COBRA Magnet 2002200320042005 Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.

Slides:



Advertisements
Similar presentations
P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
Advertisements

2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
7/5/05,MEG DC,je MEG DC 1.Foils 2.Wires 3.Frames + tools 4.Preamplifier 5.Gas pressure control 6.final.
P.-R. KettleMEG Review July MEG Beam Line Studies.
A. Baldini PSI July 04 General Introduction Work done in the past 4 months presented in the individual sub-detectors talks: highlights Construction is.
INFN of Genova, Pavia and Roma Flavio Gatti, PSI, February 9 th, Timing Counter status Timing Counter status.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
Xenon Detector Xenon Detector Group. 1 Contents Cryostat Construction Detector Preparation Schedule.
Xenon Detector Status Liquid Xenon Detector Group.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
A. Baldini PSI 18 July 2007 MEG Overview Cobra (W. Ootani) LXe calorimeter (S. Mihara) Calibrations (G. Signorelli) Drift Chambers (J. Egger) Timing counter.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
Liquid Xenon Photon Detector Feb MEG Review Meeting Liquid Xenon Detector Part I CEX beam test at piE1 Oct-Dec/03 –Hardware operation status –Analysis.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.
Timing Counter Report of Feb. 14 th, 2007 P.W. Cattaneo.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MEG 実験用液体キセノン検出器の現状 東京大学素粒子物理国際研究センター 澤田龍 他 MEG カロリメータグループ 2007 年 9 月 24 日 日本物理学会 第 62 回年次大会 北海道大学.
The DRS2 Chip: A 4.5 GHz Waveform Digitizing Chip for the MEG Experiment Stefan Ritt Paul Scherrer Institute, Switzerland.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
PSI - 11 Feb The Trigger System of the MEG Experiment Marco Grassi INFN - Pisa On behalf of D. Nicolò F. Morsani S. Galeotti.
The MEG Experiment T. Mori for the MEG Collaboration.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Overview of the experiment Collaboration (about 30 physicists at this meeting) Budget Realistic schedule and general status (few words) of each sub-detector.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Xenon Detector Installation schedule Satoshi MIHARA.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
Detectors for VEPP-2000 B.Khazin Budker Institute of Nuclear Physics 2 March 2006.
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
Genova/Pavia/Roma Flavio Gatti, PSI, 11 February, Timing Counter: january 2004.
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
P.-R. KettleMEG-Review July MEG Beam Line Studies  E5 Z-Branch Collaborative Effort !!! Effort !!!  E5 Z-Branch Collaborative Effort !!! Effort.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
Status of the Solenoid Status of procurement Plans for transport Storage and tests on arrival at CERN Installation in the ISOLDE Hall Location Footprint.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
9 Feb, MEG Software Status -for the coming review committee- Question from A.Blondel Our answer Schedule and Man power MEG Software Group.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, MEG Collaboration meeting Feb. 10th, 2004.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
g beam test of the Liquid Xe calorimeter for the MEG experiment
Installation of the T600 at Fermilab
WBS 1.03 Readout Systems Scope, Cost and Schedule
Liquid Xenon Detector for the MEG Experiment
CLAS12 First Experiment Workshop Report
Timing Counter Sept CSN I, Assisi 2004 Giorgio Cecchet.
TC status & remaining tasks
Preparation of the CLAS12 First Experiment Status and Time-Line
MEG II実験 液体キセノン検出器の建設状況
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
as a prototype for Super c-tau factory
New Results from the MEG Experiment
Presentation transcript:

COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device DesignAss.TestWinding & Cryo. Deliv. PSI Test Field Measurement Platform Can only be made after beam line commissioning Final field mapping during shutdown

Beam Test Milestone AssemblyDesignManufactoring Studies Solenoid BTS Triplet I + II Target Part 1 New Separator Beam Line Commissioning Sep+BTS+COBRACOBRA+Target GottaPrak.Gotta ? Studies Solenoid BTS Triplet I + II Target Part 1 New Separator Part 2 Beam Line Commissioning Pi beam? Platform

Test Milestone AssemblyDesignManufacturing Full Prototype Medium PrototypeCharge division & Cosmics Full Detector (18 DC) Drift Chamber Full Prototype Beam test Full Prototype Charge division & Cosmics Medium Prototype Full Detector (18 DC) outside inside COBRA Inside COBRA Full Size Prototype

COBRA Test Timing Counter Beam Test Test Milestone AssemblyDesignManufactoring Design Assembly PMT EvaluationPMT procur. Procur & Manuf. APD EvaluationAPD testAPD procur. Beam Test Design PMT EvaluationPMT procur. Procur & Manuf. APD EvaluationAPD testAPD procur. Mechanical matching BG test Full installation APD procur. New APDs

Photon Detector realistic schedule Test Milestone AssemblyDesignManufacturing Large PrototypeBeam Test Cryostat Vessel PMT Refrigerator Liq. Purification Assembly Test Engineering runs Heater replaced Neutron background measurement Base circuit design must be finalized Crane problem Neutron Shield?

Full System Test Milestone AssemblyDesignManufactoring Prototype Board Final Prototype Trigger Full System Prototype Board Final Prototype part. inst. full. inst.

DRS (DAQ) Test Milestone AssemblyDesignManufactoring DRS2 DRS2 test board DRS3 VME boards 400 chn Mass Production 3000 chn DRS1 2 nd Prototype Tests Boards & ChipTest DRS1 DRS2 Full System installation

Xenon Delivery Japan “promised”

Combined Area Schedule External Constraints –Two non-MEG beam times in ’04/’05 + “Praktikum” –Can turn on COBRA only on Wed. until fall ‘04 –Beam Transport Solenoid and Separator not ready before ’05 –Shutdown External Constraints –Two non-MEG beam times in ’04/’05 + “Praktikum” –Can turn on COBRA only on Wed. until fall ‘04 –Beam Transport Solenoid and Separator not ready before ’05 –Shutdown Internal Constraints –“Exclusive” tasks: Drift Chamber – Timing Counter – Field Mapping – Beam Line Commissioning –Schedule for different parts Internal Constraints –“Exclusive” tasks: Drift Chamber – Timing Counter – Field Mapping – Beam Line Commissioning –Schedule for different parts Goal: Detector assembled before start of beam in 2006

2004 JFMAMJJASOND Beam Time MEG Prac MEGGotta COBRA Calibration (Wed) Beam Line Commiss. Part 1 Platf. Drift Chamber Proto type Timing Counter Test Mechan. Matching LPT Neutr. BG PM + Src Inst Pi- Beam Test Liq. Purif. Full Calorimeter Trigger DAQ Test

JFMAMJJASONDJFMA Beam Time ShutdownMEGGotta?MEG Shutdown COBRA Field Map Beam Line BTS Test Commiss. Part 2 Full Beam Line Test Drift Chamber Mounting Mounting & Testing Timing Counter BG Test BG Test Inst LPT PMT testing + calibration Full Calorimeter Cryo. Installation Crane+ Tent Assembly Studies (Wed + remote) Test Trigger Inst DAQ DC Electr. Inst