HYDROFORMING PROCESS SHORT DESCRIPTION DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from John Andersen.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Clark–Reliance Company Manufacturing Update Presented to General Electric July 17, 2007.
Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
Columbia Machine Core Grinding Team Members Aaron Jeter Jimmie Teague Leland Rutledge Travis Huber Academic Advisor Dr. C. Wern Industry Contacts Mark.
Excavating and Lifting Hmwk Ch 2 # 1,2,5,8 Ch 3 #2,4,6,10.
Design and Manufacturing
Computer Integrated Manufacturing CIM
US SKA TDP Hydroforming Production Cost Rev B 12m Primary & Support Structure US SKA Antenna Working Group Meeting May 7, 2009, Los Angeles, California.
ALTERNATIVE MECHANICALS DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from Jack Welch Roger Schultz Gordon Lacy.
ATA - 42 Antenna & Zone Cost Summary Matt Fleming Part B of a two part presentation Part A Antenna & Zone Design Summary Part B Antenna & Zone.
Matt Fleming Hydroformed Reflector Time & Materials Cost Estimate SKA US TDP Matt Fleming
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
CURRENT SKA TDP ANTENNA DESIGN 10 DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from Jack Welch Roger Schultz Gordon Lacy.
SKA TDP & CART 15m (DVA-1) ANTENNA DESIGN 11 US SKA Consortium Meeting at Arlington VA June 3-4, 2010 Matt Fleming Contributions from Jack Welch Roger.
Fall Protection in the Roofing Industry
Department of Industrial and Engineering Technology College of Science and Technology Morehead State University IET 317 Group 5 Project Group Members:
Post-Molded Part Finishing PLET 370 Mike Alabran Andrew Magenau Bret Neese.
Felix Alamo Career Portals Ms.Estep 7 th Grade 7 th Period 10/15-10/17.
Jigs and Fixtures.
Planning for CNC Operations. Coordination of 5 functions u 1. NC management - shop supervisor u 2. Part programming - programmer u 3. Machine operators.
ORT-E A turn-key Engineering Based Manufacturer and systems integrator. Oak Ridge Tool Engineering, Inc. Oak Ridge Tool Engineering, Inc. Engineering Systems.
Manufacturing Engineering Objectives:  Create product structure charts, BOM’s and routing sheets  Determine appropriate manufacturing process  Evaluate.
1 AATC, Inc W. Catalina Dr. Phoenix, AZ USA AATC PRESENTATION – INVESTMENT CASTING PROCESS (2 OF 3 – PRESENTATIONS – REVISION.
Customer Presentation West River Rd. South Elyria, OH 44035—Phone: Fax:
Developed By Jared Storrs and Anthony Vick Masters Project Engineering Technology and Education Dept. Utah State University Materials and Processes Intro.
Process Planning and Computer Aided Process Planning
Instructions for Printing Fluid Power Task Cards Print slides 2-5 and then take to a copy machine to make double sided copies Copy slide 2 to the front.
How is a manufacturing facility planned?
P13458 RIT Senior Design Team May 10, :30AM Dresser- Rand, Painted Post Final Presentation:
Roof and Ceiling Framing
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
COMPACT MOBILE LIFTING DEVICE Team 3 Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Sponsor: Fraunhofer Advisor: Dr. Michael Keefe Innovative Lifting.
SKA Dishes, CSIRO February 2013 SKA Dish Verification Antenna #1 Gary Hovey Astronomy Technology Program – Penticton 12 February 2013.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
NSF 61 - Purkiss December 1, Diluted Surface Area- Section 3 Current Requirements of Section 3.2 require 100% complete formulation information for.
SHEET METAL FORMING PROCESS / PRESS WORKING OF SHEET METALS
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Sensors for Clear Object Detection
Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,
A special type of die forming using a high pressure Hydraulic fluid to press room temperature working material into a die.
Competency 7.00 Competency 7.00 Develop an Awareness of the Designed World CommunicationTransportationManufacturingStructural Energy and Power Biotechnology.
MILLING By: Jacob Eames. setup The time required to produce a given quantity of parts includes the initial setup time and the cycle time for each part.
US SKA TDP Antenna Design Progress US SKA AWG Meeting May 6, 2009, Los Angeles. California Matt Fleming Contributions from Jack Welch Roger Schultz Sandy.
PLANER MILLING MACHINE ACCOMMODATED WITH DRILL-HEAD.
PRODUCTION PLANNING. Process Planning Management Approval design production.
FLUID POWER CONTROL ME604C. Extent of the Subject: FLUID POWER & CONTROL Some beautiful examples: 1...\video\Edited\Excavetor working.mp4..\video\Edited\Excavetor.
Chapter 1 Introduction EIN 3390 Manufacturing Processes Summer A, 2012.
Innovative Toolings & Automation Solution P-1 Contact No Mail id: Company address: 23, 24, Shivam Industrial estate, Near Hotel.
AURA LASERFAB PVT. LTD. An ISO 9001:2008 Certified Company Complete solution provider for METAL FABRICATION & ASSEMBLY.
Designed for Functionality, Engineered for Reliability 1.
Installation Walkthrough Image Guide
STEP 1: ASSEMBLE ANGLE PLATES
Planning for Proto-DUNE PD Installation and Cabling at CERN
ISLANDS OF AUTOMATION.
Project Overview CNC Introduction Applying CNC Designing for CNC
THE COMPANY OPTIKRON, your partner for micro-optics, assemblies and optical coatings was founded in 1992 in the optics and technology region of Jena. We.
SOAR AZIMUTH DRIVE The SOAR azimuth drive systems has 4 motor+gearbox units, two pairs with backlash tuning. (600 kg box) Each subsystem is bolted to.
SHEET METALWORKING Cutting Operations
Chapter 10 Production Planning.
Apparel management & quality control
Visit for more Learning Resources
RDR Baseline Layouts for Interaction Region
Magnet, Support and Infrastructure
Production process- your product processing cards, technology
Neutron guide Shielding Concept
Manufacturing process 15
Presentation transcript:

HYDROFORMING PROCESS SHORT DESCRIPTION DVA1 Meeting at NSF Arlington VA April 15-16, 2010 Matt Fleming Contributions from John Andersen

Process Stations ( letters ) DVA1, NSF, Arlington, Matt Fleming slide 2 of 8 A Supply Station B Texture Station ( unsure on this )( not shown ) C Cutting Station D Seam Welding Station E Form Prep Station F Forming Station G Back Assembly Station. ( rim & back ) H Front Assembly Station.

Stations Tasks ( first ) DVA1, NSF, Arlington, Matt Fleming slide 3 of 8 1 Concrete floor foundation. 2 Building or cover ( not shown ) 3 Crane with dual hoists ( maybe 2 cranes ) 4 Coil feed system 5 Cutting machine ( laser plasma or water ) 6 Seam welding machine & table. 7 Welded & prepped reflector blank. 8 Forming mold. 9 Forming pressure back plate. 10 Hold down devices.

Stations Tasks ( second ) DVA1, NSF, Arlington, Matt Fleming slide 4 of 8 11 Reflector lift and flip device ( not shown ) 12 Reflector concave up. ( for weld rim ) 13 Backing frame. 14 Backing spars. 15 Other components on back side. 16 Reflector & support lifting tool. ( not shown ) 17 Secondary & other components on front side.

Mold Proposal DVA1, NSF, Arlington, Matt Fleming slide 5 of 8 Forming down into a mold supported from a foundation allows better dimensional control and access to surface maintenance Mold would be manufactured in segments surface filled and generated on site.

Mold Proposal DVA1, NSF, Arlington, Matt Fleming slide 6 of 8 Edge shape is very critical and carries very high forces. Edge elements require precision machined steel.

Mold Parts DVA1, NSF, Arlington, Matt Fleming slide 7 of 8

Path to Conclusions Process Analysis Define optics size and shape Define edge shape and edge holding Consult with industrial partners with experience Perform analysis on repeatability ( Ohio State 12m & 15m ) Evaluate results express conclusions for SKA antenna Production Cost Estimate ( revised ) Redo preliminary cost estimate Secure review and comments from industrial partners. DVA1, NSF, Arlington, Matt Fleming slide 8 of 8 Very preliminary tooling and process costs on next 2 slides

Process Tasks ( preliminary ) DVA1, NSF, Arlington, Matt Fleming slide A TasksMtrlLaborTimeWorkers Raw material & handling Metal cutting process.$ Welding Process.$ Surface texture process.$ Blank installaton process Forming process Part removal process Inspection process.$ Trim deburr.$ Storage process.$ Repeat prep & cleanup Total forming cost:$190$1,3006hrs

Tooling Cost ( preliminary ) DVA1, NSF, Arlington, Matt Fleming slide B Costs based on educated guesses Coil equip15,000 Cutting equip35,000 Welding equip45,000 Texture equip32,000 Press ( no mold )500,000 Custom Mold1,420,000 Lifting fixtures8,000 Inspection table7,000 Transport carts7,500 Storage racks12,000 Shipping fixtures26,000 Total forming equip$2,157,500 See separate slide Really big guess