JPSS POE Estimate Algorithm & Data Products General Assumptions: – NPP Launched – J1 Launch – J2 Launch – FY12 actual cost reflects a 25% cut (reduced.

Slides:



Advertisements
Similar presentations
Figure 2 – ADL Concept of Usage Kerry Grant, JPSS CGS Chief Scientist Raytheon Intelligence and Information Systems, Aurora CO Gary Metz, IDPS ING/PRO.
Advertisements

NPP Calibration and Validation Rehearsals Janna H. Feeley NASA JPSS Ground Project Greenbelt, MD The Aerospace Corporation El Segundo, CA AMS 2012 Overview.
STATE BUDGET OUTLOOK MULTI-YEAR TREND ANALYSIS OFFICE OF MANAGEMENT AND ENTERPRISE SERVICES November 1, 2014* Shelly Paulk Revenue Analyst *To be updated.
JPSS and GOES-R SST Sasha Ignatov
1 Budget Update January 29, 2015 Ken Hicks. State Budget 2.
ESTO Advanced Component Technology 11/17/03 Laser Sounder for Remotely Measuring Atmospheric CO 2 Concentrations GSFC CO 2 Science and Sounder.
October 8, 2013 Eric Fox and Mike Russo. AGENDA »Recent Sales and Customer Trends »Preliminary State Sales and Demand Forecast »Building a No DSM Forecast.
Office of State Planning and Budgeting: Capital Construction and Information Technology Projects Review and Requests June 6, 2014 Laura Blomquist.
©2010 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
Budgets in the CSU CSU 101 March 8-11, 2009 Monterey Shawn Bibb, Vice President Administration and Finance Cal State East Bay.
OSU FACULTY SENATE Budget Update April 8, FY10 Budget Outlook – Recap of FS Presentation Nov, 2009 E&G Budget Budget balanced with $5.4 million.
Dedicated Windows 2003 Servers Dedicated Windows 2003 Servers Application Server Application Server Database Server Database Server Web Server Web Server.
Cost Management Week 6-7 Learning Objectives
Kerry Grant, Wael Ibrahim, Paula Smit, JPSS CGS Raytheon Intelligence, Information, and Services, Aurora, CO Kurt Brueske, JPSS CGS Raytheon Intelligence,
Mary E. Kicza Assistant Administrator for NOAA Satellite and Information Services Responsible for Responsible for providing timely access to global environmental.
JPSS CGS IDPS Product Generation
SGR & Capital Working Group Initial Overview 8/31/2015 Draft for Discussion & Policy Purposes Only1.
Setting Your Fees Project Cost and Setting Your Fees.
Financial Planning & Analysis. Department Overview The principal functions of the Financial Planning & Analysis department: Annual budget Budget-to-Actual.
6.4 N2/N6E Project Review 06 Oct 2011 Project: Preparing Tactical Ocean Optical Products for Future Polar- Orbiting Sensors
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Introduction to EAP Profile 36. Overview Development of EAP Profile 36 Transition to EAP Profile 36 Update to EAP Profile Expiry Date.
JPSS Common Ground System IDPS NPP Algorithm Operability Verification – Launch Build Characterization Tentative Agenda IDPS OAA 5/10/11.
JPSS Common Ground System NPP/J1 Algorithm Paradigm Shift IDPS Splinter May 10, 2011.
IMO BUSINESS PLAN Financial Overview September 30, 2003 Regulatory Affairs Standing Committee.
The Economy: Current Economic Conditions & General Fund Overview May 17, 2013 Office of State Planning and Budgeting Laura Blomquist
Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 POES Microwave Products Presented.
Sales Analysis Monitor and Analyze Sales Performance.
5th Science AGILE Workshop – ESRIN, Frascati, June The AGILE Instrument functional performance A. Argan, A. Trois (on behalf of the AGILE.
JPSS Common Ground System Baseline Management Process IDPS Splinter May 10, 2011.
Calibration/Validation of the NPOESS NPP Instruments: Plan Overview National Polar-Orbiting Operational Environmental Satellite System Karen St.Germain,
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
V2 Sep 16, Oversight Panel Update to SPSRB Template Instructions / Guidance OP updates to the SPSRB should ─ Identify your OP’s mission statement.
5-6 June 2008CEOS Precipitation Constellation Workshop – Tokyo, Japan NOAA Status Report to the CEOS Precipitation Constellation Ralph Ferraro Center for.
September Board Meeting FY08 and FY09 Spending Plan.
Pension Management Center Pension Management Center September, 2011.
GBA 573 – Final Presentation The Coach House Restaurant Patrick Villani July 12, 2004.
Joint Polar Satellite System (JPSS) Common Ground System (CGS) Rapid Algorithm Updates Kerry Grant, JPSS CGS Chief Engineer Raytheon Intelligence and Information.
Evolution of the JPSS Ground Project Calibration and Validation System Patrick Purcell, Gyanesh Chander and Peyush Jain JPSS Ground Project NASA, GSFC.
Suomi National Polar-orbiting Partnership (NPP) Martha Maiden Suomi NPP Workshop Sponsored by NASA Applied Sciences Program June 21, 2012.
Page 1 Rapid Algorithm Integration in the Joint Polar Satellite System (JPSS) Common Ground System (CGS) Kerry Grant, Raytheon JPSS CGS Chief Scientist,
Team: David Konyu – Project Manager David Konyu – Project Manager Ramon Sanchez – Communication Engineer Nomad HDAT as the robot “BUGS” BionicUrbanGroundSystem.
“Taking the pulse of the planet” NOAA’s NWS Telecommunication Operations Center (TOC) Julie Hayes, FOS Program Manager October 21, 2014 Julie Hayes, FOS.
A. FY12-13 GIMPAP Project Proposal Title Page version 04 August 2011 Title: Fusing Goes Observations and RUC/RR Model Output for Improved Cloud Remote.
Software Production ( ) Lecture 3: Dr. Samer Odeh Hanna (PhD) office: 318.
N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N NPP DATA ACCESS Mitch Goldberg JPSS Program Scientist June 21, 2012.
Integrating Uncertainty in Atmospheric Profile Validation Tony Reale NOAA Xavier Calbet AEMET ITSC-20 Lake Geneva, Wisconsin Oct 27 to Nov 3,
FY 2010 Budget Slide 1 Public Works March 18, 2009 Wastewater User Fees Wastewater Collection Proposed RCO Fee Surcharge Recommendation: Regional Consent.
Spring 2016 Budget Update April Agenda Closing Balance Projections Budget Forecast Model Impact of Enrollment Changes Spring 2016 Enrollment FY16.
Transition of Science Algorithms into Enterprise Product Generation Operations 2016 AMS Annual Meeting Dylan Powell, Ph.D. Lockheed Martin ESPDS Science.
JPSS Common Ground System Operational Algorithm Status – Launch Build Characterization Tentative Agenda IDPS OAA 4/5/11.
The Minnesota State Colleges and Universities system is an Equal Opportunity employer and educator. Presented to the Board of Trustees March 2007 FY
What is Cost and Project Cost Management?
MODIS and VIIRS Reflective Solar Bands Calibration Methodologies and
NOAA Report on Satellite Data Calibration and Validation – Satellite Anomalies Presented to CGMS-43 Working Group 2 session, agenda item 3 Author: Weng.
TEMPO’s Commercially Hosted Payload Concept
D I s , a ·.... l8l8.
Integration, Test, and Calibration
College of Agricultural Sciences PRELIMINARY 2014/2015 Total All Sources = $187,041,926 DATA SOURCES: State Research and Extension – approved FY budget.
I ll I
EDLC(Embedded system Development Life Cycle ).
U.S. Funding (Actual) for the United Nations Population Fund (UNFPA), FY 2001 – FY 2019 Request In Millions NOTES: FY13 includes the effects of sequestration.
U.S. Funding (Enacted) for the United Nations Population Fund (UNFPA), FY 2001 – FY 2019 Request In Millions NOTES: FY13 includes the effects of sequestration.
' 1 A ./.\.l+./.\.l
Economic Research & Extension
Annual Operating Budget & 5 Year Capital Improvement Project Budget
Presentation transcript:

JPSS POE Estimate Algorithm & Data Products General Assumptions: – NPP Launched – J1 Launch – J2 Launch – FY12 actual cost reflects a 25% cut (reduced POP from 12 to 9 months), plus a 5% cut for SDRs and 15% cut for EDRs. – FY13-FY16's estimates are based on the grass root estimates from Team Leads BOE updates (Nov 2011) – NPP work peaks FY12/13 – J1 work peaks FY17/18 – J2 work peaks FY22/23 – NG support is carried in a different set of budget lines – Hardware cost included in Pre-Integrator; with every 5 years a refresh – ODC including building cost, both initial setup and annual fee, based on M-squire overflow office space estimate

STAR Life Cycle for Satellite Products Development STAR Life Cycle Satellite Products Development (For all satellites): – Calibration L-4:L+3 – Algorithm Development L-5:L-1 – Science Maintenance L:L+12 – Intensive Cal Val L:L+2 – Monitoring L:L+12 – Algorithm Improvement L+3:L+8 – Algorithm Integration & Testing L-4:L – ODC & Management Support L-4:L+12

2012 JPSS Algorithm and Data Products Group Baseline Profile (in K)