MICE / RAL Safety RAL, 30 October 2003

5

6

7 Hydrogen system layout: Option with a hydrogen tank Concrete radiation shielding Steel magnetic shielding Hydrogen storage tank H 2 absorber H 2 buffer tank

8 H 2 Storage unit Ventilation duct Radiation shielding wall H 2 Buffer Tank (1m 3 approx) H2 absorber Vacuum jacket MICE / RAL Safety RAL, 30 October 2003 Hydrogen system layout: Option with a hydrogen bed

9 MICE / RAL Safety RAL, 30 October 2003 Hydrogen system layout: Option with a hydrogen bed

10 MICE Layout Version: 28 October 2003 MICE / RAL Safety RAL, 30 October 2003

11 MICE / RAL Safety RAL, 30 October 2003 Preliminary HAZOP recommendations Hydrogen storage unit Implement: active pressure gauge temperature monitor Hydrogen absorber internal vessel with hydrogen windows Implement: active pressure gauge temperature sensor active liquid level meter (additional) Hydrogen absorber vacuum jacket with safety windows Implement: active hydrogen sensor Buffer tank Implement: active pressure gauge active oxygen sensor Hydrogen module enclosure Implement: ventilation system equipped with hydrogen detector.