Presentation is loading. Please wait.

Presentation is loading. Please wait.

JPSS Common Ground System Baseline Management Process IDPS Splinter May 10, 2011.

Similar presentations


Presentation on theme: "JPSS Common Ground System Baseline Management Process IDPS Splinter May 10, 2011."— Presentation transcript:

1 JPSS Common Ground System Baseline Management Process IDPS Splinter May 10, 2011

2 JPSS Common Ground System Page 2 Baselines, Branches and Merges 2/2/2011 - i2.1 and shared_csi_b2.1 branches are currently based off of mx4 - Mx5 is the NPP Launch baseline - Mx6 and beyond only migrate algorithm and other changes to State 2 by PCR (i.e. no “wholesale migrations”) - Algorithm drops may occur between Mx merges. - Algorithms drops from NPP may be migrated to State 2 - Functionality and algorithm changes from State 2 may be migrated to NPP by PCR if desired. Incr 1 CUT i 2.1 shared_csi_b2.1 Mx6Mx7 shared_csi_b1.5 i1.5 Migrate selected Mx6 functionality to State 2 by PCR Migrate selected Mx7 functionality to State 2 by PCR Incr 1 CUT Migrate to NPP only by selected State 2 PCRs Time Algorithm drops Migrate selected algorithm drops to State 2 by PCR Algorithm drops Migrate selected algorithm drops to State 2 by PCR Mx5 Incr 1 CUT Incr 1 CUT Wholesale migration from NPP to State 2 NPP State 2 Shared_csi branches = development and integrationi branches = official deployment

3 JPSS Common Ground System Page 3 Relevant Work Instructions 2/2/2011 PCRs  CDM-J-119 Problem Change Report (PCR) Life Cycle.docx  CDM-J-064 Problem Change Report Board (PCRB) Process.docx Baseline Management  CDM-J-056A Software Build Release and Deployment Review.docx  CDM-J-170 Release Content Review.docx  SE-J-166 Maintenance Release Review.doc Branching SW-J-199 Mini Increment Development Approach.docx


Download ppt "JPSS Common Ground System Baseline Management Process IDPS Splinter May 10, 2011."

Similar presentations


Ads by Google